November 2002 Monthly Operating Report for Perry, Unit 1
ML023520053
Person / Time
Site: Perry 
Issue date: 12/09/2002
From: Higaki V
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PY-CEI/NRR-2678L
Download: ML023520053 (3)


Text

FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road PO Box 97 Perry Ohio 44081 December 9, 2002 PY-CEIINRR-2678L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the November 2002 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector

OPERATING DATA REPORT UNIT:

Perry DATE:

12/5/02 Docket: 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period: November 2002 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1260 1235 Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)

This Month 720.0 720.0 00 904,754 0 Yr-to-Date 7574.3 7453 3 0.0 p fl43 643 0 Cumulative 104,159.5 101,5263 0.0 115_644_045 0

1.
2.
3.
4.
5.
6.

7.

8.
9.
10.

11.

Page 1

'I UNIT SHUTDOWNS REPORT MONTH - November 2002 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 12/05/02 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1

Hours 2

3

SUMMARY

The unit was on line the entire month of November 2002.
1. TYPE:

F: Forced S, Scheduled

2. REASON:

A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

License Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

3. METHOD:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2