ML023450114
| ML023450114 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/13/2002 |
| From: | King D NRC/ADM/DCPM |
| To: | Beckman V Beckman & Associates |
| References | |
| Job Code J2548, NRC-03-98-021 | |
| Download: ML023450114 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Beckman and Associates, Inc.
Attn: Vicki Beckman 1071 State Route 136 Belle Vernon, PA 15012
SUBJECT:
"TASK ORDER NO. 132 "COMANCHE PEAK SAFETY SYSTEM DESIGN AND PERFORMANCE CAPABILITY INSPECTION (SSDPCI)" UNDER CONTRACT NO. NRC-03-98-021
Dear Ms. Beckman:
In accordance with Section G.5, Task Order Procedures, of the subject contract, this letter definitizes the subject task order. The effort shall be performed in accordance with the enclosed Statement of Work.
Task Order No. 132 shall be in effect from November 8, 2002, through December 31, 2002, with a cost ceiling of $28,593.48. The amount of $27,693.44 represents the estimated reimbursable costs, the amount of $900.04 represents the fixed fee.
Accounting data for Task Order No. 132 is as follows:
B&R No.:
Job Code:
BOC:
APPN No.:
FFS#:
Oblig. Amt.:
320-15-103-142 J-2548 252A 31 X0200.320 NRR98021132
$28,593.48 The followin individual is sidered to be essential to the successful performance for work hereunderW.
The Contractor agrees that such personnel shall not be removed from the effort under the task order without compliance with Contract Clause H.4, Key Personnel.
The issuance of this task order does not amend any terms or conditions of the subject contract.
TEMPLATE -ADMO0l A, 002
Your contacts during the course of this task order are:
Technical Matters:
Donald P. Norkin Project Officer (301) 415-2954 Contractual Matters:
Mona Selden Contract Specialist (301) 415-7907 Acceptance of Task Order No. 132 should be made by having an official, authorized to bind your organization, execute three copies of this document in the space provided and return two copies to the Contract Specialist. You should retain the third copy for your records.
Sincerely, Donald A. King, Contracting Officer Contract Management Center 1 Division of Contracts Office of Administration
Enclosure:
Statement of Work ACCEPT Task Order Na.132 NAME TITLE DATE
TRAVEL (for estimating purposes only)
One 4 day trip to the Region office.
Two 5 day trips to the plant site.
The contractor shall coordinate all travel arrangements in advance with the NRC Team Leader.
NRC FURNISHED MATERIAL Documents required to prepare for the inspection will be provided by the NRC Team Leader.
OTHER APPLICABLE INFORMATION The work specified in this SOW is 100% licensee fee recoverable. The contractor shall provide fee recovery information in the monthly progress reports in accordance with the requirements of the basic contract.
3