Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 December 10, 2002 3L L-2002-244 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the November 2002 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please,¢ntact us should there be any questions regarding this information.

Donald E. Jhnigan Vice President St. Lucie Plant DEJ/spt Attachments 4

an FPL Group company

DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-335 St. Lucie Unit I December 2, 2002 J. A. Rogers (772) 467-7296 REPORTING PERIOD: November 2002

1. Design Electrical Rating (Mwe-Net)
2. Maximum Dependable Capacity (Mwe-Net)..
3. Number of Hours Reactor Critical
4. Number of Hours Generator On Line
5. Unit Reserve Shutdown Hours
6. Net Electrical Energy (MWH) 830 839 MONTH 720 720 0.0 615171

-YTD 7439.5 7419.3 0.0 6279623 CUMULATIVE 184040 182206.3 0.0 148956362

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-335 St. Lucie Unit I December 2, 2002 J. A. Rogers (772) 467-7296 REPORT MONTH: November 2002 Unit operated at essentially full power through the entire month of November.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-335 St. Lucie Unit I December 2, 2002 J. A. Rogers (772) 467-7296 REPORT MONTH: November 2002 Number Date Type I Duration Reason2 Method of Cause & Corrective (Hours)

Shutting Down Action to Reactor3 Prevent Recurrence Unit I operated at essentially full power for the entire month of H

November.

3 Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain) 2 F Forced S Scheduled I

DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-389 St. Lucie Unit 2 December 2, 2002 J. A. Rogers (772) 467-7296 REPORTING PERIOD: November 2002

1. Design Electrical Rating (Mwe-Net)
2. Maximum Dependable Capacity (Mwe-Net)
3. Number of Hours Reactor Critical
4. Number of Hours Generator On Line_
5. Unit Reserve Shutdown Hours
6. Net Electrical Energy (MWH) 830 839 MONTH 720 720 0.0 609593

-YTD-CUMULATIVE 8001.4 148014.6 7998.6 146256.3 0.0 0.0 6792020 120522666

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-389 St. Lucie Unit 2 December 2, 2002 J. A. Rogers (772) 467-7296 REPORT MONTH: November 2002 Unit 2 operated at essentially full power through the entire month of November.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-389 St. Lucie Unit 2 December 2, 2002 J. A. Rogers (772) 467-7296 REPORT MONTH: November 2002 3

Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)

Number Date Type1 Duration Reason2 Method of Cause & Corrective (Hours)

Shutting Down Action to Reactor3 Prevent Recurrence Unit 2 operated at essentially full power for the entire month of November.

I 2

F Forced S Scheduled