October 2002 Monthly Operating Report for Vogtle Units 1 & 2
ML023250277
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/08/2002
From: Gasser J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LCV-1593-J
Download: ML023250277 (5)


Text

Jeffrey'T. Gasser Vice President Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham. Alabama 35201 Tel 205 992.7721 Fax 205 992.0403 SOUTHERN A COMPANY Energy to Serve Your World' November 8, 2002 Docket Nos. 50-424 50425 LCV-1593-J U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - OCTOBER 2002 Enclosed are the October 2002 monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with Technical Specification 5.6.4.

Sincerely, Jeffrey T. Gasser JTG/NJS Enclosures El - VEGP Unit 1 Monthly Operating Report - October 2002 E2 - VEGP Unit 2 Monthly Operating Report - October 2002 xc: Southern Nuclear Operating Company Mr. M. Sheibani SNC Document Management U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, Licensing Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle 7-

OPERATING DATA REPORT Docket No.:

Unit Name:

Date*

Completed By:

Telephone:

50-424 VEGP UNIT 1 November 1, 2002 Andrew R. Cato (706) 826-3823 Operating Status

1. Reporting Period:
2. Design Electrical Rating (Net MWe).

3 Maximum Dependable Capacity (Net MWe):

4.
5.
6.

7.

Number Of Hours Reactor Was Critical Hours Generator On Line:

Unit Reserve Shutdown Hours, Net Electncal Energy Generated (MWHe):

October 2002 1169 1148 This Month 745 0 745 0 00 875,254 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date (YYMMDD)

Tag No Event Description N/A N/A N/A E1-1 Year-To-Date 6248 0 6186.1 00 7,188,521 Cumulative 120,857.5 119,338.7 00 133,634,587

UNIT SHUTDOWNS Reporting Period:

Docket No.:

Unit Name:

Date:

Completed By:

Telephone',

50-424 VEGP UNIT 1 November 1, 2002 Andrew R. Cato (706) 826-3823 October 2002 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.

Date (YYMMDD)

S: Scheduled (Hours)

Reason (1)

Down (2)

Comments NIA N/A NIA N/A N/A NIA N/A (1) REASON-(2) METHOD:

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F -Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS:

EVENT:

CAUSE CORRECTIVE ACTION CRITICAL PATH WAS NARRATIVE REPORT October 01 00 00 Unit 1 at 100% power with no significant operating problems.

October 31 23 59 Unit 1 at 100% power with no significant operating problems.

E1-2

OPERATING DATA REPORT Docket No.:

Unit Name.

Date:

Completed By:

Telephones 50-425 VEGP UNIT 2 November 1, 2002 Andrew R. Cato (706) 826-3823 Operating Status

1. Reporting Period:
2. Design Electrical Rating (Net MWe):

3 Maximum Dependable Capacity (Net MWe):

4. Number Of Hours Reactor Was Cntical.
5. Hours Generator On Une"
6. Unit Reserve Shutdown Hours*
7. Net Electrical Energy Generated (MWHe)"

October 2002 1169 1149 This Month 1224 1220 00 118,116 Year-To-Date 6673.4 6673 0 00 7,782,983 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES E2-1 Cumulative 107,727.2 106,9137 00 120,575,449 Date (YYMMDD)

Tag No.

Event Description N/A N/A NWA

Docket No.:

Unit Name Date:

Completed By:

Telephone:

Reporting Period:

50-425 VEGP UNIT 2 November 1, 2002 Andrew R. Cato (706) 826-3823 October 2002 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.

Date (YYMMDD)

S Scheduled (Hours)

Reason (1)

Down (2)

Comments 2002-01 02110/06 S

623 C

See Below (1) REASON.

(2) METHOD.

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Tnp/Scram 5 Other C - Refueling G - Operational Error (Explain) 3 Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSEICORRECTIVE ACTION/COMMENTS:

EVENT, 2002-01 CAUSE-Scheduled Refueling Outage CORRECTIVE ACTION Cooldown to 110 Deg F, vessel disassembly, fuel off load, mid-loop maintenance, re-load In core, reassemble vessel, fill and vent reactor vessel, and complete prerequisites for mode changes.

CRITICAL PATH WAS*

Vessel disassembly, fuel off load, mid-loop work, fuel load and vessel reassembly, and Main Generator Rewind NARRATIVE REPORT October 01 00:00 Unit 2 at 95% power In coastdown with no significant operating problems.

October 05 03.16 Unit 2 at 94% power with ramp down for Refueling beginning.

October 06 02.01 Unit 2 Main Turbine tripped at 10 5% power per Unit Operating Procedure.

October 06 02.13 Unit 2 entered Mode 2.

October 06 02.22 Unit 2 entered Mode 3.

October 06 14.12 Unit 2 entered Mode 4.

October 06 20.00 Unit 2 entered Mode 5 October 09 22:53 Unit 2 entered Mode 6 Reactor Head detensioned October 14 05.14 Unit 2 is Defueled.

October 28 21:08 Unit 2 entered mode 6. First fuel assembly in core October 31 23:59 Unit 2 in mode 6. Reactor fuel load in progress E2-2