ML023360128

From kanterella
Jump to navigation Jump to search
Inspection Date for Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures - River Bend Station
ML023360128
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/29/2002
From: Troy Pruett
Plant Support Branch Region IV
To: Hinnenkamp P
Entergy Operations
References
Download: ML023360128 (4)


Text

November 29, 2002 Paul D. Hinnenkamp Vice President - Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775

SUBJECT:

INSPECTION DATE FOR TEMPORARY INSTRUCTION 2515/148, INSPECTION OF NUCLEAR REACTOR SAFEGUARDS INTERIM COMPENSATORY MEASURES - RIVER BEND STATION

Dear Mr. Hinnenkamp:

In the mid-cycle assessment letter transmitted on August 26, 2002, the NRC indicated that a follow-up letter would be needed to describe the dates for implementing the temporary instruction that would be used to verify compliance with the NRC Security Order issued on February 25, 2002.

Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures, was issued August 28, 2002. The NRC has scheduled an inspection using this temporary instruction, at your facility February 3-7, 2003.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If you have questions about this inspection, please contact me at 817/860-8182.

Sincerely,

/RA/

T. W. Pruett, Chief Plant Support Branch Division of Reactor Safety Docket: 50-458 License: NPF-47

Entergy Operations, Inc. cc:

Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 General Manager Plant Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 Director - Nuclear Safety River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 Mark J. Wetterhahn, Esq.

Winston & Strawn 1401 L Street, N.W.

Washington, DC 20005-3502 Manager - Licensing River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 The Honorable Richard P. Ieyoub Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, Louisiana 70804-9005

Entergy Operations, Inc. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, Louisiana 70806 President West Feliciana Parish Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775 Michael E. Henry, State Liaison Officer Department of Environmental Quality P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326

Entergy Operations, Inc. Electronic distribution by RIV:

Regional Administrator (EWM)

DRP Director (ATH)

DRS Director (DDC)

Senior Resident Inspector (PJA)

Branch Chief, DRP/B (DNG)

Senior Project Engineer, DRP/B (RAK1)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (NBH)

Scott Morris (SAM1)

RBS Site Secretary (LGD)

DOCUMENT NAME: R:\_RB\2002\ICM-RB.WPD RIV:DRS\PSB C:PSB GPick:nlh TWPruett

/RA/ /RA/

11/29/02 11/29/02 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax