Nuclear Operating Company Sotirh ~

Ctw,~r O. & 29 BIvtb~

Tcez 77433 December 12, 2002 NOC-AE-02001436 File No.: G02 10CFR50.71 STI: 31530389 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for November 2002 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for November 2002. If you should have any questions on this matter, please contact R.L.

Hill at (361) 972-7667.

F.H. Mallen Manager, Planning &

Controls Attachments: 1)

STPEGS Unit 1 Monthly Operating Report - November 2002

2)

STPEGS Unit 2 Monthly Operating Report - November 2002

cc:

(paper copy)

(electronic copy)

Ellis W. Merschoff Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Cornelius F. O'Keefe U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MN116 Wadsworth, TX 77483 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP M. T. Hardt/W. C. Gunst City Public Service Mohan C. Thadani U. S. Nuclear Regulatory Commission R. L. Balcom/D. G. Tees Texas Genco, LP A. Ramirez City of Austin C. A. Johnson/A. C. Bakken III AEP - Central Power and Light Company Jon C. Wood Matthews & Branscomb C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT NOVEMBER 2002 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 Approved By:

OWlh-A "bL 24?C

/i&

E.D. HALPIN r m

Date

MONTHLY

SUMMARY

South Texas Project Unit 1 began the reporting period operating at full power.

On November 16, at 2042 hours0.0236 days <br />0.567 hours <br />0.00338 weeks <br />7.76981e-4 months <br />, Unit 1 was manually tripped in response to a perceived loss of all pressure associated with the Open Loop Cooling Water System. The apparent loss of pressure in the Open Loop Cooling Water system was induced by a failure of the pump casing on Circulating Water Pump 11. A pressure spike that occurred when the pump discharge valve failed closed caused the pump casing failure.

Repairs were made and the unit was returned to service on November 24, at 1520. Full power was achieved on November 25, at 1154.

OPERATING DATA REPORT DOCKET NO.

50-498 UNIT I

DATE Dec. 11, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1.

REPORTING PERIOD: 11/1/02-11/30/02 GROSS HOURS IN REPORTING PERIOD: 720

2.

CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3,853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1,250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1,250.6

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None

4.

REASONS FOR RESTRICTION (IF ANY): N/A

5.

NUMBER OF HOURS REACTOR CRITICAL

6.

REACTOR RESERVE SHUTDOWN HOURS

7.

HOURS GENERATOR ON LINE

8.

UNIT RESERVE SHUTDOWN HOURS

9.

GROSS THERMAL ENERGY GENERATED (MWH)

10.

NET ELECTRICAL ENERGY GENERATED (MWH)

11.

REACTOR SERVICE FACTOR (%)

12.

REACTOR AVAILABILITY FACTOR (%)

13.

UNIT SERVICE FACTOR (%)

14.

UNIT AVAILABILITY FACTOR (%)

15.

UNIT CAPACITY FACTOR - Using MDC (%)

16.

UNIT CAPACITY FACTOR - Using DER (%)

17.

UNIT FORCED OUTAGE RATE (%)

THIS MONTH 539.2 0

533.4 0

1,998,978 666,723 74.9 74.9 74.1 74.1 74.0 74.0 25.9 YR TO DATE 7,835.2 0

7,829.4 0

29,812,275 9,914,392 97.7 97.7 97.7 97.7 98.9 98.9 2.3 CUMULATIVE 97785.1 0

96149.1 0

359,110,615 117,262,506 78.2 78.2 76.9 76.9 75.0 75.0 13.4

18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH):

Scheduled 22-day outage to allow scheduled refueling to begin on March 26, 2003.

19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-498 UNIT 1

DATE Dec. 11, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH NOVEMBER DAY DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 1279 1280 1281 1280 1281 1274 1278 1283 1282 1282 1283 1286 1287 1287 1285 1101 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AVERAGE DAILY POWER LEVEL (MWe-Net) 0 0

0 0

0 0

0 44 1052 1279 1273 1267 1268 1270

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-498 UNIT I

DATE Dec. 11, 2002 COMPLETED BY R L Hill TELEPHONE 361.972.7667 REPORT MONTH NOVEMBER 2

3 4

5 No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)

Shutting Event Code Code Down Report #

Reactor 02-02 021116 F

186.6 A

2 01-02-003 NN P

Manual reactor trip in response to a perceived loss of all pressure associated with the Open Loop Cooling Water System. The apparent loss of pressure in the Open Loop Cooling Water system was induced by a failure of the pump casing on Circulating Water Pump 11. A pressure spike that occurred when the pump discharge valve failed closed caused the pump casing failure.

1 F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4

IEEE 805-1983 5

IEEE 803-1983

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT NOVEMBER 2002 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Approved By:

etILP E.D. HALPIN~

Date

MONTHLY

SUMMARY

South Texas Project Unit 2 remained shutdown during the reporting period for scheduled refueling and steam generator replacement.

OPERATING DATA REPORT DOCKETNO.

50-499 UNIT 2

DATE Dec. 11, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1.

REPORTING PERIOD: 11/1/02-11/30/02 GROSS HOURS IN REPORTING PERIOD: 720

2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3,800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1,250 6 DESIGN ELECTRICAL RATING (MWe-Net): 1,250.6

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None

4.

REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH NUMBER OF HOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)

NET ELECTRICAL ENERGY GENERATED (MWH)

REACTOR SERVICE FACTOR (%)

REACTOR AVAILABILITY FACTOR (%)

UNIT SERVICE FACTOR (%)

UNIT AVAILABILITY FACTOR (%)

UNIT CAPACITY FACTOR - Using MDC (%)

UNIT CAPACITY FACTOR - Using DER (%)

UNIT FORCED OUTAGE RATE (%)

0 0

0 0

0.
0.

0.0 0.0 0.0 0.0 0.0

0.

0.

YR TO DATE 6,480.3 0

6,426.8 0

24,457,687 7,962,417 80.8 80.8 80 2 80.2 79.4 79.4 2.3 CUMULATIVE 94,294.3 0

92,054.5 0

343,618,219 111,920,538 80.0 80.1 78.1 78.1 75.9 75.9 13.2 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 12/5/02

5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.

17.

18.

19.

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO.

50-499 UNIT 2

DATE Dec. 11, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH NOVEMBER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 18 19 20 21 22 23 24 25 26 27 28 29 30

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-499 UNIT 2

DATE Dec. 11, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH NOVEMBER 1

F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4

IEEE 805-1983 5

IEEE 803-1983 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)

Shutting Event Code Code Down Report #

Reactor 02-03 021002 S

720.0 C

1 N/A N/A N/A Scheduled outage to allow refueling and steam generator replacement.

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.