November 2002 Monthly Operating Report for Joseph M Farley
ML023500054
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/12/2002
From: Beasley J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NEL-02-0241
Download: ML023500054 (6)


Text

Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham. Alabama 35201 Tel 205 992 7110 Fax 205 992 0403 December 12, 2002 Docket Nos.:

50-348 50-364 NEL-02-0241 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Enclosed are the November 2002 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 5.6.4 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, RWC:mor

Enclosures:

1. November Monthly Operating Report for Plant Farley Unit 1
2. November Monthly Operating Report for Plant Farley Unit 2 J. Barnie Beasley, Jr.. P.E.

Vice President 4I SOUTHERN N..

COMPANY Energy to Serve Your Wo rld

Page 2 U. S. Nuclear Regulatory Commission cc:

Softhern Nuclear Operating Company Mr. D. E. Grissette, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.

Mr. F. Rinaldi, Licensing Project Manager-Farley U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley

OPERATING DATA REPORT DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley - Unit I DATE:

December 4,2002 COMPLETED BY:

W. L. Marlar TELEPHONE:

(334) 814-4554 OPERATING STATUS

1. Reporting Period:

NOVEMBER 2002

2.

Design Electrical Rating (Net MWe):

854

3.

Maximum Dependable Capacity (Net MWe):

833 This Month Year to Date Cumulative

4.

Number Of Hours Reactor Was Critical:

5.

Hours Generator On-line:

6.

Unit Reserve Shutdown Hours:

7.

Net Electrical Energy Generated (MWH):

720.0 720.0 0.0 610,968.0 7,955.3 7,931.7 0.0 6,625,329.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.

Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-1 180,201.2 177,899.9 0.0 140,978,275.0

UNIT SHUTDOWNS CO' REPORTING PERIOD: NOVEMBER 2002 DOCKET NO.:

50-348 UNIT NAME: J. M. Farley - Unit 1 DATE:

December 4,2002 MIPLETED BY:

W. L. Marlar TELEPHONE:

(334) 814-4554 Type Method of Date F: Forced Duration Reason Shutting Down Cause/Corrective Actions No. (YYMMDD)

S: Scheduled (Hours)

(1)

(2)

Comments There were no unit shutdowns during the month.

(1) REASON (2) METHOD A - Equipment Failure (Explain)

I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram L

D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT E1-2 There were no significant power reductions this period.

OPERATING DATA REPORT DOCKET NO.:

50-364 UNIT NAME:

J. M. Farley - Unit 2 DATE:

December 4, 2002 COMPLETED BY:

W. L. Marlar TELEPHONE:

(334) 814-4554 OPERATING STATUS

1. Reporting Period:

NOVEMBER 2002

2.

Design Electrical Rating (Net MWe):

855

3.

Maximum Dependable Capacity (Net MWe):

842 This Month Year to Date Cumulative

4. Number Of Hours Reactor Was Critical:
5.

Hours Generator On-line:

6.

Unit Reserve Shutdown Hours:

7.

Net Electrical Energy Generated (MWH):

720.0 720.0 0.0 620,150.0 6,958.7 162,444.3 6,938.8 160,484.6 0.0 0.0 5,818,984.0 128,401,063.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.

Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

E2-1

UNIT SHUTDOWNS REPORTING PERIOD: NOVEMBER 2002 DOCKET NO.:

50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: December 4, 2002 COMPLETED BY:

W. L. Marlar TELEPHONE:

(334) 814-4554 Type Method of Date F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.

(YYMMDD)

S: Scheduled (Hours)

(1)

(2)

Comments There were no unit shutdowns during the month.

(1) REASON (2) METHOD A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 -Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT E2-2 There were no significant power reductions this period.