December 12, 2002 FACILITY: R. E. Ginna Nuclear Power Plant LICENSEE: Rochester Gas and Electric Corporation
SUBJECT:
SUMMARY
OF MEETING HELD ON NOVEMBER 20, 2002, WITH ROCHESTER GAS AND ELECTRIC CORPORATION RE: PROPOSED DIGITAL UPGRADES TO THE CONTROL ROOM EMERGENCY AIR TREATMENT SYSTEM (TAC NO. MB1887)
On November 20, 2002, representatives of the Rochester Gas and Electric Corporation (RG&E) met with the members of the U.S. Nuclear Regulatory Commission (NRC) staff in Rockville, Maryland. The purpose of the meeting was to discuss software verification and validation issues regarding the digital upgrade to the Control Room Emergency Air Treatment System. The vendor providing the digital equipment is, Syncor Radiation Management. A list of attendees is given in Enclosure 1. A copy of the handout outlining NRC staff concerns is given in Enclosure 2. During this meeting, the NRC staff and the licensee agreed that a vendor site visit should be performed to assess the vendors quality assurance program and software development process. The site visit is tentatively scheduled for the second or third week of February 2003.
/RA/
Robert Clark, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-244
Enclosures:
As stated cc w/encls: See next page
December 12, 2002 FACILITY: R. E. Ginna Nuclear Power Plant LICENSEE: Rochester Gas and Electric Corporation
SUBJECT:
SUMMARY
OF MEETING HELD ON NOVEMBER 20, 2002, WITH ROCHESTER GAS AND ELECTRIC CORPORATION RE: PROPOSED DIGITAL UPGRADES TO THE CONTROL ROOM EMERGENCY AIR TREATMENT SYSTEM (TAC NO. MB1887)
On November 20, 2002, representatives of the Rochester Gas and Electric Corporation (RG&E) met with the members of the U.S. Nuclear Regulatory Commission (NRC) staff in Rockville, Maryland. The purpose of the meeting was to discuss software verification and validation issues regarding the digital upgrade to the Control Room Emergency Air Treatment System. The vendor providing the digital equipment is, Syncor Radiation Management. A list of attendees is given in Enclosure 1. A copy of the handout outlining NRC staff concerns is given in Enclosure 2. During this meeting, the NRC staff and the licensee agreed that a vendor site visit should be performed to assess the vendors quality assurance program and software development process. The site visit is tentatively scheduled for the second or third week of February 2003.
/RA/
Robert Clark, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-244
Enclosures:
As stated cc w/encls: See next page DISTRIBUTION PUBLIC PDI-1 Rdg File SLittle RClark EMarinos CSchulten PLoeser RLaufer SRichards OGC ACRS/ACNW JZwolinski/TMarsh BPlatchek, RI TBergman File Name: C:\ORPCheckout\FileNET\ML023460334.wpd Accession No.: ML023460334 OFFICE PDI-1/PM PDI-1/LA EEIB/SC PDI-1/SC NAME RClark SLittle EMarinos PTam for RLaufer DATE 12/12/02 12/12/02 12/12/02 12/12/02 OFFICIAL RECORD COPY
R.E. Ginna Nuclear Power Plant cc:
Dr. Robert C. Mecredy Vice President, Nuclear Operations Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649 Ms. Mary Louise Meisenzahl Administrator, Monroe County Kenneth Kolaczyk, Sr. Resident Inspector Office of Emergency Preparedness R.E. Ginna Plant 1190 Scottsville Road, Suite 200 U.S. Nuclear Regulatory Commission Rochester, NY 14624 1503 Lake Road Ontario, NY 14519 Mr. Paul Eddy New York State Department of Regional Administrator, Region I Public Service U.S. Nuclear Regulatory Commission 3 Empire State Plaza, 10th Floor 475 Allendale Road Albany, NY 12223 King of Prussia, PA 19406 Mr. William M. Flynn, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Daniel F. Stenger Ballard Spahr Andrews & Ingersoll, LLP 601 13th Street, N.W., Suite 1000 South Washington, DC 20005 Ms. Thelma Wideman, Director Wayne County Emergency Management Office Wayne County Emergency Operations Center 7336 Route 31 Lyons, NY 14489
MEETING BETWEEN NRC AND ROCHESTER GAS AND ELECTRIC CORPORATION ATTENDANCE LIST NOVEMBER 20, 2002 NRC RG&E E. Marinos, NRR T. Harding P. Loeser, NRR J. Pacher R. Clark, NRR P. Swift J. Guider T. Quinn Enclosure 1
V&V ISSUES REGARDING DIGITAL UPGRADES TO EMERGENCY CONTROL ROOM AIR TREATMENT SYSTEM
- 1. The NRC staff does not have a copy of the Software Requirements Specification.
- 2. There is no Software Validation and Verification, only a validation test. It appears that no verification was done at all. This means there is no record if the system specification was compared to the software requirements, if those were compared to the code or the test requirements, or if the code was reviewed.
- 3. The Software Validation Test Procedure # 9405603 has not been verified. How does the staff know that everything was covered?
- 4. The Software Validation Test Procedure # 9405603 seems incomplete. Throughout the test there are requirements to see if xxx relay is energized, without any hint as to how to determine this. The staff could not run the test from this test procedure.
- 5. The completed Software Test Data Sheets have a pass, the testers name (not readable) and the date (10-29-02) written in on the first test of the first page. All other tests, 55 pages worth, have a vertical line on the page for results, tester and date. Is the staff to assume that all tests were done on the same day?
- 6. There was one Test Incident Report attached to the Software Test Data Sheets. There is no indication of corrective action.
- 7. The staff does not understand how the digital system works. There does not seem to be a theory of operations section. There is much discussion on various features, but not on how the system operates, such as a signal flow walk through.
- 8. The Installation, Operation & Maintenance Instruction Manual is for an Area Monitoring System Model 955A Ginna is using a model 956. Is the 955 manual applicable?
- 9. The block diagram on pages 4-24, 25, and 26 of the Installation, Operation &
Maintenance Instruction Manual seems incomplete, i.e., where does the control signal bus come from, and how do the sensor values get into the system?
Enclosure 2