d~h Entergy Operations, Inc.

1448 SR 333 Russellville, AR 72802 Tel 501 858 5000 10CFR50.59(d)(2) 0CAN120202 December 4, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 10CFR50.59 Summary Report

Dear Sir or Madam:

In accordance with 10CFR50.59(d)(2), enclosed is the Arkansas Nuclear One (ANO), Unit 2 1 0CFR50.59 report for the time period ending November 4, 2002. This report contains a brief description of changes in procedures, changes in the facility as described in the Safety Analysis Report (SAR), and changes in the Technical Requirements Manual (TRM).

The report also contains a description of tests and experiments conducted which were not described in the SAR, and other changes to the SAR for which a safety analysis was conducted. A copy of the completed safety evaluation for each change is also included. This summary report also includes evaluations that were common to both Unit 1 and Unit 2. The enclosed documents are provided on.CD-ROM.

Should you have any questions, please contact Stephenie Pyle at 479-858-4704.

Sincerely, Sherre R. Cotton Director, Nuclear Safety Assurance SRC/slp Enclosure

U.S. NRC OCAN120202 cc:

Mr. Ellis W. Merschoff Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. William Reckley Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Alexion Washington, DC 20555-0001

Arkansas Nuclear One - Unit 2 and Common Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 10CFR50.59 Report This report contains a brief description of changes in procedures and in the facility as described in the Safety Analysis Report (SAR), tests and experiments conducted which were not described in the SAR, and other changes to the SAR for which a safety analysis was conducted. This report also contains the safety evaluation for each change. Included with this summary report are evaluations that were common to both ANO Unit 1 and Unit 2. This report is applicable for the period from July 11, 2001 to November 4, 2002.

The safety evaluations included in this report were performed in accordance with 10CFR50.59 and determined that none of the changes required prior NRC approval.

50.59 Summary Report Tuesday, December 03,2002 rage oi.

Page I of 3 50.59 Number 1999-50 2000- 2 2000 - 22 2000- 23 2000- 24 2000- 26 2001-9 2001-20 2001-26 2001-27 2001-35 2001 - 39 2001-40 2001-42 2001 - 44 2001 - 45 2001-47 2001 - 51 2001-53 2002-1 Initiating Document PROC 1000.043 DCP 974991N204 TAP 00-2-02 ER 002387E201 PROC 1000.152 DCP 980642D208 TAP 1-2-001 NCP 003266N201 ER 963230D201 ER 980507E201 ER 002546E201 ER 010705E201 ER 991659E201 TRM Revision ER-ANO-1 998-0547-058 ER-ANO-2001-0377-002 LIR 01-0066 ER002528E202 ER 991909E303/ TAP 01-0-002 TAP 02-2-001 Summary Unit 2 Steam Generator Water Chemistry Monitoring Installed Injection Unes from Molar Ratio Skid to 2E IAB Outlet Vacuum Gauge for Steam Trap Discharge Monitoring Vacuum System Copper Instrument Tubing Replacement Unit I and 2 Fire Protection System Specifications Unit 2 Steam Generator Replacement Project - Main Steam and Feedwater Piping 2P-89B Recirculation Une Orifice Bypass Test Header Main Feedwater Hydrazine Analyzer Replacements 2E1 1AfB Condenser Tube Bundle Replacement Changed 2DW-214 and 2DW-215 to Normally Closed Incorporated the Use of Earthquake and Seismic Testing Experience into the ANO-2 Licensing Basis Clarifies the stop valve testing duration as defined in TRM 4.3 4.1.2 Addresses Implied Leakage Criteria Removed Shutdown Actions for Charging Pumps Incorporated New Setpoints for the Unit 2 PPS for Cycle 16 Power Uprate Added a Manual Gate Valve into the 2DBC-3 Piping Upstream of 2CV-0798-1 (EFW test/flush line)

Power Uprate Evaluation Evaluation to Provide Umitations on Entry into the Reactor Building Temporary Installation of Mechanical Jumpers on the Screen Wash Piping System Installation of ESFAS Auxiliary Relay Cabinet Temporary Power Supply Tuesday, December 03, 2002

Tuesday. December 03.2002 Page 2 of 3 Page 2 of 3 Tuesday, December 03, 2002 50.59 Number 2002-2 2002-3 2002-4 2002-5 2002 - 6 2002-7 2002-8 2002-9 2002-10 2002-11 2002-12 2002-13 2002-14 2002-15 2002-16 2002-17 2002-18 2002-20 2002-21 2002-25 Initiating Document ER 93-R-0007-01 ER-ANO-2000-2796-008 Danger Tag A2-00-3237 ER-ANO-2002-0226-000 ER-ANO-2002-0017-000

/ TAP 02-2-002 ER-ANO-2002-0141-000 TRM Change ER 01-R-2008-03 ER-002344-E201 TAP-02-0-001 TAP-02-2-004 TAP-02-2-005 OP-2409.738 TAP-02-2-003 TAP-02-2-009 ER 01-R-2008-04 OP-2202 010, 2202.003, and 2202.009 ER-ANO-2000-3151-003 ER-ANO-2002-0053-000 ER-ANO-2002-0897-000 Summary Supplement to the 1995 50 59 Review of ER 93-R 0007-01 Installation of the Second Generation Mechanical Nozzle Seal Assemblies Danger Tag Clearance to Isolate PASS and Maintain Configuration Control dunng Installation of ER003264E201 Deferral of Turbine Valve Testing Temporary Installation of a Spent Fuel Pool Reverse Osmosis Unit Removed the Autostart Portion of the Control Circuits Associated with 2VEF-56A and 2VEF-56B Allowed for Movement of Fuel Based Upon Heat Load in the Spent Fuel Pool ANO-2 Cycle 16 Reload Analysis Report Power Uprate Roll-up Temporary Installation of a Pump to the Fire Water System Test Header Temporary Installation of a Cooling Water Connecton Between the Plant Fire Water System and the Control Room Chiller Temporary Installation of a Cooling Water Connection Between the Plant Fire Water System and the Auxiliary Building Extension Chiller Acton for Uncoupling CEA 65 Installation of a Temporary Equivalent Capacity Fire Hose Temporary Installation of Temporary Chiller ANO-2 Cycle 16 COLR Standard Attachments, LOCA, and Functional Recovery Breathing Air Compressor C29 Abandoned in Place Removed Switch 2FIS-1216 from the 2K427 Window

  1. 11 Alarm Circuit Deferral of Turbine Valve Testing

2002-29 ER-2002-0780-000, TAP Temporary Installation of a Mechanical Jumper 02-2-002 Between the Fire System Test Header and Yard Hydrant H-1 2002 - 36 TAP 02-1-004, MAI 72719 Temporary Alteration to Install a Blind Flange/Spool Piece Configuration for SW-8C so SFP Cooling Can be Maintained Tuesday. Deceniber 03, 2002 Page 3 of 3 50.59 Number Initiating Document Summary Page 3 of 3 Tuesday, December 03, 2002