Radiological Emergency Response Plan Implementing Procedures
ML023240503
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 11/08/2002
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
NRC-02-102
Download: ML023240503 (54)


Text

Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, WI 54216-9511 Two Rivers, Wl 54241 920.755 2321 NM C Committed to Nuclear Excellence 9203882560 Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC-02-102 November 8, 2002 10 CFR 50, App. E U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Radiological Emergency Response Plan Implementing Procedures Pursuant to 10 CFR 50 Appendix E, attached is the latest revisions to the Kewaunee Nuclear Power Plant Radiological Emergency Response Plan Implementing Procedures (EPIPs). These revised procedures supersede the previously submitted procedures.

Pursuant to 10 CFR 50.4, two additional copies of this letter and attachment are hereby submitted to the Regional Administrator, U. S. Nuclear Regulatory Commission, Region III, Lisle, Illinois. As required, one copy of this letter and attachment is also submitted to the Kewaunee Nuclear Power Plant NRC Senior Resident Inspector.

Sincerely, Thomas Coutu Site Vice President SLC Attachment cc - US NRC Senior Resident Inspector, w/attach.

US NRC, Region 111 (2 copies), w/attach.

Electric Division, PSCW, w/o attach.

QA Vault, wo/attach.

DOCUMENT TRANSMITTAL KEWAUNEE NUCLEAR POWER PLANT FROM: DIANE FENCL -KNPP TRANSMITIAL DATE 11-07-2002 EMERGENCY PLAN IMPLEMENTING PROCEDURES TRANSMITTAL FORM OUTSIDE AGENCY COPIES (1-20) jS_. Campion NiRC Dochument ContC

. t- es;-(ro1)* Krista Kappelman ; PBNP - EP (10)*

SCi-mpion'-NRC-Regioni I*(2,-)** Craig Weiss - Alliant Energy (11)*

S. Campion - NRC Resident Inspector (4) (receives Appx. A phone numbers)*

S. Campion - State of Wisconsin (5)* Jill Stern - Nuclear Management Company (12)*

S. Campion - KNPP QA Vault (NRC Letter & Memo Only) (15)*

or PERSONAL COPIES (21-40) These copies are for the personal use of the listed individuals for reference emergency response.

D. Seebart (24) J. Ferris (13) T. Coutu (28)

J. Bennett (33) are REFERENCE COPIES - CUSTODIAN (41-100) These copies are for general reference by anyone. They distributed throughout the plant and corporate offices. The named individual is the responsible custodian for the procedures and shall insure they are properly maintained.

Resource Center - Training (82)

NO Library - KNPP (59)

D. Kral] - CR/SS Office (51, 56)

C. Sternitzky - ATF-2 (44)

C. Grant - TSC (50)

M. Daron - Security Building (46)

C. Grant - EOF (81) VW.Galarneau - RAF (53)

C. Grant - OSF (52) W. Galarneau - SBF/EMT (54)

W. Galarneau - RPO (55)

LOREB - STF (62, 66, 67, 68,70,72,73,74)

STF Library (43) STF (86, 87, 88)

WORKING COPIES (101-199) These copies of procedures are kept in the areas designated for use in response to an emergency.

W. Galarneau - RAF/RPO (106, 107) Simulator/Communicator (117)

M. Fencl - Security (121)

W. Galarneau - SBF/ENV (108, 109)

S. Zutz - Security Building (120)

W. Galarneau - SBF/EM Team (110, 111, 111A)

Ops Admin. (126)

W. Flint - Cold Chem/HR Sample Room (113)

C. Grant - TSC Response Binder (Partail Distribution)

S. Zutz - SBF/SEC (114) 6 D. Krall - CR/Communicator (ll )(Partial Distribution) C. Grant - EOF Response Binder (Partiai Distribution)

Originals to KNPP QA Vault Please follow the directions when updating your EPIP Manual. WATCH FOR DELETIONS!!! These are controlled procedures and random checks may be made to ensure the manuals are kept up-to-date.

  • THIS IS NOT A CONTROLLED COPY. IT IS A COPY FOR INFORMATION ONLY.

I

k KEWAUNEE NUCLEAR POWER PLANT " '

REVISION OF EMERGENCY PLAN IMPLEMENTING PROCEDURES November 07,2002 Please follow the directions listed below. If you have any questions regarding changes made to the EPIPs, please contact Dave Seebart at ext. 8719.

K>ý EPIP Index, dated 11-07-2002.

REMOVE INSERT PRCEUE "RE... .. V' PROC .DURE PROCEDURE REV. PROCEDURE REV.

EPIP-AD-19 Q EPIP-AD-19 R EPIP-EOF- 11 U EPIP-EOF- I I V EPIP-RET-02A T EPIP-RET-02A U Form EPIPF-EOF-11-02 F Form EPIPF-EOF-1 1-02 G Form EPIPF-EOF-1 1-03 F Form EPIPF-EOF- 11-03 G

[R iý . a... . . ..nd etl ' c*bpSy o.ft . s tran... ";a et ihn " y "ftan . .. .... .

Setuasgnedansmital letter, within 10 days bf transmittaldate, to.

the sender.4If you have any questions or comments, please contact Dave Seebart at 6xt. 8719..,

I CERTIFY Copy No._ (WPSC No.) of the Kewaunee Nuclear Power Plant's EPIPs has been updated.

SIGNATURE DATE Please return this sheet to DIANE FENCL.

Diae Fencl Enclosure 2

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 11-07-2002 PROC. NO. TITLE REV. DATE EP-AD Personnel Response to the Plant Emergency Siren J 01-08-2002 EPIP-AD-01 EPIP-AD-02 Emergency Class Determination AD 07-19-2002 EPIP-AD-03 KNPP Response to an Unusual Event AF 06-20-2002 KNPP Response to Alert or Higher AK 08-20-2002 EPIP-AD-04 EP-AD-5 Site Emergency Deleted 04-27-87 Emergency Response Organization Shift Relief D 05-09-2002 EPIP-AD-05 Guideline EP-AD-6 General Emergency Deleted 04-24-87 Initial Emergency Notifications AR 06-20-2002 EPIP-AD-07 Notification of Alert or Higher Deleted 02-26-96 EP-AD-8 EP-AD-9 Notification of Site Emergency Deleted 04-27-87 Notification of General Emergency Deleted 04-27-87 EP-AD-10 Emergency Radiation Controls R 04-11-2002 EPIP-AD-1 1 Personnel Assembly and Accountability Deleted 03-26-94 EP-AD-12 Personnel Evacuation Deleted 04-25-94 EP-AD-13 EP-AD-13A Limited Area Evacuation Deleted 03-01-83 Emergency Assembly/Evacuation Deleted 03-01-83 EP-AD-13B EP-AD-13C Site Evacuation Deleted 03-01-83 EP-AD-14 Search and Rescue Deleted 05-25-94 Recovery Planning and Termination P 09-12-2002 EPIP-AD-15 EP-AD-16 Occupational Injuries or Vehicle Accidents Deleted 03-14-97 During Emergencies EP-AD-17 Communications Deleted 03-05-84 Potassium Iodide Distribution P 02-27-2002 EPIP-AD-18 Protective Action Guidelines R 11-07-2002 EPIP-AD-19 PAGE 1 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 11-07-2002 TITLE KNPP Response to a Security Threat EP-ENV W 1 08-20-2002 EPIP-ENV-01 Environmental Monitoring Group Organization and Responsibilities Environmental Monitoring Team Activation x 10-02-2001 EPIP-ENV-02 I 09-26-84 Environmental Protection Director Actions and Deleted EP-ENV-3A Directives Deleted 09-26-84 EP-ENV-3B EM Team Actions W 08-20-2002 EPIP-ENV-03C Dose Projection Using RASCAL Version 2.2 Software 1-T1 Revision and Control of ISODOSE II Deleted 02-14-95 EP-ENV-3D Deleted 04-24-87 EP-ENV-3E Manual Determination of X/Q Deleted 05-30-86 EP-ENV-3F Manual Determination of X/Q (Green Bay Meteorological Data)

Deleted 06-02-89 EP-ENV-3G Manual Dose Projection Calculation Deleted 04-13-90 EP-ENV-3H Protective Action Recommendations T 08-20-2002 EPIP-ENV-04A Portable Survey Instrument Use 08-20-2002 Air Sampling and Analysis x EPIP-ENV-04B Deleted 04-13-90 Environmental Monitoring Teams EP-ENV-4C x 08-20-2002 Ground Deposition Sampling and Analysis EPIP-ENV-04C 08-20-2002 Plume Tracking for Environmental Monitoring 0 08-20-2002 EPIP-ENV-04D Teams t T 04-14-86 LCS-I Operation Deleted 04-14-86 EP-ENV-5A EP-ENV-5B MS-3 Operation Deleted 04-14-86 EP-ENV-5C SAM II Operation Deleted 04-14-86 EP-ENV-5D Deleted PAC-4G (Alpha Counter) Operation 04-14-86 Deleted 08-27-85 EP-ENV-5E Reuter-Stokes Operation PAGE 2 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 11-07-2002 TITLE REV. DATE Data Analysis, Dose Projections and Protective Deleted 12-21-81 Action Recommendations Alternate Sample Analysis and Relocation of EM Deleted 04-14-86 Team Relocation of Site Access Facility (Habitability) Deleted 03-23-84 Deleted 03-23 -84 SAF Environmental Sample Analysis Relocation t 09-26-84 Site Access Facility Communications Deleted 09-26-84 Deleted 04-14-86 Total Population Dose Estimate Calculations EP-EOF Deleted 03-11-94 EP-EOF-1 Corporate Emergency Response Organization AA 08-06-2002 EPIP-EOF-02 Emergency Operations Facility (EOF) Activation AC 02-06-2002 EPIP-EOF-03 EOF Staff Action for Unusual Event I 08-06-2002 EPIP-EOF-04 EOF Staff Action for Alert or Higher AJ t t 04-24-87 Corporate Staff Action for Site Emergency Deleted 04-24-87 EP-EOF-5 I I Deleted 04-24-87 EP-EOF-6 Corporate Staff Action for General Emergency Deleted 04-06-94 EP-EOF-7 Notification of Unusual Event Deleted 03-01-83 EP-EOF-8 Relocation of EOF

- I 06-20-2002 EPIP-EOF-08 Continuing Emergency Notifications X 03-05-84 EP-EOF-9 Interface with Support Organizations Deleted 04-24-87 EP-EOF-9 Notification of Site Emergency Deleted Deleted 04-24-87 EP-EOF-10 Notification of General Emergency I V t 11-07-2002 Internal Communication and Documentation V 11-07-2002 EPIP-EOF-1I1 Flow Q 06-20-2002 EPIP-EOF-12 Media Center/Emergency Operation Facility/Joint Public Information Center Security PAGE 3 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 11-07-2002 PROC. NO. TITLE REV. DATE

-EP-OP -

EP-OP-1 Control Room Emergency Organization Deleted 04-24-87 EP-OP-2 Emergency Control Room Activation for Deleted 04-24-87 Emergency Response EP-OP-3 Control Room Communications Deleted 04-24-87 EP-OSF EP-OSF-1 Operation Support Facility Emergency Deleted 04-24-87 Organization EPIP-OSF-02 Operational Support Facility Operations U 02-06-2002 EPIP-OSF-03 Work Orders During an Emergency P 05-09-2002 EP-OSF-4 Operational Support Facility Communications Deleted 04-24-87 EPIP-OSF-04 Search and Rescue E 05-23-2002 EP-RET EP-RET-1 Radiation Emergency Team Organization . . Deleted 04-16-96 EPIP-RET-02 In-Plant Radiation Emergency Team V 05-23-2002 EPIP-RET-02A Radiation Protection Office/Radiological Analysis U 11-07-2002 Facility (RPO/RAF) Activation EPIP-RET-02B Gaseous Effluent Release Path, Radioactivity, and S 08-06-2002 Release Rate Determination EP-RET-2C Containment Air Sampling and Analysis Deleted 03-01-83 EPIP-RET-02D Emergency Radiation Entry Controls and M 06-12-2001 Implementation EP-RET-2E Handling of Injured Personnel Deleted 04-16-96 EP-RET-2F Personnel Decontamination Deleted 04-13-90 EPIP-RET-03 Chemistry Emergency Team 0 02-01-2000 EPIP-RET-03A Liquid Effluent Release Paths L 11-29-2001 EP-RET-3B Post-Accident Reactor Coolant Alternate Deleted 01-25-88 Sampling Procedure PAGE 4 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DA!TE--11-07-2002 TITLE REV. DATE PROC. NO.

Post Accident Operation of the High Radiation P 01-15-2002 EPIP-RET-03C Sample Room Containment Air Sampling Analysis Using CASP N 01-15-2002 EPIP-RET-03D Post Accident Operation of High Rad Sample Deleted 08-27-85 EP-RET-3E Room Inline Multiported Count Cave SBF Activation T 10-17-2002 EPIP-RET-04 EOF Radiological Monitoring Deleted 03-10-83 EP-RET-4A SBF Operation/Relocation Deleted 10-02-2001 EPIP-RET-04A Radiological Controls at Site Access Facility Deleted 07-12-94 EP-RET-4B Site Radiological Monitoring Deleted 07-12-94 EP-RET-4C SAM-HI Operation Deleted 07-12-94 EP-RET-4D Plume Projection Deleted 09-26-84 EP-RET-5 Site Boundary Dose Rates During Controlled H 10-09-2001 EPIP-RET-05 Plant Cooldown Plume Projection Deleted 04-27-87 EP-RET-5A Dose Projection Deleted 04-24-87 EP-RET-6 Radiological Analysis Facility/Radiation Deleted 04-24-87 EP-RET-7 Protection Office Communications Contamination Control of the Aurora Medical Deleted 05-23-2002 EPIP-RET-08 Center Post-Accident Population Dose L 04-16-2002 EPIP-RET-09 EP-SEC Security Organization Deleted 04-24-87 EP-SEC-1 Security Force Response to Emergencies X 02-06-2002 EPIP-SEC-02 Manual Activation of Emergency Sirens Deleted 04-16-82 EP-SEC-2A Personnel Assembly and Accountability AE 07-19-2002 EPIP-SEC-03 Security Force Actions for Dosimetry Issue P 10-02-2001 EPIP-SEC-04 PAGE 5 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 11-07-2002 PROC. NO. TITLE REV. DATE EP-SEC-5 Security Force Response to the EOF Deleted 07-28-88 EPIP-SEC-05 Personnel Evacuation G 06-20-2002 EP-TSC EPIP-TSC-01 Technical Support Center Organization and R 08-06-2002 Responsibilities EPIP-TSC-02 Technical Support Center Activation T 02-06-2002 EPIP-TSC-03 Plant Status Procedure V 10-09-2001 EPIP-TSC-04 Emergency Physical Changes, Major Equipment N 05-09-2002 Repair EP-TSC-5 Technical Support Center Communications Deleted 04-24-87 Equipment EP-TSC-6 Assessment of Reactor Core Damage Deleted 09-30-86 EPIP-TSC-07 RV Head Venting Time Calculation J 06-20-2002 EPIP-TSC-08A Calculations for Steam Release from Steam N 12-14-2001 Generators EPIP-TSC-08B* STMRLS Computer Program G 06-20-2002 EP-TSC-8C* See EP-TSC-8B Deleted 04-16-92

  • EP-TSC-SB was totally deleted; therefore, EP-TSC-8C was changed to EP-TSC-8B EP-TSC-9 Core Damage Assessment Using Released Deleted 09-30-86 Radionuclides EPIP-TSC-09A* Core Damage Assessment J 05-16-2002 EPIP-TSC-09B* CORE Computer Program Deleted 05-16-2002 EP-TSC-9C* See EP-TSC-9B Deleted 04-16-92

EPIP-TSC-10 Technical Support for IPEOPs K 05-09-2002 PAGE 6 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 11-07-2002 FIGURES EPIP FIG# Figure EPIPFG DESCRIPTION REV. DATE EP-SEC-5 Technical Support EP-FIG-o03 APPX-A-06-03 Center - KNP Floor Plan B 06-12-2001 EPIP-APPX-A-06 Site Boundary Facility EPIP-APPX-A-06 EP.FIG-005 APPX-A-06-02 KNP Floor Plan A 10-31-2000 Radiological Analysis EP-FIG-o08 APPX-A-06-01 Facility - KNP Floor Plan A 10-31-2000 EPIP-APPX-A-06 EPIP-EOF-12 Division Office Building Form EPIPF-EOF-02-01 EP-FIG-009 EOF-12-01 (2nd Floor) Floor Plan B 10-24-2000 State/County Work Area EP-FIG-012 APPX-A-06-08 WPSC D2-1 Floor Plan C 10-31-2000 EPIP-APPX-A-06 NRC Work Area EP-FIG-013 APPX-A-06-09 WPSC D2-4 Floor Plan A 10-31-2000 EPIP-APPX-A-06 Population Distribution by Geographical Sub EP-FIG-014 AD-19-01 Areas (with sectors) A 10-31-2000 EPIP-AD-19 EOF - WPSC D2-3 EPIP-APPX-A-06 EP-FIG-022 APPX-A-06-04 Floor Plan C 10-30-2001 Location of JPIC and Media Briefing Center EP-FIG-o02 EOF-12-02 Map C 06-20-2002 EPIP-EOF-12 KNP Site Map &

EP-FIG-026 SEC-05-01 Evacuation Routes C 06-20-2002 EP-SEC-5 Floor Plan - Media EP-FIG-034 Briefing Center Deleted 08-04-98 APPX-A-6 - - -

General Office EPIP-EOF-12 Building - WPSC (1st EP-RG-o35 APPX-A-06-06 Floor) Floor Plan C 10-24-2000 EPIP-APPX-A-06 Floor Plan - Corporate EP-FIG-037 - - - Response Center Deleted 08-04-98 APPX-A-6 EP,.IG-o3s - - - Floor Plan - JPIC Deleted 08-04-98 APPX-A-6 EP,.FI-039 OSF-02-01 High Priority Work A 10-02-2001 EPIP-OSF-02 EP-FIG-039A OSF-02-02 Lower Priority Work A 10-02-2001 EPIP-OSF-02 JPIC - Federal Work EP-FIG-043 APPX-A-06-10 Area - WPSC D2-9 B 12-21-2001 EPIP-APPX-A-06 JPIC - State and County Work Area EP-n-.-44 APPX-A-06-07 WPSC D2-8 C 12-21-2001 EPIP-APPX-A-06 JPIC - Utility Work EP,.IG.045 APPX-A-06-05 Area - WPSC D2-7 C 12-21-2001 EPIP-APPX-A-06 Aurora Medical Center RET-08 EP-FIG-o.6 RET-08-01 Location Deleted 05-23-2002 EPIP-APPX-A-02 --- APPX-A-02-01 ERO Call Tree Deleted 12-04-2001 PAGE 7 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: --11-07-2002 NUMBER TITLE REVISION DATE APPENDIX A APPX-A-1 Communication System Description AF 08-04-98 EPIP-APPX-A-02 Response Personnel Call List Deleted 02-06-2002 EPIP-APPX-A-03 Off-Site Telephone Numbers Deleted 02-06-2002 EPIP-APPX-A-06 KNPP Emergency Response Facility Telephone AA 12-21-2001 Numbers PAGE 8 OF 11

f, EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 11-07-2002 FORM EPIPF TITLE REV. DATE APPENDIX B EP-AD AD-07-01 Event Notice (Wisconsin Nuclear Accident Reporting Form) S 05-23-2002 AD-07-02 State Call-Back - Question Guideline C 11-15-2001 AD-11-01 Emergency Radiation Work Permit G 04-11-2002 AD-18-01 Airborne Radioiodine Dose Accountability and Potassium B 08-06-2002 Iodide Distribution AD-18-02 Record of Known Allergy To or Voluntary Refusal to Take A 02-27-2002 Potassium Iodide EP-ENV ENV-01-01 Environmental Dispatch Area Activation Checklist D 10-31-2000 ENV-01-02 EMT Status B 10-31-2000 ENV-01-03 Meteorological and Plant Status Data C 12-14-2001 ENV-01-04 EMT Orders/Field Data B 10-31-2000 ENV-02-01 EMT Activation Checklist N 08-20-2002 EP-EOF EOF-02-01 EOF Activation Checklist T 08-06-2002 EOF-02-02 EOF Deactivation Checklist M 08-06-2002 EOF-04-01 SRCL Initial Action Checklist C 12-14-2001 EOF-04-02 Telephone Communicationis Log Sheet A 12-14-2001 EOF-08-03 Fax for Emergency Declaration or Status Updates G 11-27-2001 EOF-08-05 Plant Emergency Status Report A 11-27-2001 EOF-08-06 Radiological Status Report D 11-27-2001 EOF- 11-02 Operating Status G 11-07-2002 EOF-1 1-03 Environmental Status Board G 11-07-2002 EOF-12-01 I.D. Badge Registration Form G 10-24-2000 PAGE 9 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 11-07-2002 FORM EPIPF TITLE REV. DATE EP-OSF OSF 2.2 Maintenance Work in Progress Deleted 07-08-98 OSF-03-01 Operational Support Facility Team Briefing C 12-04-2001 EP-RET RET-02A-02 Emergency Sample Worksheet E 06-05-2001 RET-02B-01 Containment Stack Release (Grab Sample) D 08-06-2002 RET-02B-02 Auxiliary Building Stack (Grab Sample) D 08-06-2002 RET-02B-03 Auxiliary Building Stack (Sping Reading) D 08-06-2002 RET-02B-04 Containment Stack (Sping Reading) C 08-06-2002 RET-02B-05 Steam Release D 08-06-2002 RET-02B-06 Field Reading (Grab Sample) B 08-06-2002 RET-04-01 SAM-2 Counting Equipment Worksheet E 06-12-2001 RET 8.3 Hospital Survey 1 - Deleted 06-05-2001 RET 8.4 Hospital Survey 2 Deleted 07-25-97 RET 8.5 Hospital Survey 3 Deleted 07-25-97 RET-08-06 Hospital Survey 4 Deleted 05-23-2002 RET-09-01 Post-Accident TLD Record Sheet D 04-16-2002 EP-SEC SEC-03.01 Emergency Accountability Log A 03-28-2000 SEC-04-01 Emergency Dosimeter Log G 06-20-2002 EP-TSC TSC-01.01 Plant Status Summary for SAM Implementation B 02-06-2002 TSC-01.02 Severe Accident Management Summary and Strategy B 02-06-2002 Recommendation TSC-01.03 Severe Accident Management - Status B 02-06-2002 PAGE 10 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 11-07-2002 FORM EPIPF TITLE REV. DATE TSC-02-01 TSC and OSF Activation Checklist 0 09-27-2001 TS C 2.2 TSC Ventilation Checklist H 04-01-99 TSC-02-03 Emergency Response Data System (ERDS) Link Initiation G 05-04-2001 Checklist TSC-02-04 TSC Chart Recorder Operation Checklist D 01-30-2001 TSC-02-05 TSC and OSF De-activation Checklist A 10-09-2001 TSC-03-01 Plant System Status L 06-12-2001 TSC-03-02 Plant Equipment Status L 06-12-2001 TSC-03-03 Environmental Status Board J 06-12-2001 TSC-03-04 Radiation Monitors I 01-08-2002 TSC-04-01 Emergency Physical Change Request G 05-09-2002 TSC-04-02 Emergency Physical Change Safety Review Deleted 05-09-2002 TSC-04-03 Emergency Physical Change Index F 08-29-2000 TSC-07-01 Head Venting Calculation G 06-20-2002 TSC-08A-01 Steam Release Data Sheet (Energy Balance) H 12-14-2001 TSC-08A-02 Steam Release Calculation Sheet (Energy Balance) G 12-14-2001 TSC-08A-03 Steam Release Data/Calculation Sheet (Open Valve) E 12-14-2001 TSC-08A-04 Steam Release Data/Calculation Sheet (STMRLS Program) D 12-14-2001 TSC-09A-0 1 Core Exit Thermocouple Data D 05-16-2002 TSC-09A-02 Fuel Rod Clad Damage Estimate D 05-16-2002 TSC-09A-03 Fuel Rod Overtemperature Damage Estimate E 05-16-2002 TSC 9A.4 Core Damage Based on Activity Ratios Deleted 05-16-2002 TSC-09A-05 Core Damage Assessment (Monitoring Data) E 05-16-2002 TSC 9A.6 Core Damage Summary Deleted 05-16-2002 PAGE 11 OF 11

No. EPIP-AD-19 Rev. R

, WISCONSIN PUBLIC SERVICE CORP.

- Title Protective Action Guidelines

ý,Kewaunee Nuclear Power Plant enc Plan Implementitn Procedure Date NOV7 2002 Page 1 of 7 Reviewed By William Bartelme Approved By W. L. Yarosz Nuclear PORC SRO Approval Of Yes 0 Yes Temporary d Safety 0 Yes Review El No El No Required El No Changes Required Related 1.0 Purpose 1.1 This procedure provides instruction for the Emergency Director (ED) initially responsible for using this procedure, upon declaration of a plant emergency, to provide off-site authorities with Protective Action Recommendations (PARs). When the Emergency Operations Facility (EOF) has been activated, the responsibility will be assumed by the Emergency Response Manager (ERM).

2.0 General Notes 2.1 The Shift Manager is the initial ED in all situations. Any transfer of this responsibility should be documented in the Shift Manager's log and communicated to all other directors.

2.2 Communication of the initial PARs should be in progress to state and local emergency government authorities within 15 minutes of the emergency level being declared or as soon as possible without further compromise to plant or public safety.

2.3 The ED, with the assistance of the Radiological Protection Director (RPD), is responsible for PARs to off-site authorities prior to EOF activation. This responsibility is assumed by the Emergency Response Manager, with the support of the Environmental Protection Director (EPD), following the EOF activation. This responsibility may not be delegated.

2.4 As more information becomes available, initial default PARs should be adjusted in accordance with Step 5.2 of this procedure.

3.0 Precautions and Limitations 3.1 PARs are normally implemented for affected populations within the 10-mile plume exposure pathway EPZ. However, DO NOT ignore populations outside the 10-mile plume exposure pathway IF projected doses or field readings indicate doses > 1 rem TEDE or > 5 rem thyroid. (See Step 5.2.10) 4.0 Initial Conditions 4.1 The Emergency Director shall classify the emergency in accordance with EPIP-AD-02, "Emergency Class Determination," prior to the implementation of this procedure.

JAappdata\procpws\draft\epip\eadl 9 doc-Christine Simmons/Christine Simmons-Dan Bouche REFERENCE USE

/.

-WISCONSIN PUBLIC SERVICE CORP.,,' No. EPIP-AD-19 -TRev. R

  • . r: .. . .... t Title Protective Action Guidelines

-,,,-,Kewaunee Nuclear Power Plant Emergency Plan Implementing Procedure Date NOV 7 2002 Page 2 of 7 5.0 Procedure Note Adverse meteorology exists if.

1. The 10 AND 60 meter wind speed is less than 5 mph, AND
2. Delta T is greaterthan +2.4"FOR Sigma Theta is less than 3.01 degrees.

(Refer to GraphicDisplay #52from the PPCS terminal.)

5.1 Initial PARs for the appropriate emergency class.

5.1.1 General Emergency

a. IF adverse meteorology exists, THEN recommend to off-site authorities using Form EPIPF-AD-07-01, "Event Notice (Wisconsin Nuclear Accident Reporting Form)," Section 9 to evacuate:
  • (C) 0-5 mile radius
b. IF adverse meteorology DOES NOT exist, THEN recommend to off-site authorities using Form EPIPF-AD-07-01 Section 9 to evacuate:

e (B) 0-2 mile radius, AND Note To determine sectors in (D) include the downwind sector(s)from Form EPIPF-AD-07-01 Part#7 and one sector on either side.

  • (D) 2-5 miles for sectors
c. Ensure on-site members of the general public (visitors, fishermen, tourists, farmers, etc.) are directed to leave the site in accordance with EPIP-SEC-02, "Security Force Response to Emergencies."
d. Ensure control measures for site access/egress are established in accordance with EPIP-SEC-02.

5.1.2 Site Emergency

a. Verify on-site members of the general public are directed to leave the site in accordance with EPIP-SEC-02.
b. Verify control measures for site access/egress are established in accordance with EPIP-SEC-02.
c. Immediate Planned Protective Action Recommendations from Form EPIPF-AD-07-01 Section 9 for the general public are:

K  !, * (A) None REFERENCE USE

-4 WISCONSIN PUBLIC SERVICE CORP. No. EPIP-AD-19 Rev. R Title Protective Action Guidelines Kewaunee Nuclear Power Plant Emergency PlanImplementing Procedure Date NOV 7 2002 Page 3 of 7 5.1.3 Alert

a. Verify on-site members of the general public are directed to leave the site in accordance with EPIP-SEC-02 as a precautionary measure.
b. Verify control measures for site access/egress are established in accordance with EPIP-SEC-02.
c. Immediate Planned Protective Action Recommendations from Form EPIPF-AD-07-01 Section 9 for the general public are:
  • (A) None 5.1.4 Unusual Event
a. Immediate Planned Protective Action Recommendations from Form EPIPF-AD-07-01 Section 9 for the general public are:

e (A) None 5.2 PARs developed from Dose Projections and/or field survey and sample results.

5.2.1 Obtain the most recent RASCAL dose projections for TEDE and thyroid doses.

5.2.2 Obtain field survey and sample results.

5.2.3 Compare the available information obtained from the most recent RASCAL dose projections and field data with Table 1 to determine possible changes to off-site PARs.

a. IF projected or direct field result doses meet the criteria in the first column of the table, THEN relay the identified "recommended action" to the ERM (ED) immediately.

5.2.4 Evaluate the impact time, plant conditions (past, present, projected), weather conditions and forecast, and evacuation time estimates using Table 2, "Evacuation Time Estimates (KNPP/EPZ)."

5.2.5 Determine the most effective appropriate protective actions the public can take based on both radiological and plant conditions.

Note The following step will normally be performed only if the State EOC in Madison has been activated.

5.2.6 If appropriate, instruct the State Radiological Coordinator Liaison (SRCL) to discuss potential changes in PARs with the State Radiological Coordinator (SRC) for the State of Wisconsin.

5.2.7 IF new PARs are advisable, THEN complete Form EPIPF-AD-07-01.

REFERENCE USE

A/

WISCONSIN PUBLIC SERVICE CORP. No. EPIP-AD-19 Rev. R

-. . . Title Protective Action Guidelines Kewaunee Nuclear Power Plant

- Emergency Plan Implementing Procedurte Date NOV 7 2002 Page 4 of 7 5.2.8 Forward Form EPIPF-AD-07-01 to the appropriate Communicator for transmission to government officials.

5.2.9 IF projections indicate a potential dose to the thyroid of > 25 rem for Emergency workers, THEN verify "Potassium Iodide Distribution," EPID-AD-18, is being implemented.

5.2.10 IF projections or field readings indicate doses > 1 rem TEDE or > 5 rem thyroid to any population outside of the EPZ, THEN report this immediately to the state and counties and if requested, provide assistance with ad hoc planning.

5.2.11 Repeat Step 5.2 until the Final Conditions are met, see Section 6.0.

6.0 Final Conditions 6.1 Additional Protective Action Recommendations are no longer required when the plant emergency has been Terminated or Recovery Actions have begun and the responsible Director has suspended the use of EPIPs.

7.0 References 7.1 EPA-400-R-92-001, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents (October 1991) 7.2 NUREG/CR-2925, In-Plant Considerations for Optimal Off-site Response to Reactor Accidents (November 1982) 7.3 U.S. Food and Drug Administration, 21CFR Part 1090 7.4 EPIP-AD-02, Emergency Class Determination 7.5 EPIP-SEC-02, Security Force Response to Emergencies 7.6 NUREG-0654, lI.J.7 and H.J.8 7.7 Kewaunee Nuclear Power Plant Emergency Plan, Appendix A 7.8 EPIP-AD-18, Potassium Iodide Distribution REFERENCE USE

-WISCONSIN PUBLIC SERVICE CORP. No. EPIP-AD-19 No. EPJP-AD-1 9 IRev.

I Rv R

Title Protective Action Guidelines

. ewane.. Nuclear Pwer Plant 2Emneriency Plan ImpleentihtM9 Proced4uqre Date NOV 7 2002 I Page 5 of 7 Emerzencv Pla I

L-8.0 Records 8.1 The following QA records and non-QA records are identified in this directive/procedure and are listed on the KNPP Records Retention Schedule. These records shall be maintained according to the KNPP Records Management Program.

8.1.1 QA Records e Event Notice, Form EPIPF-AD-07-01 8.1.2 Non-QA Records None REFERENCE USE

.1 PROJECTED DOSE (REM) TO RECOMMENDED ACTIONS(") COMMENTS THE POPULATION TEDE < 1 rem No planned protective actions.(b) If the conditions of Section 6.0 are satisfied, previously Thyroid < 5 Rem Monitor environmental radiation recommended protective actions levels. may be reconsidered.

TEDE > 1 rem Recommend evacuation in Seeking shelter would be an affected sectors. Monitor alternative if evacuation were Thyroid > 5 rem environmental radiation levels not immediately possible.

and adjust sectors recommended for evacuation based on these levels. Control access.

PROJECTED DOSE (REM) TO RECOMMENDED ACTIONS(c) COMMENTS EMERGENCY TEAM WORKERS TEDE < 5 rem Control exposure of emergency "All other Organs" include: skin workers to these levels except extremities and thyroid.

All other Organs < 50 rem TODE for those instances listed below.

(Appropriate controls for Stable iodine may be made emergency workers include time available for use where predicted limitations, respirators, and doses exceed 25 rem to the stable iodine.) thyroid. Although respirators and stable iodine should be used Emergency workers exposure where effective to control dose TEDE < 10 rem should be controlled below these to emergency team workers, levels when their mission to dose m workers All other Organs < 100 rem TODE involves protecting valuable thyroid dose may not be a limiting factor for lifesaving property. missions.

TEDE < 25 rem Emergency workers exposure should be controlled below these For Environmental/Monitoring All other Organs < 250 rem TODE levels when their mission Teams, refer to RASCAL involves lifesaving or protection "Maximum Doses at Selected of large populations. Distances" output screen. Check bone, lung, and thyroid doses.

( These actions are recommended for planning purposes. Protective action decisions at the time of the incident must take existing conditions into consideration. These conditions include containment activity, probability of containment failure, plume transport time, release duration, and any other pertinent conditions.

(b) At the time of the incident, officials may implement low-impact protective actions in keeping with the principle of maintaining radiation exposures as low as reasonably achievable.

(C) These actions are recommended for planning purposes. Protective action decisions at the time of the incident must take existing conditions into consideration. These conditions include containment activity, probability of containment failure, plume transport time, release duration, and any other pertinent conditions.

rJ~oU Table 1 EPIP-AD-19 Rev. R Date: NOV 7 2002 r,.age 6 of 7 REFERENCE USE

EVACUATION TIME ESTIMATES (KNPP/EPZ) 3 11 5Sec~tors*

(Pop.) z Vehicles 2 All 64 Hwy. 42 (203) (4.75) 5N Co. Tk. B (700) (3)

Hwy. 42 (7.75)

Co. Tk. AB (3)

Hwy. 42 (4)

Co. Tk. B (4.5)

Hwy. 42 (7)

Co. Tk. B (4.5)

Co. Tk. AB (2.5)

Co. Tk. Q (4)

Co. Tk. AB (8.5)

Co. Tk. Q (4)

Co. Tk.Q (4)

Co. Tk. AB (5.25)

Hwy. 42 (5.25) iage (OT I Table 2 EPIP-AD-19 Rev. R Date: NOV 7 2002 Page 7 OT I REFERENCE USE

_WISCONSIN PUBLIC SERVICE CORP.-,,, No. EPIP-EOF-11 Rev. V

- . . Title Internal Communication and Kewaunee Nuclear Power Plant Documentation Flow Emergency Plan Implementing Procedure Date NOV 7 2002 T Page 1 of 3 Reviewed By William Bartelme Approved By W. L. Yarosz Nuclear PORC I- Yes SRO Approval Of -...- -Yes Safety C3 Yes Review s Temporary 0 No Required 0 No Changes Required Related 1.0 Purpose 1.1 This procedure provides instruction for the flow of information and documentation through the EOF and how it will be maintained.

2.0 General Notes 2.1 Generally each EOF position should maintain the logs, records, and documents generated by them at their station until the ALD arranges for long-term storage.

3.0 Precautions and Limitations 3.1 All logs, records, and documents generated over the course of the emergency shall be kept until after emergency reviews or investigations of the emergency are complete.

"- 4.0 Initial Conditions 4.1 This procedure will be implemented when an emergency has been declared at the Kewaunee Nuclear Power Plant and it is directed by the Administrative Logistics Director.

5.0 Procedure 5.1 Maintaining Status Boards and Event Sheets - EOF Support Personnel 5.1.1 Update the EOF status boards approximately every 15 minutes or as directed by the ALD.

Note IF the PPCS computer terminal is not operational,THEN use the Formsfound in Appendix B of the EPIPsand complete them by obtainingthe information from the EOF Communicator in the TSC. The Forms are:

"* Form EPIPF-EOF-11-02,"OperatingStatus"

"* Form EPIPF-EOF-11-03,"EnvironmentalStatus Board" J:\appdata\procpws\draft\epip\eeofl 1.doc-Christine Simmons/Christine Simmons-Bruce Heitzkey REFERENCE USE

WISCONSIN PUBLIC SERVICE CORP. -,-, No. EPIP-EOF-11 Rev. V

- ,..-, !Title Internal Communication and

. , Kewaun ee Nuclear Power Plant Documentation Flow Emergency Plan Implementing Procedure Date NOV 7 2002 Page 2 of 3 5.1.2 Print the PPCS computer terminal screens that match the EOF status boards from the PPCS computer terminal under the following "Graphic Display" screen addresses:

  • #53 - Operating Status
  • #54 - Environmental Status 5.1.3 Transcribe the data obtained from the screens to the appropriate EOF status boards.

5.1.4 Place the printouts in the EOF Support Personnel's OUT box for filing.

5.1.5 Transcribe information that is marked "POST" by the Engineering/Licensing Support Coordinator to the appropriate status board or Flip Chart sheet.

5.1.6 Provide recommendations to the Engineering/Licensing Support Coordinator to post any other significant plant or ERO activities/events.

5.1.7 Number each Flip Chart sheet.

5.2 Distributing New Messages - EOF Support Personnel 5.2.1 Distribute To Addressee:

a. IF action is required, THEN hand it directly to the addressee who needs to take the action.
b. IF the information is for informational purposes, THEN place it in the addressee's IN box.

5.2.2 Pick up all messages from all OUT boxes:

a. Messages from EOF staff members should be placed in the ERM's IN box.
b. Messages from the ERM's OUT box that are marked "POST" should be placed in the IN box of the Support Person maintaining the status boards (Step 5.1).
c. Other messages from the ERM's OUT box should be placed in the IN box of the Support Person generating the Master Log.
d. Messages that have been posted should be placed in the IN box of the Support Person generating the Master Log (Step 5.3).

REFERENCE USE

L No. EPJP-EOF- 11 IRev. V WISCONSIN PUBLIC SERVICE CORP. I .. . . . -.

Title Internal Communication and Documentation Flow

_-.Kewaunee Nuclear Power Plantcedue "

Emergency'Plan- mlmnn Procedure Date NOV 7 2002 I Page 3 of 3 5.3 Master Log - EOF Support Personnel 5.3.1 Collect all "News Statements" and make a copy for each clip board.

5.3.2 Create an electronic master log.

5.3.3 Enter all messages in the "Master Log" chronologically.

5.3.4 After a full log page is generated or every 30 minutes,

a. Make 4 copies of the last log page and latest news statements,
b. Two-hole punch them at the top, AND
c. Deliver to the IN boxes of the: ERM, SRCL, NRC, State.

5.3.5 Place the originals of all messages in a master file.

6.0 Final Conditions 6.1 Plant Emergency has been Terminated or Recovery actions have begun and the Emergency Response Manager has suspended the use of EPIPs.

7.0 References 7.1 None 8.0 Records 8.1 The following QA records and non-QA records are identified in this directive/procedure and are listed on the KNPP Records Retention Schedule. These records shall be maintained according to the KNPP Records Management Program.

8.1.1 OA Records

"* Operating Status, Form EPIPF-EOF-11-02

"* Environmental Status Board, Form EPIPF-EOF-11-03

"* Flip Chart sheets

"* Personal and Master Logs 8.1.2 Non-QA Records None REFERENCE USE

__,WISCONSIN PUBLIC SERVICE CORP. No. EPIP-RET-02A _TRev. U Title Radiation Protection Office/Radiological "Kewaunee Nuclear Power Plant Analysis Facility (RPO/RAF) Activation "EmergencyPlanmplementingProcedure NOV 72002 Page 1 of 5 Reviewed By Tom Schmidli e Approved By W. L. Yarosz Nula PORC [] Yes SRO Approval Of El Yes Nufety [Ye Review Temporary El No Required El No Changes Required 0 No Related 1.0 Purpose 1.1 This procedure provides instruction for activation of the RPO/RAF.

2.0 General Notes 2.1 The RPO and RAF are activated in parallel with functions performed from both facilities as environmental and radiological conditions permit.

3.0 Precautions and Limitations 3.1 If the RPO becomes uninhabitable or high background radiation levels make instrumentation unusable, then relocate to the RAF.

3.2 If the RAF and Technical Support Center (TSC) must be evacuated or relocated, then use the "guidancein Section 5.3 to assist in maintaining the functionality of the RAF.

4.0 Initial Conditions 4.1 An Alert or higher emergency has been declared at the Kewaunee Nuclear Power Plant (KNPP).

5.0 Procedure Note Unless otherwise stated,the following tasks may be performed in any order or concurrently.

5.1 RPO/RAF Activation 5.1.1 IF the emergency occurs on a back shift, THEN the Radiation Technologist(s) on shift shall report to the RPO and control radiological responses until relieved by the incoming In-Plant Radiation Emergency Team (IRET) members and the Radiation Protection Director (RPD).

5.1.2 The on shift Radiation Technologist shall assume the responsibilities of the RPD until relieved.

j:\appdata\procpws\draft\epip\eret02a.doc-Christine Simmons/Christine Simmons-Bill Lehmbeck INFORMATION USE

1

-WISCONSIN PUBLIC SERVICE CORP. No. EPIP-RET-02A Rev. U

- ..... ,Title Radiation Protection Office/Radiological "KewauneeNuclear. Power Plant Analysis Facility (RPO/RAF) Activation Emergency Plan Implenienting Procedure- Date NOV 7 2002 Page 2 of 5 Note Site Boundary Facility (SBF) activation is requiredupon declarationof an ALERT.

5.1.3 Dispatch an IRET member to the SBF to assume the duties of the SBF Coordinator.

5.1.4 Activate the RPO as follows:

5.1.4.1 Assign a Radiation Protection Leadman and a support staff (technologists/clerks) to the RPO.

5.1.4.2 Direct the Radiation Protection Leadman to process non-essential personnel out of the Auxiliary Building/Containment and maintain personnel accountability.

5.1.4.3 Establish Auxiliary Building/Containment accountability as follows:

5.1.4.3.1 Determine who is in the Radiologically Controlled Area (RCA) by checking PMETS System or (if used) the RCA sign-in sheets.

5.1.4.3.2 Notify the RPD immediately of any missing persons.

5.1.4.3.3 IF personnel are believed missing, THEN implement EPIP-OSF-04, "Search and Rescue."

5.1.4.4 Set up instrumentation for continuous monitoring of radiation levels in the RPO.

Note Periodicallyperform habitabilitysurveys of requiredareas based upon radiologicalconditions and/or as directed by the RPD.

5.1.4.5 Perform general area surveys in the following areas:

" RPO

"* Monitor room

"* Change room

"* Machine Shop

"* Electric Shop

"* Hallway west of Electric Shop/Fire Team Assembly Area 5.1.4.6 WHEN airborne grab samples are taken, THEN record the information on Form EPIPF-RET-02A-02, "Emergency Sample Worksheet."

INFORMATION USE

'I.WISCONSIN PUBLIC SERVICE CORP., No. EPII-RET-02A Rev. U Title Radiation Protection Office/Radiological "KewauneeNuclear Power Plant Analysis Facility (RPO/RAF) Activation

'EmergencyPlan Implementing Proceýdure Date NOV 7 2002 Page 3 of 5 Note IF radiologicalconditions require the relocationof the RPO to the RAF, THEN ensure that all personnel(i.e., Fire Teams) in areas of elevated dose rates are relocatedas necessary.

5.2 RAF Activation 5.2.1 Verify operability of the following RAF equipment:

a. SPING channel readings (additional resource is the Honeywell graphic output 12 for SPING data, 13 for non-SPING data.)
b. Fixed radiation monitoring equipment
c. "RADAC" RMS Control Console
d. Walkie-talkie and base station radio
e. Count Room equipment 5.2.2 WHEN the above checks are complete, THEN notify the following that the RAF is activated:

"* RAF staff

" TSC

"* EPD (if available) 5.2.3 IF directed by the RPD, THEN relocate from the RPO to the RAF.

5.2.4 Maintain personnel accountability per EPIP-SEC-03, "Personnel Assembly and Accountability," during the move from the RPO to the RAF.

5.2.5 Direct personnel who are NOT members of the Emergency Response Organization (ERO) to another assembly point.

5.2.6 Direct evacuating RPO (Radiation Protection and Chemistry) personnel to move the following items to the RAF:

a. Calculators
b. Walkie-talkies
c. Portable radiation survey meters
d. Most recent CREWDOSE report
e. Master keys and key ring
f. Auxiliary Building sign-in sheets (if being used)

INFORMATION USE

",_WISCONSIN PUBLIC SERVICE CORP. No. EPIP-RET-02A Rev. U

. -, Title Radiation Protection Office/Radiological Kewaunee Nuclear Power Plant


Analysis Facility (RPO/RAF) Activation SPlan Implementing Procedur - Date NOV 72002 Page 4 of 5

g. RPO logbook
h. Personnel TLD badges and control badges
i. First aid responder kit
j. Electronic dosimeters 5.2.7 Make the following announcement over the plant paging system:

"ATTENTION, ATTENTION: THE RPO HAS BEEN RELOCATED; THE RPO HAS BEEN RELOCATED, ALL CONTROLLED AREA ENTRIES ARE TO BE MADE THROUGH THE RAF."

5.2.8 Post signs in the RPO directing personnel to the RAF for entry to the controlled area.

5.2.9 Periodically (at least every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />) perform radiation surveys in the RAF and TSC to ensure habitability.

5.2.10 IF an Alert or higher is declared based on radiological conditions, OR if directed by the RPD, THEN issue dosimetry to all personnel remaining on-site.

5.2.11 Using the Gai-tronics, direct personnel to monitor their individual dose.

5.2.11.1 IF the Self Reading Dosimeter (SRD) meets any of the following limits, THEN report to the RPO/RAF/SBF to have the SRD re-zeroed:

a. Reads 150 mR or more
b. Is found to be off-scale
c. The end of the work shift 5.3 IF it becomes necessary to evacuate or relocate the RAF, THEN the RPD should consider the following guidance in order to maintain the functionality of the RAF.

5.3.1 The RPD should coordinate with the Emergency Director (ED), Support Activities Director (SAD), and the OSF Coordinator to perform the evacuation or relocation and maintain as much as possible of the functionality of the affected facilities.

5.3.2 The RPD should consider the following in making the evacuation/relocation:

9 Communications with the ED, SAD, and OSF Coordinator

  • Radiation and contamination monitoring capabilities 0 Transport of necessary equipment and supplies to the alternate location INFORMATION USE

- r p

-WISCONSIN PUBLIC SERVICE CORP. No. EPJP-RET-02A Rev. U EPPRE-2 Kewaunee Nuclear Power Plant Title Radiation Protection Office/Radiological Analysis Facility (RPO/RAF) Activation Emergency Plan Imp-lementing Procedure Date NOV 7 2002 I Page 5 of 5

"* Continuation of coverage and documentation of exposure to emergency teams

"* Evacuation or relocation of excess or unnecessary personnel

"* Collection, documentation, and transport for analysis of sample and survey results 6.0 Final Conditions 6.1 Plant Emergency has been Terminated or Recovery actions have begun and the Emergency Response Manager has suspended the use of EPIPs.

7.0 References 7.1 EPIP-SEC-03, Personnel Assembly and Accountability 7.2 EPIP-OSF-04, Search and Rescue 7.3 COMTRAK 89-305, Item 2 "n-- 7.4 COMTRAK 89-305, Item 3 8.0 Records 8.1 The following QA records and non-QA records are identified in this directive/procedure and are listed on the KNPP Records Retention Schedule. These records shall be maintained according to the KNPP Records Management Program.

8.1.1 OA Records

  • Emergency Sample Worksheet, Form EPIPF-RET-02A-02 8.1.2 Non-OA Records None INFORMATION USE

OPERATING STATUS Event Class Time Declared Date J

RX TRIP TIME RCS/CORE PRIMARY C(DOLING EMERGENCY SYSTEMS TIME TIME TIME TEMP "A"__:" B" S/G "A" "HPSI OF LVL  % FLOW gpm HLG OF PRESS Psig psig CLG AFW LPSI (RHR) psig FLOW 9gpn gpm FLOW gpm PRESS RWST LVL  %

PZR LVI OF STM RELIEF COND/ATM CONTAINMENT MAX TI(

PRESS psig "A79

, CONT. RAD RCP -1YE*s EYEs r/hr STATUS ElNO ENO TEMP OF MONITOR (R40)

"&At' "B"

[3 NO ft WTR LVL ft RHR RECIRC --YEs SPRAY El YES El NO COOL 3

S DNO El-]NO EST. FUEL DAMAGE _% DOWN rlYEs

_ _ _ _ _I_ - I PERSONNEL INFORMATION Have plant personnel been accounted for? [: YES F-1 NO How many plant personnel remain on-site?

Any injuries? n" YES nl NO Extent of injuries?

Fire Location Extent of damage Cause Who fought fire? [-] Plant Fire Team r] Local Fire Dept SLEVEL OF EMERGENCY [E] Unusual Event E"' Alert El Site Emergency [El General Emergency uaie; I VV Form EPIPF-EOF-11-02 Hey. U EPIPF-EOF-11-1J2 Rev. Gi Date: I'Jv NOlV i 2_U2_- nA 9% -1 M -1

( ( C ENVIRONMENTAL STATUS BOARD WEATHER: TIME:

Stability Class W-A B [:] C [W] D W-] E WIF [] G 10M 60 M Delta T _ OF Sigma Theta _ deg.

Wind Direction From deg. Lake Breeze: n YES W NO Path: W'-North W- South Wind Speed mph Forecast:

Temperature N/A OF RELEASE: TIME:

Radiological Release in Progress: W-1YES W] NO Start Time:

Release Path: W] Aux Vent W-" Cont. Vent W- Stm Rif A W Stm Rif B W] Other Estimated Duration: Hours Release Rate CI/SEC Iodine Fraction:

PROJECTED DOSE:

Miles 2 5 10 TEDE Limiting Organ Dose Page 1 of 1 EPIPF-EOF-11-03 Rev. G Form EPIPF-EOF-11-03 NOV 7 Date: NOV Date: 7 2002 2002 Page 1 of 1

Wednesday, October 23, 2002 The following memos represent procedures that were issued by the date on the memos, but a signed receipt was not received back for tracking. Some of these have been open for quite some time. We need the procedures listed to be verified that they were filed at the time of the distribution, and then sign the memo and send it back to us so we can record it. We need to maintain accurate records on tracking procedures for audit purposes. Thank you VERY much!!!

Thank you in advance for your help.

Laura Ihlenfeldt

i "KEWAUNEENUCLEAR POWER PLANT January 8, 2002 "EMERGENCY PLAN IMPLEMENTING PROCEDURES TRANSMITTAL FORM RETURN TO DIANE FENCL - KNPP OUTSIDE AGENCY COPIES (1-20)

-NRýocuentontroDesk (1) Krista Ka* pelman -PBNP - EP (10)*

T. Webb - NRC Region M (2 & 3)* iCraig Weiss - Wisconsin Power & Light (11)*

T. Webb - NRC Resident Inspector (4) (receives Appx. A phone numbers)*

T. Webb - State of Wisconsin (5)* Jim Holthaus - Nuclear Management Company (12)*

T. Webb - KNPP QA Vault w/NRC Letter (15)*

PERSONAL COPIES (21-40-) These copies are for the personal use of the listed individuals for reference or emergency response.

J. Bennett (33) D. Mielke (35) H. Kocourek (13) T. Coutu (28)

D. Masarik (32) D. Seebart (24) B. Bartelme (34)

REFERENCE COPIES - CUSTODIAN (41-100) These copies are for general reference by anyone. They are distributed throughout the plant and corporate'offices. The named individual is the responsible custodian for the procedures and shall insure they are properly maintained.

STF (86, 87, 88) LOREB - STF (62, 66, 67, 68, 70, 72, 73, 74)

L. Welch - Fuel Services (65) "STFLibrary (43)

NO Library - KNPP (59) Resource Center - Training (82, 89, 94, 131)

C. Sternitzky - ATF-2 (44) D. Schrank - Maintenance Off. (41)

D. Braun -ATF-3 (45) - D. Krall - CR1SS Office (51, 56)

P. Ehlen - I&C Office (42) P&FS Adm - GB-D2 (Nuclear Library) (84)

M. Daron - Security Building (46) H. Kocourek - TSC (50)

P&FS Adm - GB D2-3 (EOF) (81) W. Galarneau - RAF (53)

H. Kocourek - OSF (52) W. Galarneau - SBF/EMT (54)

C. Hutter - ATF-1 (64) W. Galarneau - RPO (55)

WORKING COPIES (101-199) These copies of procedures are kept in the areas designated for use in response to an emergency. These are not complete sets, but contain only those procedures that are used to implement activities in the location where they are kept. Please dispose of any sections distributed that are not tabbed in the indicated copy.

W. Galarneau - RAF/RPO (106, 107) D. Krall - CR/Communicator (116 )(Partial Distribution)

W. Galarneau - SBF/ENV (108, 109) Simulator/Communicator (117)

W. Galarneau - SBF/EM Team (110, 111, l1lA) M. Fencl - Security (121)

W. Galarneau - Aurora Medical Center (118, 119) N. Deda - Security Building (120)

W. Flint - Cold Chem/HR Sample Room (113) S. VanderBloomen (125)

N. Deda - SBF/SEC (114) J. Stoeger (126)

Originals to KNPP QA Vault Please follow the directions when updating your EPIP Manual. WATCH FOR DELETIONS!!! These are controlled procedures and random checks may be made to ensure the manuals are kept up-to-date.

  • THIS IS NOT A CONTROLLED COPY. ITISA COPYFOR INFORMATION ONLY.

1

KEWAUNEE NUCLEAR POWER PLANT REVISION OF EMERGENCY PLAN IMPLEMENTING PROCEDURES January 8, 2002 Please follow the directions listed below. If you have any questions regarding changes made to the EPIPs, please contact Dave Seebart at ext. 8719. If you are a controlled copy holder (see cover page), return this page to Diane Fencl by February 8, 2002, SIGNED AND DATED to serve as a record of revision.

EPIP Index, dated 01-08-2002.

REMOVE INSERT PROCEDURE REV. PROCEDURE REV.

EPIP-AD-O1 I EPIP-AD-O1 J EPIP-APPX-A-02 BM EPIP-APPX-A-02 BN Form EPIPF-TSC-03-04 H Form EPIPF-TSC-03-04 I

- m -

I CERTIFY Copy No. (WPSC No.) of the Kewaunee Nuclear Power Plant's EPIPs has been updated.

SIGNATURE DATE Please return this sheet to DIANE FENCL.

Diane Fencl Enclosure YJ I I

2 r

DOCUMENT TRANSMITTAL "KENWAUNEENUCLEAR POWER PLANT FROM: DIANE FENCL - KNPP TRANSMITTAL DATE 01-15-2002 EMERGENCY PLAN rMLEMENTING PROCEDURES TRANSMITTAL FORM OUTSIDE AGENCY COPIES (1-20)

C&Web 6 c

=nDenento iiN(i) Krista Kappelman - PBNP - EP (10)*

T. Webb - NR-C -Regio-n]1(2&-3)* Craig Weiss - Wisconsin Power & Light (11)*

T. Webb - NRC Resident Inspector (4) (receives Appx. A phone numbers)*

T. Webb - State of Wisconsin (5)* - Jim Holthaus - Nuclear Management Company (12)*

T. Webb - KNPP QA Vault w/NRC Letter (15)*

for reference or PERSONAL COPIES (21-40) 7 hese copies are for the personal use of the listed individuals emergency response.

D. Mielke (35) H. Kocourek (13) T. Coutu (28)

J. Bennett (33)

D. Masarik (32) D. Seebart (24) B. Bartelme (34) by anyone. They are

  • REFERENCE COPIES - CUSTODIAN (41-100) These copies are for general reference custodian for

-distributed throughout the plant and corporate offices. The named individual is the responsible the procedures and shall insure they are properly maintained.

STF (86, 87, 88) -LOREB - STF (62, 66, 67, 68, 70,72, 73, 74)

L. Welch - Fuel Services (65) STF Library (43)

NO Library - KNPP (59) - Resource Center - Training (82, 89, 94, 131)

"- C. Sternitzky - ATF-2 (44) D. Schrank - Maintenance Off. (41)

D. Braun - ATF-3 (45) D. Krall - CR/SS Office (51, 56)

P. Ehlen - I&C Office (42) P&FS Adm - GB-D2 (Nuclear Library) (84)

M. Daron - Security Building (46) H. Kocourek - TSC (50)

P&FS Adm - GB D2-3 (EOF) (81) W. Galarneau - RAF (53)

H:Kocourek - OSF (52) W. Galarneau - SBF/EMT (54)

C. Hutter - ATF-1 (64) W. Galarneau - RPO (55)

WORKING COPIES (101-199) These copies of procedures are kept in the areas designated for use in response to an emergency. These are not complete sets, but contain only those procedures that are used to are implement activities in the location where they are kept. Please dispose of any sections distributed that not tabbed in the indicated copy.

W. Galarneau - RAF1RPO (106, 107) D. Krall - CR/Communicator (116)(Parth Distribution)

W. Galarneau - SBF/ENV (108, 109) Simulator/Communicator (117)

W. Galarneau - SBF/EM Team (110, 111, l1lA) Fe cl - Security (121)

W. Galarneau - Aurora Medical Center (118, 119)&x &a w Security Building (120)

W. Flint - Cold Chem/HR Sample Room (113) S. VanderBloomen (125)

St De-SBF/SEC (114) J. Stoeger (126)

Originals to IKNPP QA Vault are Please follow the directions when updating your EPIP Manual. WATCH FOR DELETIONS!!! These controlled procedures and random checks may be made to ensure the manuals are kept up-to-date.

-"[*THIS IS NOT A CONTROLLED COPY. IT IS A COPY FOR INFORMATION ONLY.

  • 1

KEWAUNEE NUCLEAR POWER PLANT REVISION OF EMERGENCY PLAN IMPLEMENTING PROCEDURES January 15, 2002 Please follow the directions listed below. If you have any questions regarding changes made to the EPIPs, please contact Dave Seebart at ext. 8719. If you are a controlled copy holder (see cover page), return this page to Diane Fend by February 15, 2002, SIGNED AND DATED to serve as a record of revision.

EPIP Index, dated 01-15-2002.

REMOVE- . INSERT -,'

PROCED)URE - REV. - PROCEDURE' REV.

EP-RET-3C 0 EPIP-RET-03C P EP-RET-3D M EPIP-RET-03D N i-rn

,Re 0

I CERTIFY Copy No.___ (WPSC No.) of the Kewaunee Nuclear Power Plant's EPIPs has been updated.

SIGNATURE DATE Please return this sheet to DIANE FENCL.

Diane endcl Enclosure I.

1 F

2

DOCUMENT TRANSMITTAL KEWAUNEE NUCLEAR POWER PLANT FROM: DIANE FENCL --KNPP TRANSMITTAL DATE 02-06-2002 EMERGENCY PLAN IMPLEMENTING PROCEDURES TRANSMITTAL FORM OUTSIDE AGENCY COPIES (1-20)

-_ __ n___ iri*

  • Krista Kappelman - PBNP- EP (10)*

T:.Webb - NRC Region 11I (2 & 3)* Craig Weiss - Wisconsin Power & Light (11)*

"- T. Webb -'NRC Resident Inspector (4) (receives Appx. A phone numbers)*

T. Webb - State of Wisconsin (5)* Jim Holthaus - Nuclear Management Company (12)*

T. Webb - KNPP QA Vault w/NRC Letter (15)*

PERSONAL COPIES (21-40) These copies are for the personal use of thelisted individuas forreference or emergency response.

J. Bennett (33) D. Mielke (35) outu (28)

D. Masarik (32) D. Seebart (24) B. Bartelme (34)

REFERENCE COPIES - CUSTODIAN (41-100) These copies are for general reference by anyone. They are distributed throughout the plant and corporate offices. The named individual is the responsible custodian for the procedures and shall insure they are properly maintained.

STF (86, 87, 88) LO.REB-'Si (62, 66, 67, 68, 70, 72, 73, 74)

L. Welch- Fuel Services (65) STF Library (43)

NO Library - KENPP (59), Resource Center - Training (82, 89, 94, 131)

C.-Sternitzky - ATF-2 (44)" D. Schrank - Maintenance Off. (41)

D. Braun - ATF-3 (45) D. Krall - CRISS Office (51,56)

P. Ehlen - I&C Office (42) -'P&FS Adm - GB-D2 (Nuclear Librai'iy) (84)

M. Daron - Security Building (46) H. Kdoourek - TSC (50)

P&FS Adm - GB D2-3 (EOF) (81) W. Galarneau- RAF (53)

H. Kocourek - OSF (52) W... Galarneau - SBF/EMT (54)

C. Hutter - ATF-1 (64) WNV. Galarneau - RPO (55)

WORKING COPIES (101-199) These copies of pro~edures are kept in the areas designated for use in- -

response to an emergency. These are not complete sets, but contain only those procedures that are used to implement activities in the location where they are kept. Please dispose of any sections distributed that are not tabbed in the indicated copy-,.

W. Galarneau - RAF/RPO (106, 107) D. Krall - CR/Communicator (II6)(Qartial Distribution)

WN.Galarneau- SBF/ENV (108, 109) Simulator/Communicator (117)

W. Galarneau - SBF/EM Team (110, 111, 111A) M. Fencl - Securitf(121)

W. Galarneau - Aurora Medical Center (118, 119) M. Kuether - Security Building (120)

W. Flint-- Cold Chem/HR Sample Room (113) S. VanderBloomen (125)

M. Kuether-SBF/SEC(114) . J. Stoeger (126)

Originals to KNPP QA Vault Please follow the directions when updating your EPIP Manual. WATCH FOR DELETIONS!!! These are controlled procedures and random checks may be made to ensure the manuals are kept up-to-date.

  • THIS IS NOT A CONTROLLED COPY. ITISA COPYFOR INFORMATION ONLY.-

I

KEWAUNEE NUCLEAR POWNER PLANT REVISION OF EMERGENCY PLAN IMPLEMENTING PROCEDURES February 6, 2002 Please follow the directions listed below. If you have any questions regarding changes made to the EPIPs, please contact Dave Seebart at ext. 8719. If you are a controlled copy holder (see cover page), return this page to Diane Fencl by March 6, 2002, SIGNED AND DATED to serve as a record of revision.

EPIP Index, dated 02-06-2002. ,

REMOVE INSERT PROCEDURE REV. PROCEDURE REV.

EPIP-AD-03 AD EPIP-AD-03 AE EPIP-AD-04 ' AF EPIP-AD-04 AG EPIP-AD-07 AN EPIP-AD-07 . AO EPIP-AD-20 , 'A EPIP-AD-20 , B EPIP-EOF-03 AB EPIP-EOF-03 AC EPIP-EOF-04 AH EPIP-EOF-04 AI EPIP-EOF-08 . T EPIP-EOF-08 U EPIP-OSF-02 T. EPIP-OSF-02 U

'EPIP-SEC-02 W EPIP-SEC-02 X EPIP-TSC-01 P EPIP-TSC-01 Q EPIP-TSC-02 S ' EPIP-TSC-02 T EPIP-APPX-A-02 Delete EPIP-APPX-A-03, Delete EPIP FORM TSC 1.1 A' Form EPIPF-TSC-01.01 B EPIP FORM TSC 1.2 A Form EPIPF-TSC-01.02 B EPIP FORM TSC 1.3 . iA . - Form EPIPF-TSC-01.03 B Returi'aigd and dated coyv, of ftsh smita lefitsetteithnin a,-er..:

- - - '. ., " . .. . . .. d" . ..- . ... ... ,Q 'y".'

iý,aeany questions or cmet, plea-se6

-'" " "-'- I CERTIFY Copy No.______ (WPSC No.) of the

"* Kewaunee Nuclear Power Plant's EPIPs has been updated.

SIGNATURE DATE

" Please retur. this sheet to DIANE FENCL.

Diane Feno Enclosure 2

S.

DOCUMENT TRANSMITTAL INWAJUNEE NUCLEAR POWER PLANT FROM: DIANE FENCL ' KNPP , TRANSMITTAL DATE 02-27-2002 EMERGENCY PLA.N IMPLEMENTING PROCEDURES TRANSMiTTAL FORM

_UTSIDFAGEN-Y COPIES (1-20)

MOW- ista Kappemn - PBNP - EP (10)*

T1. W'ebb - NRC Region Im (2 & 3)* Craig Weiss - Wisconsin Power & Light (11)*

T. Webb - NRC Resident Inspector (4) (receives Appx. A phone numbers)* .

State of Wisconsin (5)* Jim Holthaus - Nuclear Managenment Company (12)*

T. Webb -

T. Webb - KNPP QA Vault w/NRC Letter (15)*

individuals for reference or PERSONAL COPIES (21-40) These copies are for the personal use of the listed emergency response.

J. Bennett (33) SD. Mielke-(35) . .. -13) T. Coutu (28)

D. Seebart (24) B. Bartelme (34)

D. Masarik (32) by anyone. They are REFERENCE COPIES;- CUSTODIAN (41-100) These copies are for general reference the responsible custodian for distributed throughout the plant and corporaite offices. The named individual is the procedures and shall insure they are properly maintained.

S*LOREBE-STF (62, 66, 67, 68,70, 72, 73, 7)

STF (86, 87, 88)

STF Library (43) -

L. Welch - Fuel Services (65)

Resource Center - Training (82, 89, 94,131)

NO Library - K'NPP (59)

--D.Schrank - Maintenance Off. (41)

C. Sternitzky - ATF-2 (44) fkk."' Krall - CRISS Office (51, 56)

D. Braun -ATF-3 (45) . - - Nuclear Library) (84)

.7 --........

P. Ehlen - I&C Office (42) (50)

H. kocourek - TSC

. . . Daron - Security Building (46)

-eA

- Q9Q'-3,-(EOF) (81) W. Galarneau - RAF (53)

S"-

W. Galarneau - SBF/EMT (54)

H. Kocourek - OSF (52)

W. Galarneau - RPO (55)

C.'Hutter - ATF-1 (64) use in WORKING COPIES (101-199) These copis of procedures are kept in the areas designated for not complete sets, but contain only those procedures that are used to responseto an emergency. Theselare that are implement activities in the location where they are kept. Please dispose of any"sections distributed not tabbed in the indicated copy. .....

W. Galarneau - RAF/RPO (106, 107) D. Kral--CR/Communicator (116)(Pad"Disirnbuon)

Simulator/Communicator (117)

W. Galarneau - SBF/ENV (108, 109)

M. Fencl - Security (121)

W. Galarneau - SBF/EM Team (110, 111, liA)

Galarneau - Aurora Medical Center (119, 119) M. Kuether - Security Building (120)

W.

S. VanderBloomen (125)

W. Flint - Cold ChemfHR Sample Room (113)

J. Stoeger (126)

M. Kuether - SBFISEC (114)

Originals to IN'PP QA Vault Please follow the directions when updating your EPIP Manual. WATCH FOR DELETIONS!!! These are controlled procedures and random checks may be made to ensure the manuals are kept up-to-date.

  • THIS IS NOT A CONTROLLED COPY. ITIS A COPI FOR INFORMATION ONLY.

I

I.

KEWAUNEE NUCLEAR POWER PLANT REVISION OF EMERGENCY PLAN IMPLEMENTING PROCEDURES February 27, 2002 Please follow the directions listed below. If you have any questions regarding changes made to the EPIPs, please contact Dave Seebart at ext. 8719. If you are a controlled copy holder (see cover page), return this page to Diane Fencl by March 27, 2002, SIGNED AND DATED to serve as a record of revision.

EPIP Index, dated 02-27-2002.

REMOVE INSERT PROCEDURE REV. PROCEDURE REV.

EPIP-AD-04 AG EPIP-AD-04 AH EPIP-AD-07 AO EPIP-AD-07 AP EPIP-AD-I8 0 EPIP-AD-18 P EPIP-EOF-08 U EPIP-EOF-08 V EPIP-TSC-10 I EPIP-TSC-10 J Form EPIPF-AD-18-01 A Form EPIPF-AD-18-02 A Return` aisag.a d and datet hio , talletter, within 10 days of receipt, oth se'nderh.I Ifyou have l-* -any

.-. *.questions or comment,

  • - .*- .--.- e4 .. * .* .: plea- ."" Seebart.

all. Dave - " - . .

I CERTIFY Copy No.___ (WPSC No.) of the Kewaunee Nuclear Power Plant's EPIPs has been updated.

SIGNATURE DATE Please return this sheet to DIANE FENCL.

Diane Fencl Enclosure KJ 2

DOCUMENT TRANSMITTAL KEWAUNEE NUCLEAR POWER PLANT TRANSMITTAL DATE 04-11-2002 FROM: DIANE FENCL - KNPP FORM EMERGENCY PLAN IMPLEMENTING PROCEDURES TRANSMITTAL OUTSIDE AGENCY COPIES (1-20)

Wj.ebb -NRCDocument Control Desk (1) Krista Kappelman - PBNP - EP (10)*

T. Webb - NRC Region 11I (2 & 3)* Craig Weiss - Wisconsin Power &.Light (11)*

T. Webb - NRC Resident Inspector (4) (receives Appx. A phone numbers)*

T. Webb - State of Wisconsin (5)* - - Jim Hoithaus - Nuclear Management Company (12)*

T. Webb -. KNPP QA Vault wINRC Letter (15)* - "

individuals for reference or PERSONAL COPIES (21-40) These copies are for the personal use of the listed emergency response..

D. Mielke (35) J. Ferris (13) S..... T. Coutu (28) .

J. Bennett (33) B. Bartelme (34)

D. Masarik (32) D. Seebart (24) by anyone. They are REFERENCE COPIES - CUSTODIAN (41-100) These copies are for gerieral ireference is the responsible custodian for distributed throughout the plant and corporate offices. The named individual the procedures and shall insure'they are properlymaintained.

LOREB - STF (62, 66, 67, 68,70, 72, 73, 74)

STF (86, 87, 88)

STF Library (43)

L. Welch - Fuel Services (65)

Resource Center - Training (82, 89, 94, 131)

NO Library - KNPP (59)

D. Schrank - Maintenance Off. (41)

C. Sternitzky - ATF-2 (44) D. Krall - CR/SS Office (51, 56)

D. Braun - ATF-3 (45)

M. Lambert (Nuclear Library) (84)

P. Ehlen - I&C Office (42) H. Kocourek - TSC (50)

M. Daron - Security Building (46) W. Galarneau - RAF (53)

M. Lambert (EOF) (81) W. Galarneau - SBFIEMT (54)

H. Kocourek - OSF (52) W. Galarneau - RPO (55)

C. Hutter - ATF-1 (64) for use in WORKING COPIES (101-199) These copies of procedures are kept in the areas designated procedures that are used to response to an emergency. These are not complete sets, but contain only those dispose of any sections distributed that are implement activities in the location where they are kept. Please not tabbed in the indicated copy.

D. Krall - CR/Communicator (116)(Pardal Distribudon)

W. Galarneau - RAF/RPO (106, 107) Simulator/Communicator (117)

W. Galarneau - SBF/ENV (108, 109) M. Fencl - Security (121)

W. Galarneau - SBF/EM Team (110, 111, 1IlA) M. Kuether - Security Building (120)

W. Galarneau - Aurora Medical Center (118, 119) S. VanderBloomen (125)

W. Flint - Cold Chem/HR Sample Room (113) J. Stoeger (126)

M. Kuether - SBFISEC (114)

Originals to INPP QA Vault These are Please follow the directions when updating your EPIP Manual. WATCH FOR DELETIONS!!!

are kept up-to-date.

controlled procedures and random checks may be made to ensure the manuals ONLY.

  • THIS IS NOT A CONTROLLED COPY. ITISA COPY FOR INFORMATION 1

KEWAUNEE NUCLEAR POWER PLANT REVISION OF EMERGENCY PLAN IMFLEMIENThNG PROCEDURES April 11, 2002 Please follow the directions listed below. If you have any questions regarding changes made to the EPIPs, please contact Dave Seebart at ext. 8719. If you are a controlled copy holder (see cover page), return this page to Diane Fencl by May 13, 2002, SIGNED AND DATED to serve as a record of revision.

EPIP Index, dated 04-11-2002.

REMOVE INSERT PROCEDURE REV. PROCEDURE REV.

EPIP-AD-I I Q EPIP-AD-11 R EP-RET-2B Q EPIP-RET-02B R EPIP FORM AD 11.1 F Form EPIPF-AD-1 1-01 G Return a signed and dated copy of this transmittal letter, within 10 days of receipt, to the sender.

If you have any questions or comments, please call Dave Seebart.

I CERTIFY Copy No.,_ (WPSC No.) of the Kewaunee Nuclear Power Plant's EPIPs has been updated.

SIGNATURE DATE Please return this sheet to DIANE FENCL.

Diae Fenc1 Enclosure 2

DOCUMENT TRANSMITTAL KEWAUNEE NUCLEAR POWER PLANT FROM: DIANE FENCL - KNPP TRANSMITTAL DATE 04-25-2002 EMERGENCY PLAN IMPLEMENTING PROCEDURES TRANSMITTAL FORM OUTSIDE AGENCY COPIES (1-20)

,e Con*tolDek(1)

  • Krista Kappelman - PBNP - EP (10)*

T. Webb - NRC Regionm-Hi(2)e 3')-- Craig Weiss - Wisconsin Power & Light (11)*

T. Webb - NRC Resident Inspector (4) (receives Appx. A phone numbers)*

T. Webb - State of Wisconsin (5)* 4,.y. Jim Holthaus - Nuclear Management Company (12)*

T. Webb - KNPP QA Vault (NRC LetterdOnly) (15)*

PERSONAL COPIES (21-40) These copies are for the personal use-of the listed indi-iduals for reference or emergency response.

J. Bennett (33) D. Seebart (24) J. Ferris (13) ca&ý car)

REFERENCE COPIES - CUSTODIAN (41-100) These copies are for general reference by anyone. They are.

distributed throughout the plant and corporate offices. The named individual is the responsible custodian for the procedures and shall insure they are properly maintained.

NO Library - IG'PP (59) Resource Center - Training (82)

C. Sternitzky - ATF-2 (44) D. Krall - CR/SS Office (51, 56)

M. Daron - Security Building (46) J. Ferris - TSC (50)

M. Lambert - EOF (81) W. Galarneau - RAF (53)

'-'i M. Lambert - OSF (52) W. Galarneau - SBF/EMvIT (54)

W. Galarneau - RPO (55)

LOREB - STF (62, 66, 67, 68, 70, 72, 73, 74)

STF Library (43)

.1-r/F"(P4 ,7 W)

WORKING COPIES (101-199) These copies of procedures are kept in the areas designated for use in response to an em ergency. .. . . . . . .. r . uu, Lu, ,.. .'-.*: rn --- . n *

.. r- ,,;oa

... t i:.....~LU.. s:e B an!-

0 di spo.n.. ..

_* "-LL* * "

W. Galarneau - RAF/RPO (106, 107) M. Kuether - SBF/SEC (114)

W. Galarneau - SBF/ENV (108, 109) D. Krall - CR/Communicator (116)(Partial Distribution)

W. Galarneau - SBF/EM Team (110, 111, 1llA) Simulator/Communicator (117)

W. Galarneau - Aurora Medical Center (118, 119) M. Fencl - Security (121)

W. Flint - Cold Chem/HR Sample Room (113) M. Kuether - Security Building (120)

Originals to ]KNPP QA Vault Please follow the directions when updating your EPIP Manual. WATCH FOR DELETIONS!!! These are controlled procedures and random checks may be made to ensure the manuals are kept up-to-date.

  • THIS IS NOT A CONTROLLED COPY. ITISA COPYFOR INFORMATION ONLY.

I

KEWAUNEE NUCLEAR POWER PLANT REVISION OF EMERGENCY PLAN IMPLEMENTING PROCEDURES April 25, 2002 -.

Please follow the directions listed below. If you have any questions regarding changes made to the EPIPs, please contact Dave Seebart at ext. 8719.....

EPIP Index, dated 04-25-2002.

REMOVE INSERT PROCEDURE REV. PROCEDURE REV.

EPIP-SEC-03 AC EPIP-SEC-03 AD

~ II I CERTIFY Copy No.__ (WPSC No.) of the Kewaunee Nuclear Power Plant's EPIPs has been updated.

SIGNATURE DATE Please return this sheet to DLINE FENCL.

DianýFenc Enclosure 1

2

DOCUMENT TRANSMITTAL KEWArUNEE NUCLEAR POWER PLANT FROM: DIANE FENCL - KNPP TRANSMITTAL DATE 06-20-2002 EMERGENCY PLAN IMPLEMENTING PROCEDURES TRANSMITTAL FORM OUTSIDE AGENCY COPIES (1-20)

-Webb- -NRC Document Control Desk (1)*

  • Krista Kappelman - PBNP - EP (10)*

Eneigy (11)*

ST. Webb NRCRegidn-f (2,3)* Craig Weiss - Alliant T. Webb - NRC Resident Inspector (4) (receives Appx. A phone numbers)*

T. Webb - State of Wisconsin (5)* Jill Stern - Nuclear Management Company (12)*

T. Webb - KNPP QA Vault (NRC Letter & Memo Only) (15)*

PERSONAL COPIES (21-40) These copies are for the personal use of the listed individuals for reference or em ergency response. . ....

J. Bennett (33) D.Seelbart (24) S.. J. Ferris (13) T. Coutu (28)

REFERENCE COPIES - CUSTODIAN (41-100) These copies are for general reference by anyone. They are distributed throughout the plant and corporate offices. The named individual is the responsible custodian for the procedures and shall insure they are properly maintained.

NO Library - KNPP (59)- Resource Center - Training (82)

C. Sternitzky - ATF-2 (44) D. Krall - CR/SS Office (51,56)

M. Daron - Security Building (46) M. Lambert - TSC (50)

M. Lambert - EOF (81) W. Galarneau RAF (53)

M. Lambert - OSF (52) W. Galarneau - SBF/EMT (54)

LOREB - STF (62, 66, 67, 68, 70, 72, 73, 74) W. Galarneau - RPO (55)

STF Library (43) STF (86, 87, 88)

WORKING COPIES (101-199) These copies of procedures are kept in the areas designated for use in response to an emergency.

W. Galarneau - RAF/RPO (106, 107) "D.Krall - CR/Communicator (116)(Partial DitriWbution)

W. Galarneau - SBF/ENV (108, 109) Simulator/Communicator (117)

W. Galarneau - SBF/EM Team(110, 111, 111A) 'M. Fencl - Security (121) '

W. Flint - Cold Chem/HR Sample Room (113) M. Kuether - Security Building (120)

M. Kuether - SBF/SEC (114) J. Stoeger (126)

Originals to KNPP QA Vault Please follow the directions when updating your EPIP Manual. WATCH FOR DELETIONS!!! These are controlled procedures and random checks may be made to ensure the manuals are kept up-to-date.

  • THIS IS NOT A CONTROLLED COPY. IrTIS A COPYFOR INFORMATION ONLY.

t.2 1

KEWAUNEE NUCLEAR POWER PLANT REVISION OF EMERGENCY PLAN IMPLEMENTING PROCEDURES June 20, 2002 Please follow the directions listed below. If you have any questions regarding changes made to the EPIPs, please contact Dave Seebart at ext. 8719.

EPIP Index, dated 06-20-2002.

REMOVE INSERT PROCEDURE REV. PROCEDURE REV.

EPIP-AD-03 AE EPIP-AD-03 AF EPIP-AD-04 AI EPIP-AD-04 AJ EPIP-AD-07 AQ EPIP-AD-07 AR EPIP-EOF-08 W EPIP-EOF-08 X EPIP-EOF-12 P EPIP-EOF-12 Q EPIP-RET-04 R EPIP-RET-04 S EPIP-SEC-05 F EPIP-SEC-05 G EPIP-TSC-07 I EPIP-TSC-07 J EPIP-TSC-08B F EPIP-TSC-08B G Figure EPIPFG-EOF-12-02 B Figure EPIPFG-EOF-12-02 C Figure EPIPFG-SEC-05-01 B Figure EPIPFG-SEC-05-01 C EPIP FORM SEC 4.1 F Form EPIPF-SEC-04-01 G Form EPIPF-TSC-07-01 F Form EPIPF-TSC-07-01 G iRe a eantea*9conxt~at ease c.wt aavs o[e t8a7d9to*

I CERTIFY Copy No. (WPSC No.) of the Kewaunee Nuclear Power Plant's EPIPs has been updated.

SIGNATURE DATE Please return this sheet to DIANE FENCL.

Diane Fend Enclosure

- I 2

DOCUMENT TRANSMITTAL KEWAUNEE NUCLEAR POWER PLANT FROM: DIANE FENCLP-KNPP TRANSMITTAL DATE 07-19-2002 EMERGENCY PLAN IMPLEMENTING PROCEDURES TRANSMITTAL FORM OUTSIDE AGENCY COPIES (1-20)

Webb- . Document c' Krista Kapplnfian -PBNP - EP (10)*

T. Webb -NRC-Rigion Ml-(2,3)* Craig Weiss-- Alliant Energy-(l1)*'

T. Webb - NRC Resident Inspector (4) (receives Appx. A phone numbers)*

T. Webb - State of Wisconsin (5)* ... Jill Ster'n - Nuclear Management Company (12)*

T. Webb -KNPP QA Vault (NRC Letter & Memo Only) (15)* -

PERSONAL COPIES (21-40) These copies are for the personal use of the listed individuals for reference or emergency response.

D. Seebar (24) J. Ferris (13) T. Coutu (28)

J.RBennett (33)

REFERENCE COPIES - CUSTODIAN (41-100) These copies are for general reference by anyone. They are distributed throughout the plant and corporate offices. The named individual is the responsible custodian for the procedures and shall insure they are properly maintained.

NO Library - KNPP (59) Resource Center - Training (82)

C. Sternitzky - ATF-2 (44) D. Krall - CR/SS Office (51, 56)

M. Daron - Security Building (46) M. Lambert -TSC (50)

M. Lambert - EOF (81) W. Galarneau - RAF (53)

M. Lambert - OSF (52) --W. Galarneau - SBF/EMT (54)

LOREB - STF (62, 66, 67, 68, 70, 72, 73, 74) W. Galarneau - RPO (55)

STF Library (43) STF (86, 87, 88)

WORKING COPIES (101-199) These copies of procedures are kept in the areas designated for use in response to an emergency.

W. Galarneau - RAF/RPO (106, 107)' D. Krall - CR/Communicator (116)(eartial Distribution)

W. Galarneau - SBF/ENV (108, 109) Simulator/Communicator (117)

W. Galarneau - SBF/EM Team (110,-111, 111A) M. Fend - Security (121)

W. Flint - Cold Chem/tHR Sample Room (113) M. Kuether - Security Building (120)

M. Kuether - SBF/SEC (114) J. Stoeger (126)

Origin'als to KN`PP QA Vault Please follow the directions when updating your EPIP Manual. WATCH FOR DELETIONS!!! These are controlled procedures and random checks may be made to ensure the manuals are kept up-to-date.

  • THlIS IS NOT A CONTROLLED COPY. IT IS A COPY FORINFORMATION ONLY.
t. -

1 -

KEWAUNEE NUCLEAR POWER PLANT REVISION OF EMERGENCY PLAN IMPLEýENTING PROCEDURES July 19, 2002 Please follow the directions listed below. If you have any questions regarding changes made to the EPIPs, please contact Dave Seebart at ext. 8719.

EPIP Index, dated 07-19-2002.

REMOVE INSERT PROCEDURE REV. PROCEDURE REV.

EPIP-AD-02 AC EPIP-AD-02 AD EPIP-SEC-03 AD EPIP-SEC-03 AE

_ýmfie'O-te fb I CERTIFY Copy No. (WPSC No.) of the Kewaunee Nuclear Power Plant's EPIPs has been updated.

SIGNATURE DATE Please return this sheet to DIANE FENCL.

Diane Fend Enclosure 2

I DOCUMENT TRANSMITTAL KEWAUNEE NUCLEAR POWER PLANT- -

FROM: DIANE FENCL iKNPP TRANSMITTAL DATE 08-06-2002 EMERGENCY PLAN IMPLEMENTING PROCEDURES TRANSMITTAL FORM OUTSIDE AGENCY COPIES (1-20)

F-7ebb - NRC Document Control Desk (1)*j Krista Kappelman - PBNP - EP (10)*

"T.-Webbý--NRC Reionlf I (2, 2 3 - Craig Weiss - Alliant Energy (11)*

T. Webb - NRC Resident Inspdctor (4) (receives Appx. A phone numbers)*

-T. Webb-- State- of Wisconsin (5)* -Jill Stern - Nuclear Management Company (12)*

T. Webb - KNPP QA Vault (NRC Letter &-Memo Only) (15)*

PERSONAL COPIES (21l40) These copies are for the personal use of the listed individuals for 'eference or emergency response.

J. Bennett (33) D. Seebart (24) -. J. Ferris (13) T. Coutu (28)

REFERENCE COPIES --CUSTODIAN (41-100) These Eopies are for general reference by anyone. They are distributed throughout the plant and corporate offices. The-named individual is the responsible custodian for the procedures and shall insure they are properly maintained.

- NO Library - KNPP (59) -Resource Center - Training (82)

C. Sternitzky - ATF-2 (44) D. Krall - CR/SS Office (51, 56)

M. Daron - Security Building (46) M. Lambert - TSC (50) ..... .

M. Lambert - EOFR(81) W. Galarneau - RAF (53)

"M.Lambert - OSF (52) "W.Galarneau - SBF/EMT (54)

LOREB - STF (62, 66, 67, 68, 70, 72, 73, 74) W. Galarneau - RPO (55)

STF Librair" (43) STF (86, 87, 88) ...

WORKING COPIES (101-199) These'copies of procedures are kept in the areas designated for use in response to an emergency.

W. Galarneau - RAFIRPO (106,107) D. Krall - CR/Communicator (116)(PartiaI Distribution)

W. Galarneau - SBF/ENW (108, 109) Simulator/Communicator (117)

W. Galarneau - SBF/EM Team (110, 111, 111A) M. Fencl - Security (121)

W. Flint -Cold ChemIHR Sample Room (11-3) SM.*Kuether - Security Building (120)

M. Kuether- SBF/SEC (114) -I rk .(126)

Originals to IKNPP QA Vault Please follow the directions when updating your EPIP Manual. WATCH FOR DELETIONS!!! These are controlled procedures and random checks may be made to ensure the manuals are kept up-to-date.

  • THIS IS NOT A CONTROLLED COPY. IT ISA COPYFOR INFORMATION ONLY.

1

KEWAUNEE NUCLEAR POWER PLANT REVISION OF EMERGENCY PLAN IMPLEMENTING PROCEDURES August 06, 2002 Please follow the directions listed below. If you have any questions regarding changes made to the EPIPs, please contact Dave Seebart at ext. 8719.

EPIP Index, dated 08-06-2002.

REMOVE INSERT PROCEDURE REV. PROCEDURE REV.

EPIP-EOF-02 Z EPIP-EOF-02 AA EPIP-EOF-04 Al EPIP-EOF-04 AJ Clears TCI dated 05/28/2002.

EPIP-RET-02B R EPIP-RET-02B S EPIP-TSC-01 Q EPIP-TSC-01 R Form EPIPF-AD- 18-01 A Form EPIPF-AD-18-01 B Form EPIPF-EOF-02-01 S Form EPIPF-EOF-02-01 T Form EPIPF-EOF-02-02 L Form EPIPF-EOF-02-02 M EPIP FORM RET 2B. 1 C Form EPIPF-RET-02B-01 D EPIP FORM RET 2B.2 C Form EPIPF-RET-02B-02 D EPIP FORM RET 2B.3 C Form EPIPF-RET-02B-03 D EPIP FORM RET 2B.4 B Form EPIPF-RET-02B-04 C EPIP FORM RET 2B.5 C Form EPIPF-RET-02B-05 D EPIP FORM RET 2B.6 A Form EPIPF-RET-02B-06 B 4I Retum a signed and dated copy of this transiihittal iette4rwtiiin i.0 days of transriital date, to:-,;,'

the sender. Ifyou have any, que1ons or eomniits,,!jlease 66ntact Dave Seeb art'at ektC 8,719, I CERTIFY Copy No. (WPSC No.) of the Kewaunee Nuclear Power Plant's EPIPs has been updated.

SIGNATURE DATE Please return this sheet to DIANE FENCL.

Diane Fend Enclosure 2

DOCUMENT TRANSMITTAL KEWAUNEE NUCLEAR POWER PLANT FROM: DIANE FENCL - KNPP TRANSMITTAL DATE 08-20-2002 TRANSMITTAL FORM EMERGENCY PLAN IMPLEMENTING PROCEDURES OUTSIDE AGENCY COPIES (1-20) c Krista Kappelman - PBNP - EP (10)*

W--e

--T. Web**NRC Region10Iý(2,-3)* -_ Craig Weiss - Alliant Energy (11)*

numbers)*

T. Webb - NRC Resident Inspector (4) (receivies Appx. A phone Jill Stern - Nuclear Management Company (12)*

T. Webb- State of Wisconsin (5)*

T. Webb *KNiT QA Vault (NRC L]tter & Memo Only) (15)*

use of the listed individuals for reference or PERSONAL COPIES (21-40) These copies are for the personal emergency response.

D. Seebart (24) J. Ferris (13) "-"T. Coutu (28)

- J. Bennett (33) copies are for general reference by anyone. They.are REFERENCE COPIES - CUSTODIAN (41-100) These The named individual is the responsible custodian for distributed throughout the plant and corporate offices.

the procedures and shall insure they are properly maintained.

Resource Center - Training (82)

NO Library - KNPP (59) D. Krall - CR/SS Office (51, 56)

C. Sternitzky - ATF-2 (44) C..G cM,kM f - TSC (50)

M. Daron - Security Building (46) W. Galarneau - RAF (53)

C.. !wt - EOF (81) WGalarneau - SBF/EMT (54)

"W.

,(.4 -_OSF (52) 74) W. Galarneau -wRPO (55)

LOREB - STF (62, 66, 67, 68, 70, 72, 73, -* *STF (86, 87, 88)

STF Library (43) kept in the areas designated for use in WORKING COPIES (101-199) These copies of procedures are response to an emergency.

D. Krall - CR/Communicator (116)(artr*a Distrution)

W. Galarneau - RAF/RPO (106, 107) Simulator/Communicator (117)

W. Galarneau - SBF/ENV (108, 109) M. Fencld Security (121)

W. Galarneau - SBFIEM Team (110, 111, ll1A) M. Kuether - Security Building (120)

W. Flint - Cold Chem/HR Sample Room (113) Ops Admin. (126) - .

M. Kuether - SBF/SEC (114)

'03 r'4 ~

,Originals to KNPP QA Vault .

DELETIONS!!! These are Please follow the directions when updating your EPIP Manual. WATCH FOR the manuals are kept up-to-date.

controlled procedures and random checks may be made to ensure INFORMATION ONLY.

  • THIS IS NOT A CONTROLLED COPY. ITIS A COPYFOR I

KEWAUNEE NUCLEAR POWER PLANT REVISION OF EMERGENCY PLAN IMPLEMENTING PROCEDURES August 20, 2002 Please follow the directions listed below. If you have any questions regarding changes made to the EPIPs, please contact Dave Seebart at ext. 8719.

EPIP Index, dated 08-20-2002.

REMOVE INSERT PROCEDURE REV. PROCEDURE REV.

EPIP-AD-04 AJ EPIP-AD-04 AK EPIP-ENV-01 V EPIP-ENV-01 W EPIP-ENV-03C V EPIP-ENV-03C W EPIP-ENV-04A S EPIP-ENV-04A T EPIP-ENV-04B W EPIP-ENV-04B X EPIP-ENV-04C W EPIP-ENV-04C X EPIP-ENV-04D N EPIP-ENV-04D 0 Form EPIPF-ENV-02-01 M Form EPIPF-ENV-02-01 N

  • _trap'.in.d and dat of this fonta-raftvEef*eh aopy at ex4ydiý S

I CERTIFY Copy No. (WPSC No.) of the Kewaunee Nuclear Power Plant's EPIPs has been updated.

SIGNATURE DATE Please return this sheet to DIANE FENCL.

Diane Fenci Enclosure 2

DOCUMENT TRANSMITTAL KEWAUNEE NUCLEAR POWER PLANT FROM: DIANE FENCL - KNPP TRANSMITTAL DATE 09-12-2002.

EMERGENCY PLAN IMPLEMENTING PROCEDURES TRANSMITTAL FORM OUTSIDE AGENCY COPIES (1-20)

L-'T.' C Documelt Control DeskQ()1 RC3e KristaKappelman - PBNP - EP (10)*

T. Webb - NRC Region EIl(2,3)* Craig Weiss - Alliant Energy (11)* .

T. Webb - NRC Resident Inspector (4) (receives Appx. A phone numbers)*

T. Webb - State of Wisconsin (5)* Jill Stern - Nuclear Management Company (i2)*

T. Webb - KNPP QA Vault (NRC Letter & Memo Only) (15)* ." ... .

PERSONAL COPIES (21-40) These copies are for the personal use of the listed individuals for reference or emergency response.

D. Seebart (24) J. Ferris (13) T. Coutu (28)

J. Bennett (33)

REFERENCE COPIES - CUSTODIAN (41-100) These copies are for general reference by anyone. They are distributed throughout the plant and corporate offices. The named individual is the responsible custodian for the procedures and shall insure they are properly maintained.

NO Library - N`PP (59) -Resource Centei - Training (82)

C. Sternitzky - ATF-2 (44) D. Krall - CRISS Office (51, 56)

M. Daron - Security Building (46) C. Grant - TSC (50)

- W. Galarneau - RAF. (53)

C. Grant - EOF (81)

C. Grant - OSF (52) W. Galar'neau - SBF/EMT (54)

LOREB - STF (62, 66, 67, 68, 70, 72, 73, 74) W. Gilarneau - RPO (55)

STF Library (43) SSTF (86, 87, 88)

WORK-ING COPIES (101-199) These copies of procedures are kept in the areas designated for usi in response to an emergency.

W. Galarneau - RAF/RPO (106, 107) Simulator/Communicator (117)

W. Galarneau - SBF/ENV (108, 109) M. Fencl - Security (121)

W. Galarneau - SBFIEM Team (110,111, l1lA) M. Kuether - Security Building (120)

W. Flint - Cold Chem/HR Sample Room (113) Ops Admin. (126)

M. Kuether - SBF/SEC (114) C. Grant - TSC Response Binder (Partial Distribution)

D. Krall - CR/Communicator (116)(Partial Distrnbtion) C. Grant - EOF Response Binder (Partial Distribution)

Originals to KNPP QA Vault Please follow the directions when updating your EPIP Manual. WATCH FOR DELETIONS!!! These are controlled procedures and random checks may be made to ensure the manuals are kept up-to-date. L L

  • THIS IS NOT A CONTROLLED COPY. ITISA COPYFOR INFORMATION ONLY.

- L 1

KEWAUNEE NUCLEAR POWER PLANT REVISION OF EMERGENCY PLAN IMPLEMENTING PROCEDURES September 12, 2002 Please follow the directions listed below. If you have any questions regarding changes made to the EPIPS, please contact Dave Seebart at ext. 8719.

EPIP Index, dated 09-12-2002.

r,* *r m*:*" S*-,*,'-"---',,,_*-,_-*

-INSERT" ---

RE OVEV.'__ ~~IL

- ', . J URF. -- t . ..f

  • .ý-:. REV. PROC DU- RE EPIP-AD-15 0 EPIP-AD-15 P hi thi ol an i i ~"'CA I CERTIFY Copy No._ _ (WPSC No.) of the Kewaunee Nuclear Power Plant's EPIPs has been updated.

SIGNATURE DATE Please return this sheet to DIANE FENCL.

Diane Fend Enclosure 2