FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road PO Box 97 Perry Ohio 44081 December 9, 2002 PY-CEIINRR-2678L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the November 2002 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
OPERATING DATA REPORT UNIT:
Perry DATE:
12/5/02 Docket: 50-440 Unit Name:
Perry Nuclear Power Plant Reporting Period: November 2002 Utility
Contact:
T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
1260 1235 Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)
This Month 720.0 720.0 00 904,754 0 Yr-to-Date 7574.3 7453 3 0.0 p fl43 643 0 Cumulative 104,159.5 101,5263 0.0 115_644_045 0
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
7.
- 8.
- 9.
- 10.
11.
Page 1
'I UNIT SHUTDOWNS REPORT MONTH - November 2002 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 12/05/02 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1
Hours 2
3
SUMMARY
- The unit was on line the entire month of November 2002.
- 1. TYPE:
F: Forced S, Scheduled
- 2. REASON:
A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &
License Examination F - Administrative G - Operational Error (explain)
H - Other (explain)
- 3. METHOD:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2