Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham. Alabama 35201 Tel 205 992 7110 Fax 205 992 0403 December 12, 2002 Docket Nos.:
50-348 50-364 NEL-02-0241 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Enclosed are the November 2002 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 5.6.4 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, RWC:mor
Enclosures:
- 1. November Monthly Operating Report for Plant Farley Unit 1
- 2. November Monthly Operating Report for Plant Farley Unit 2 J. Barnie Beasley, Jr.. P.E.
Vice President 4I SOUTHERN N..
COMPANY Energy to Serve Your Wo rld
Page 2 U. S. Nuclear Regulatory Commission cc:
Softhern Nuclear Operating Company Mr. D. E. Grissette, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.
Mr. F. Rinaldi, Licensing Project Manager-Farley U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley
OPERATING DATA REPORT DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit I DATE:
December 4,2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 OPERATING STATUS
- 1. Reporting Period:
NOVEMBER 2002
- 2.
Design Electrical Rating (Net MWe):
854
- 3.
Maximum Dependable Capacity (Net MWe):
833 This Month Year to Date Cumulative
- 4.
Number Of Hours Reactor Was Critical:
- 5.
Hours Generator On-line:
- 6.
Unit Reserve Shutdown Hours:
- 7.
Net Electrical Energy Generated (MWH):
720.0 720.0 0.0 610,968.0 7,955.3 7,931.7 0.0 6,625,329.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.
Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
El-1 180,201.2 177,899.9 0.0 140,978,275.0
UNIT SHUTDOWNS CO' REPORTING PERIOD: NOVEMBER 2002 DOCKET NO.:
50-348 UNIT NAME: J. M. Farley - Unit 1 DATE:
December 4,2002 MIPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 Type Method of Date F: Forced Duration Reason Shutting Down Cause/Corrective Actions No. (YYMMDD)
S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
(1) REASON (2) METHOD A - Equipment Failure (Explain)
I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram L
D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT E1-2 There were no significant power reductions this period.
OPERATING DATA REPORT DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2 DATE:
December 4, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 OPERATING STATUS
- 1. Reporting Period:
NOVEMBER 2002
- 2.
Design Electrical Rating (Net MWe):
855
- 3.
Maximum Dependable Capacity (Net MWe):
842 This Month Year to Date Cumulative
- 4. Number Of Hours Reactor Was Critical:
- 5.
Hours Generator On-line:
- 6.
Unit Reserve Shutdown Hours:
- 7.
Net Electrical Energy Generated (MWH):
720.0 720.0 0.0 620,150.0 6,958.7 162,444.3 6,938.8 160,484.6 0.0 0.0 5,818,984.0 128,401,063.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.
Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
E2-1
UNIT SHUTDOWNS REPORTING PERIOD: NOVEMBER 2002 DOCKET NO.:
50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: December 4, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 Type Method of Date F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.
(YYMMDD)
S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
(1) REASON (2) METHOD A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 -Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT E2-2 There were no significant power reductions this period.