October 2002 Monthly Operating Report for Perry Nuclear Power Plant
ML023240224
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/12/2002
From: Higaki V
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PY-CEI/NRR-2672L
Download: ML023240224 (3)


Text

FENOC Nuclear Power Plant FENOC10 Center Road PO Box 97 FirstEnergy Nuclear Operating Company Perry, Ohio 44081 November 12, 2002 PY-CEI/NRR-2672L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the October 2002 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector

OPERATING DATA REPORT UNIT:

Perry DATE:

11/7102 Docket: 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period: October 2002 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1260 1235 Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)

This Month 674 6 637.1 0.0; 745.370.0 Yr-to-Date 6,854.3 6,733.3 00 8.138889.0 Cumulative 103,439.5 1 00.806.3 0.0 114739291.0

1.
2.
3.
4.
5.
6.

7.

8.
9.
10.

11.

Page 1

/

J 100806....

I, 14 UNIT SHUTDOWNS REPORT MONTH - October 2002 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 11/07/02 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1

Hours 2

3 02-02 9/22/02 F

107.9 A

4 This Is a continuation of the forced outage in September

SUMMARY

The Perry Plant was off line until 10/5/02 at 1156 when the unit was synchronized to the grid. The unit remained on line through the remainder of the month.
1. TYPE:

F: Forced S: Scheduled

2. REASON:

A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

License Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

3. METHOD:

I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2