ML023250158
Person / Time
Site: Turkey Point  
(DPR-031, DPR-041)
Issue date: 11/11/2002
From: Mcelwain J
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2002-223
Download: ML023250158 (3)


Text

FPL U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - October 2002 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the October 2002 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Veytruly yours Vice President Turkey Point Plant DRL Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company NOV 1 1 2002 L-2002-223 10 CFR 50.36

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-251 Turkey Point Unit 4 11/4/2002 David Lafleur (305) 246-7150 Reporting Period October, 2002 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power until a shutdown was commenced on 10/4/02 at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> for a main turbine steam leak repair. Upon completion of repairs, Unit 4 entered Mode 1 on 10/5/02 at 1410 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.36505e-4 months <br /> and reached 100% power on 10/6/02 at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Unit 4 remained essentially at 100% power for the rest of the month.

Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 745 6929.2 189898.7 No. of hours generator was on line (service hours) 730.6 6906.1 185481.2 Unit reserve shutdown hours 0

0 577.2 Net Electrical Energy (MWH) 508543 4801844 121906855

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-250 Turkey Point Unit 3 11/4/2002 David Lafleur (305) 246-7150 Reporting Period October, 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 745 7296 193075.8 No. of hours generator was on line (service hours) 745 7296 190744.5 Unit reserve shutdown hours 0

0 121.8 Net Electrical Energy (MWH) 525241 5159506 124303153 UNIT SHUTDOWNS No.

Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours)

(1)

Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of October 2002.