Adoption of Boiling Water Reactor Vessel Internals Project (BWRVIP) -75 Weld Examination Schedule - Response to NRC Request
ML023290368
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 11/21/2002
From: Abney T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-88-001, NUREG-0313, Rev. 2, R08 021121 703, TAC MB3771, TAC MB3772
Download: ML023290368 (3)


Text

R08 021121 703 November 21, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Gentlemen:

In the Matter of )

Docket Nos. 50-260 Tennessee Valley Authority )

50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 2 AND 3 - ADOPTION OF BOILING WATER REACTOR VESSEL INTERNALS PROJECT (BWRVIP)-75 WELD EXAMINATION SCHEDULE - RESPONSE TO NRC REQUEST (TAC NOS. MB3771 AND MB3772)

By letter dated January 8, 2002, TVA submitted a request to adopt the revised austentic stainless steel piping weld inspection schedule criteria (with modifications) contained in the Electric Power Research Institute (EPRI) report TR-113932 (BWRVIP-75). Previously, BFN was using the schedule established in NUREG-0313, Revision 2, to address the staffs positions described in Generic Letter (GL) 88-01. The NRC staff evaluated and accepted TVAs request in a safety evaluation (SE) transmitted by letter dated March 15, 2002.

However, in that letter, the NRC staff stated that the final SE for the BWRVIP-75 report had not been issued. Consequently, the staff requested that TVA review the BWRVIP-75 final SE, upon issue, and identify any impacts, and answer any requests regarding the BFN GL 88-01 program submitted by TVAs January 8, 2002 letter.

By letter dated May 14, 2002, the NRC staff issued the final SE for the BWRVIP-75 report. TVA has reviewed the final SE for the BWRVIP-75 report and determined that there are no impacts to the

U.S. Nuclear Regulatory Commission Page 2 November 21, 2002 BFN Units 2 and 3 program as submitted in TVAs letter of January 8, 2002. In addition, the NRC requests made in the final SE were, for the most part, directed to the BWRVIP, therefore, no further action by TVA is required.

There are no new commitments contained in this letter. If you have any questions, please contact me at (256) 729-2636.

Sincerely, original signed by:

T. E. Abney Manager of Licensing and Industry Affairs cc:

(Via NRC Electronic Distribution)

Mr. Paul E. Fredrickson, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9) 11555 Rockville Pike Rockville, Maryland 20852-2739

U.S. Nuclear Regulatory Commission Page 3 November 21, 2002 DTL:JWD:BAB cc:

A. S. Bhatnagar, PAB 1E-BFN M. J. Burzynski, BR 4X-C R. G. Jones, POB 2C-BFN A. L. Ladd, PEC-2A-BFN J. E. Maddox, LP 6A-C D. C. Olcsvary, LP 6A-C C. M. Root, PAB 1G-BFN J. R. Rupert, LP 6A-C K. W. Singer, LP 6A-C E. J. Vigluicci, ET 11A-K R. E. Wiggall, PEC 2A-BFN NSRB Support, LP 5M-C EDMS-K s:\\lic\\submit\\subs\\BWRVIP-75 Response.doc