-v Date Entered: Oct 24, 2002 TO: USNRC/WASHINGTON JMCKNIGHT Copy Number: 145

=TRANSM:ITAL N=UMBER: 228908 PROCEDURE NUMBER: EI-7.0 TITLE: EMERGENCY POST ACCIDENT SAMPLING AND DETERMINATION OF FUEL FAILURE USING DOSE TRANSMITTAL: LISTED BELOW ARE NEW/REVISED PROCEDURES WHICH MUST BE IMMEDIATELY INSERTED INTO OR DISCARDED FROM YOUR PROCEDURE MANUAL.

Action Required Section or Description REMOVE AND DESTROY EI-7.0, R/7, ENTIRE PROCEDURE REPLACE WITH EI-7.0, R/8, ENTIRE PROCEDURE WORD 2000 CONVERSION SIGN, DATE, AND RETURN THE ACKNOWLEDGEMENT FORM WITHIN 10 DAYS TO THE PALISADES PLANT DOCUMENT CONTROL SIGNATURE OR INITIALS DATE

  • 4S7

Procedure No EI-7.0 Revision 8 Issued Date 10/24/02 PALISADES NUCLEAR PLANT EMERGENCY IMPLEMENTING PROCEDURE TITLE: EMERGENCY POST ACCIDENT SAMPLING AND DETERMINATION OF FUEL FAILURE USING DOSE RATES

/,0A107 Proý dure SpIsor Date

.TWMr.F1 rat!" 8/13/02 Technical Reviewer Date TEShpwmnp / 916/02 User Reviewer Date

PALISADES NUCLEAR PLANT Proc No El-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page I TITLE: EMERGENCY POST ACCIDENT SAMPLING AND DETERMINATION OF FUEL FAILURE USING DOSE RATES Table of Contents 1.0 PERSONNEL RESPONSIBILITY ................................................................................... 1 2.0 PURPOSE ...................................................................................................................... 1

3.0 REFERENCES

....................................................................................................... 1 3.1 SOURCE DOCUMENTS ................................................................................ 1 3.2 REFERENCE DOCUMENTS ...................................................................... 2 4.0 INITIAL CONDITIONS ANDIOR REQUIREMENTS .................................................. 2 4.1 PRELIMINARY INDICATORS ....................................................................... 3 4.2 PRELIMINARY DOSE RATE SURVEYS ................................................. 4 5.0 PROCEDURE ................................................................................................................. 5 5.1 PRIMARY COOLANT SYSTEM SAMPLE LINE RECIRCULATION FOR FAILED FUEL CLASSIFICATION ............................................................ 5 5.2 SUBSEQUENT POST ACCIDENT SAMPLING ....................................... 15

_ 6.0 ATTACHMENTS AND RECORDS .......................................................................... 21 6.1 ATTACHMENTS .................................................................................... 21 6.2 RECORDS ................................................................................................ 21 7.0 SPECIAL REVIEWS ................................................................................................ 22 ATTACHMENTS Attachment 1, "Jumpering CV-1910 and CV-1911 for PCS Sample or Sample Line Flush" Attachment 2, "NSSS Sample Panel Piping Dose Rates"

PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 1 of 22 TITLE: EMERGENCY POST ACCIDENT SAMPLING AND _

DETERMINATION OF FUEL FAILURE USING DOSE RATES USER ALERT REFERENCE USE PROCEDURE Refer to the procedure periodically to confirm that all proceddre segments of an activity will be or are being performed. Where required, sign appropriate sign-off blanks to certify that all segments are complete.

1.0 PERSONNEL RESPONSIBILITY The Operations Support Group Leader shall implement this procedure. The Technical Support Center (TSC) Chemistry Support Team and the Operations Support Center (OSC) Chemistry Supervisor-shall provide support. In the absence of the Operations Support Group Leader, the Site Emergency Director shall delegate this responsibility.

2.0 PURPOSE To determine iffuel failure is less than or greater than 5%'through the use of Primary Coolant System (PCS) sample line dose rate correlations.

To specify PCS sampling requirements if fuel failure is equal to or less than 5%

and a sample has been requested. If fuel failure is greater than 5%, PCS sampling will not be performed.

3.0 REFERENCES

3.1 SOURCE DOCUMENTS 3.1.1 Reg Guide 1:97 3.1.2 EA-JBB-01-04,:"Failed Fuel Rates on NSSS Piping" 3.1.3 Palisades Site Emergency Plan, Section 7, "Emergency Facilities and Equipment" 3.1.4 Combustion Engineering Report, "Technical Justification for the Elimination of the Post-Accident Sampling System from the Plant Design and Licensing Basis for CEOG Utilities," CE NPSD-1157, Revision 1

PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 2 of 22 TITLE:%EMERG*?*C\ POT ACCIDENT SAMPLING AND

,ETELARIVNATIO.', OF FUL FAILURE USING DOSE RATES 3.2 REFERENCE DOCUMENTS 3.2.1 Emergency Implementing Procedure El-I, "Emergency Classification and Actions" 3.2.2 Emergency Impfementing Procedure EI-7.10, "Post Accident Sampling, Radioactive Gaseous Effluent Monitoring" 3.2.3 Palisades Administrative Procedure 9.31, "Temporary Modification Control" 3.2.4 Emergency Implementing Procedure El-11, "Determination of Extent of Core Damage" 3.2.5 Palisades Administrative Procedure 1.15, "Performance of Job Briefings" 3.2.6 System Operating Procedure SOP-16, "Component Cooling Water System" 3.2.7 Palisades Administrative Procedure 10.41, "Procedure Initiation and Revision" 3.2.8 Emergency Implementing Procedure El 4.2, "Operational Support Center Activation" 3.2.9 Palisades Administrative Procedure 10.46, "Plant Records" 4.0 INITIAL CONDITIONS ANDIOR REQUIREMENTS This procedure shall be implemented as a result of Emergency Implementing Procedure El-I, "Emergency Classification and Actions."

The Site Emergency Director (SED) reviews the above procedure to categorize the emergency into one of the Site Emergency Plan Classifications and to determine the required actions.

At Primary Coolant System pressures of <150 psi, CV-1903, PCS hot leg sample valve, may not be capable of opening. This procedure should be performed at PCS pressures >150 psi. If PCS pressure is <150 psi, this procedure should not be performed.

PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 3 of 22 TITLE: EMERGENCY POST ACCIDENT SAMPLING'AND, DETERMINATION OF FUEL FAILURE USING' DOSE RATES 4.1 PRELIMINARY INDICATORS If any of the following Plant conditions are present,- it is possible that clad failure has occurred. The Palisades Plant Computer (PPC) can be used to find many of the following monitor readings. TSC Chemistry and Reactor Engineering can' review appropriate trends to determine if any of.these preliminary indicators of clad failure are present.

a. Off Gas Monitor (RIA-0631) high radiation indication or alarm.
b. Charging Pump Entrance Monitor (RIA-2301) high radiation indication or alarm.
c. Waste Gas Monitor (RIA-1 113) high radiation indication or alarm.
d. Containment High Range Monitors (RA-2321/-2322) high radiation alarm.
e. Containment Isolation Monitors (RIA-1 805, 1806, 1807, and 1808) high radiation indication.
f. Containment Radiation Monitor (RIA-2315) high radiation indication.
g. Containment Noble Gas Monitor (RIA-1817) high radiation alarm.
h. Containment Hydrogen Monitors indicate high concentration.
i. Core Exit Thermocouples indicate high temperature.
j. Primary Coolant System analysis indicates high activity.
k. Abnormally high radiation levels in vicinity of letdown line, NSSS panel, etc.

I.

1. - Containment Building Sump Level increasing level indication.

High radiation indications on radiation monitors should be discussed with Health Physics personnel. Emergency Implementing Procedure El-1 1, "Determination of Extent of Core Damage," may be useable in determining core damage using containment radiation monitor readings.

I PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 4 of 22 TITLE`- tMERGE1tOEiY POST ACCIDENT SAMPLING AND DETERMINATION1 OF FrUEL FAILURE USING DOSE RATES 4.2 PRELIMINARY DOSE RATE SURVEYS 4.2.1 OSC Chemistry Supervisor requests OSC Health Physics (HP) Supervisor for performance of dose rates and/or air sample surveys of the following areas:

a. NSSS Sample Panel Room
b. Hall to Chemistry Hot Lab
c. Chemistry Hot Lab
d. Count Room
e. Chemistry Grey Lab 4.2.2 OSC HP Supervisor shall ensure:
a. Stay times are computed for ALL individuals required to work in High Radiation areas as surveyed in previous step.
b. HP coverage at sample panel and in labs is commensurate with dose rates and may include:
1. Monitoring dose rates at and around sample panel during all sample acquisition activities.
2. Continuous air sampling at sample panel and in labs during sample analysis.
c. Dosimetry requirements and anti-contamination clothing requirements shall be dictated by the OSC Health Physics Supervisor.

Emergency Implementing Procedure EI-2.1, "Site Emergency Director," contains guidance on Dose Limits and provides for a dose limit of 5 Rem/hr. The Health Physics Supervisor will determine the dose rate and decide if sampling should be performed.

PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 5 of 22 TITLE: EMERGENCY POST ACCIDENT-SAMPLINGAND DETERMINATION OF FUEL FAILURE USING DOSE ,RATES 5.0 PROCEDURE  %'* ,= I USER ALERT REFERENCE USE PROCEDURE Refer to the procedure periodically to confirm

,that all procedure segments of an activity will be or are being performed. Where required, sign appropriate sign-off blanks to certify that, all segments are complete..

5.1 PRIMARY COOLANT SYSTEM SAMPLE LINE RECIRCULATION FOR FAILED FUEL CLASSIFICATION ,

5.1.1 OSC Chemistry Supervisor shall conduct a pie-job brief in accordance with Palisades Administrative Procedure 1.15, "Performance of Job Briefings" 6r Emergency Implementing Procedure El 4.2, "Operational Support Center Activation."

a. The OSC Chemistry Supervisor shall determine the PCS pressure from Operations.

ý I T PCS Pressure psig b The OSC Chemistry Supervisor telephone number

.1

PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 6 of 22 TITLE:', ,-,MEiGEUCY POSV ACCiDENT SAMPLING AND DETE*R*MWATION, OF Ft;-L FAILURE USING DOSE RATES CAUTION This flush will result in transferring sample watar from the reactor or containment sump to the VCT or Chemistry lab drain tank. This may result in increased dose rates in these areas.

5.1.2 1*

IF THEN 4.- ___________________

Containment Isolation Signal 1. OSC Chemistry Supervisor shall (CIS) is received

.. ,I-request I&C to jumper CV-1910 and CV-1911 per the directions found in Attachment 1.

2. OSC Chemistry Supervisor shall request Operations to reopen CCW Valve CV-944A so that cooling is supplied to the sample coolers per System Operating Procedure SOP-16," Component Cooling Water System."

3 OSC Chemistry Supervisor shall

a. Request Operations to open CV-1910 and CV-1911
b. Inform Operations that PCS sample flow will be routed to the Volume Control Tank
c. Inform Operations that manipulation of TIS-1901 may cause an alarm in the Control Room.

Containment Isolation Signal OSC Chemistry Supervisor shall (CIS) is not received

a. Request Operations to open CV-1910 and CV-1911
b. Inform Operations that PCS sample flow will be routed to the Volume Control Tank
c. Inform Operations that manipulation of TIS-1901 may cause an alarm in the Control Room.

PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 7 of 22 TITLE: EMERGENCY POST ACCIDENT SAMPLING AND - `

DETERMINATION OF FUEL FAILURE USINGWOSE RATES 5.1.3 Chemistry Technician shall check or place HS-1912 (Reactor Coolant or Low Pressure-Safety Injection (LPSI) selector switch) in the OFF position, to block flow to the EC-168 Control Panel. Switch is located at EC-168 Control Panel.

5.1.4 Chemistry Technician shall verify CV-1912"(Reactor Coolant Sample block valve)

CLOSED (green indicator light).Switch is located at EC-168 Control Panel.

5.1.5 Chemistry Technician shall place SS-0210 (selector switch for continuous sample) in the ON position. Switch is located at EC-168 Control Panel.

5.1.6 Chemistry Technician shall place SS-0211 (selector switch for continuous sample) in

--the ON position. Switch is located at EC-168 Contro! Pange!. .

NOTE: Manipulation of the followinrg alarm-function may cause an alarm at the panel and in the Control Room.

5.1.7 Chemistry Technician -shall verify that temperature indicating switch TIS-1901 is in


service. Ifthe Green LED is-ON (unit in Manual Mode),enable the alarm function by pushing A/M touch pad. This enters Auto Mode with Green LED off. The lower display will now show SP 0.0. Switch is located at EC-168 Control Panel.

5.1.8 IF -THEN HI-HI Sample Temp Alarm on Place HS-1919 to MANUAL.

C-168 panel exists.

HI-HI Sample -temp Alarm on Place HS-1919 in AUTO.

C-,168 panel does not exist. -

5.1.9 Chemistry Technician shall place HS-1916 (Reactor Coolant sample flush switch) in

'the SAMPLE position.'

5.1.10 Chemistry Technician shall verify SV-1917 CLOSED (green indicator light).'

5.1.11, Chemistry Technician shall verify SV-1916 OPEN (red indicator light).

5.1.12; ,Chemistry Technician' shall verify CLOSED MV-V37 (gas collection bomb vent) 5.1.13 _Chemistry Technician shall verify CLOSED MV-V17 (PCS sx to sink) 5.1.14 Chemistry Technician shall verify CLOSED MV-V41 (gas collection bomb inlet) 5.1.15 Chemistry Technician shall verify CLOSED MV-V42 (gas collection bomb outlet).

I PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 8 of 22 TITLE: F.ERGEC)Y POST ACCIDENT SAMPLING AND DETER-iINATIO] OF FUEL FAILURE USING DOSE RATES 5.1.16 Chemistry Technician shall verify OPEN ,MV-V38 (NSSS to gas collection bomb isolation) 5.1.17 Chemistry Technician shaD verify OPEN MV-V39 (gas collection bomb bypass).

5.1.18 Chemistry Technician shall verify OPEN MV-V40 (discharge to VCT).

5.1.19 IF THEN PCS pressure is < 2000 psig Fully Open MV-PC606 PCS pressure is > 2000 psig No action needed.

5.1.20 At the C-32 panel, IF THEN HS-1901 (NSSS panel C-32 No adjustment is necessary. Proceed sample selector switch) is in to next step.

Position 3.

HS-1 901 is not in Position 3. 1. Ensure air control switch CS-5057 in the OFF position.

2. Place the selector hand switch HS-1901 to Position 3.
3. Open the bottom of the C-32 panel and verify position of the solenoid valve as follows:
a. OPEN MV-PC163 (SV-1909 isolation) to open discharge from SV-1909.
b. CLOSE MV-PC161 (SV-1906 isolation) to close discharge
c. CLOSE MV-PC162 (SV-1908 isolation) to close discharge from SV-1908.

5.1.21 Chemistry Technician shall place air control switch CS-5057 in the ON position.

5.1.22 At the C-168 panel, Chemistry Technician shall verify OPEN CV-1910 (Red Indicator Light On).

PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 9 of 22 TITLE: EMERGENCY POST ACCIDENT SAMPLING AND.

DETERMINAT'ON OF FUEL FAILURE USING1`DOSE RATES" 5.1.23 At the C-168 panel, Chemistry Technician shall verify OPEN CV-1911 (Red Light On). -..

5.1.24 At the C-168 panel, Chemistry Technician shall verify OPEN CV-1903 (primary coolant loop 2 hot leg sample point) open.

5.1.25 All personnel move to a low dose area.

5.1.26 Allow system to purge for 3 minutes.

5.1.27 Radiation Protection Technician shall take a dose Wate at the sample panel door and the NSSS sample panel.

IF THEN Dose rate at the NSSS door or 1. SECURE sample flow by placing panel >5 Rem/hr. _ SV-1916 OFF.

2., SECURE sample flow by placing CS-5057 OFF.

.3. -Report dose reading to OSC Chemistry SupeMsor and'OSC HP Supervisor. Elevated dose rates will occur in the Auxiliary Building if sample flow dose rates exceed this value.

4. OSC Chemistry Supervisor shall request Operations to secure CV-1 910 and CV-1911.

" 5. Technicians shall report to OSC.

6. END Procedure Dose rate at the NSSS panel Proceed to next step.

< 5 Rem/hr when samp!e flow is initiated. __ --

I PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 10 of 22 TITLE: EMERGENCY :POST ACCIDENT SAMPLING AND DETERMINA11OH OF FUEL FAILURE USING DOSE RATES 5.1.28 IF THEN HI-HI Temperature Alarm is Place HS-1919 to AUTO.

Clear.

HI-HI Temperature Alarm is not 1. Verify or place MV-CC175 OPEN.

Clear.

2. Verify or place MV-CC176 OPEN.
3. Contact OSC Chemistry Supervisor if alarm still does not clear. He will need to contact Operations to determine cause.

5.1.29 All personnel move to a low dose area.

5.1.30 Allow sample flow and discharge to the VCT for a minimum of 20 minutes.

5.1.31 Radiation Protection Technician shall measure the dose rate on contact at the Failed Fuel Survey Point on the PCS sample line.

Dose rate mRlhr Dose Rate Date/Time 5.1.32 Chemistry Technician shall place CS-5057 (C-32 panel air control switch) in the OFF position.

5.1.33 At the C-168 panel, Chemistry Technician shall place HS-1916 (reactor coolant sample/flush switch) in the OFF position.

NOTE: The following steps will cause a "PASM Panel Trouble" alarm.

5.1.34 Chemistry Technician shall place SS-0210 (selector switch for continuous sample) in the OFF position.

5.1.35 Chemistry Technician place SS-0211 (selector switch for continuous sample) in the OFF position.

PALISADES NUCLEAR PLANT " Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 11 of 22

. TITLE: EMERGENCY POST ACCIDENT SAMPLING AND.,

DETERM!NATION OF FUEL FAILURE USINGdDOSE'RATES."__

5.1.36 To disable the alarm function for TIS-1 901, perform the following:

a. Ifthe Green'LED is not lit, push NM touch pad to enter the Manual Mode

,(Green LED on).

b. Push the down-arrow pad until output equals 0.0. The display will read OUT 0.0. The Red LED labeled ALl will remain "ON" if sample temperature is

> 90 0 F.

5.1.37 Chemistry Technician and Radiation Protection Technician shall move to a low dose area and report the dose rate reading to the OSC Chemistry Supervisor.

5.1.38 The OSC and/or TSC Chemistry Supervisor(s) shall use the "NSSS Sample Panel Piping Dose Rates" graph in Attachment 2 to determine fuel failure. Fuel Failure should be defined as <1%1 1-5%, or >5%.

Shutdown Date/Time Hours since shutdown Fuel Failure.  %

Determined By:

. Signature

PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGEWCY IMPLEMENTING PROCEDURE Revision 8 Page 12 of 22 TITLE:, EMERGEINIY P(M,* ACIDENT SAMPLIUG AND DETERMe'NT,.TO, C;*F F,1j"LL FAILURE USING DOSE RATES 5.1.39 IF THEN Fuel failure > 5% A PCS sample will not be obtained due to high dose rates.

TSC Chemistry Supervisor shall report results to the Operations Support Group Leader. Refer to El-i, "Emergency Classification and Actions," Section Fission Product Barriers/Fuel Damage. El-i, "Emergency Classification and Actions," does not discriminate between 1-5% and >5%.

OSC Chemistry Supervisor shall request Operations to CLOSE CV-1910 and CV-1911.

Chemistry Technician shall secure:

1. SV-1916
2. CS-5057 NOTE: Closing the following valves may cause an alarm.
3. SS-0210
4. SS-0211 Technicians shall report to the OSC.

END Procedure Fuel failure < 5% TSC Chemistry Supervisor shall report results to the Operations Support Group Leader. Refer to El-i, "Emergency Classification and Actions," Section Fission Product Barriers/Fuel Damage.

PALISADES NUCLEAR PLANT Proc No El-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 13 of 22 TITLE: EMERGENCY POST ACCIDENT-SAMPLING AND:.

DETERMINAtiON OF FUEL-FAILURE USING'DOSE RATES 5.1.40 IF THEN If PCS sample will not be required OSC Chemistry shall request Operationsto close CV-1910 and CV-1911..

Chemistry Technician shall secure:

1. SV-1916
2. CS-5057 NOTE: Closing the following

,valves may cause an alarm.

3. SS-0210
4. SS-0211

.Technicians shall report to the OSC.

If PCS sample is required OSC Supervisor determines which analyses need to be performed.

Chemistry Technician determines sample volume based upon ,

S-required analyses .

5.1.41 Chemistry Technician shall OPEN Valve MV-V17 (PCS sx to sink).

5.1.42 Chemistry Technician shall CLOSE Valve MV-V40 (Discharge to VCT).

5.1.43 All personnel move to a low dosearea.

5.1.44 Flush sample'line for 5 minutes-.

5.1.45 Chemistry Technician shall obtain appropriate volume of PCS sample.

5.1.46 Chemistry Technician shall OPEN valve MV-V40 (discharge to VCT).

5.1.47 Chemistry Technician shall CLOSE Valve MV-V17 (PCS sx to sink).

5.1.48 Chemistry Technician shall place the C-32 panel air control switch CS-5057 in the OFF position.

I PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 14 of 22 TITLE: EMERGENCY POST ACCIDENT SAMPLING AND DETERaMINAT:CN OF FUEL FAILURE USING DOSE RATES 5.1.49 At the C-168 panel, Chemistry Technician shall place HS-1916 (reactor coolant samp!e/flush switch) in the OFF position.

NOTE: The following steps may cause an alarm at the panel and in the Control Room.

5.1.50 Chemistry Technician shall Place SS-0210 (selector switch for continuous sample) in the OFF position.

5.1.51 Chemistry Technician shall Place SS-0211 (selector switch for continuous sample) in the OFF position.

5.1.52 To disable ihe alarm function for TIS-1901 perform the following:

a. If the Green LED is not lit, push A/M touch pad to enter the Manual Mode (Green LED on).
b. Push the d6wn-arrow pad until output equals 0.0. The display will read OUT 0.0. The Red LED labeled ALl will remain "ON" if sample temperature is

>_900 F.

5.1.53 OSC Chemistry Supervisor shall request Operations to close CV-1910 and CV-1911.

5.1.54 Chemistry Technicians shall perform sample and analysis preparation in the Hot Lab Hood. Use sample shield in the Hot Lab as necessary.

5.1.55 Chemistry will perform analyses in accordance with the appropriate analytical procedures. Dilutions may be done to ensure sample dose rates are reduced.

5.1.56 Chemistry Technician shall report results to OSC and TSC Chemistry Supervisors.

5.1.57 OSC Chemistry Supervisor shall request I&C to remove jumpers for CV-1910 and CV-1 911, if applicable.

PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 15 of 22 TITLE: EMERGENCY POST ACCIDENT SAMPLING AND DETERMINATION OF FUEL FAILURE USING DOSE RATES 5.2 SUBSEQUENT POST ACCIDENT SAMPLING Post accident sampling may be performed at the NSSS sample panel or in other areas of the plant using normal or evaluated samp!e points.

5.2.1 OSC Chemistry Supervisor shall conduct a pre-job brief in accordance with Palisades Administrative Procedure 1.15, "Perforniance ofiJob 'Briefings" or Emergency Implementing Procedure El 4.2, "Operational Support Center Activation."

a. The OSC Chemistry Supervisor shall determine the PCS pressure from

-Operations. . -

PCS Pressure ";psig b The OSC Chemistry Supervisor telephone number 5.2.2 Chemistry Supervision shall ensure pre-determined storage and disposal sites of used and unused portions of the sample are specified. Consider returning sample to the containment-building if possible.

{ .

PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 16 of 22 TITLE: EME-GE1.,CY POST ACCIDENT SAMEPLING AND DETERMINATION OF FUEL FAILURE USING DOSE RATES CAUTION This sampling will result in transferring sample water from the reactor or containment sump to the VCT or Chemistry lab drain tank. This may result in increased dose rates in these areas.

5.2.3

-- r IF THEN Containment Isolation Signal 1. OSC Chemistry Supervisor shall (CIS) is received request I&C to jumper CV-1910 and CV-1 911 per the directions found in Attachment 1.

2. OSC Chemistry Supervisor shall request Operations to reopen CCW Valve CV-944A so that cooling is supplied to the sample coolers per System Operating Procedure SOP-16," Component Cooling Water System."
3. OSC Chemistry Supervisor shall
a. Request Operations to open CV-1910and CV-1911
b. Inform Operations that PCS sample flow will be routed to the Volume Control Tank
c. Inform Operations that manipulation of TIS-1901 may cause an alarm in the Control Room.

Containment Isolation Signal OSC Chemistry Supervisor shall (CIS) is not received a. Request Operations to open CV-1910 and CV-1911

b. Inform Operations that PCS sample flow will be routed to the Volume Control Tank
c. Inform Operations that manipulation of TIS-1 901 may cause an alarm in the Control Room.

PALISADES'NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 17 of 22 TITLE: EMERGENCY POST ACCIDENT SAMPLING AND)"

DETERMINATION OF FUEL FAILURE USING DOSE RATES "5.2.4 Chemistry Technician shall check or place HS-1 912 (Reactor Coolant (RC) or Low' Pressure Safety Injection (LPSI) selector switch) in the OFF position, to block flow to the EC-168 Control Panel. Switch is located at EC-168 Control Panel.

5.2.5 Chemistry Technician shall verify CV-1 912 (Reactor Coolant Sample block valve)

CLOSED (green indicator light). Switch is located at EC-168 Control Panel.

5.2.6 Chemistry Technician shall place SS-0210 (selector switch for continuous sample) in the ON position. Switch is located at EC-168 Control Panel.

5.2.7 C Chemistry Technician shall place SS-0211 (selector switch fo continuous'sample) in the ON position. Switch is located at EC-168 Control Panel. '

NOTE:- Manipulation of the following alarm function may cause an alarm at the panel and in the Control Room.

5.2.8 Chemistry Technician shall verify that temperature indicating switch TIS-1 901 is in service. Ifthe Green LED is ON (unit in Manual Mode), enable the alarm function by pushing A/M touch pad. This enters Auto Mode with Green LED off. The lower display will now show SP 0.0.

5.2.9 IF "THEN J HI-HI Sample Temp Alarm on Place HS-1 919 to MANUAL.'.

C-168 panel exists.

HI-HI Sample Temp Alarm on Check that HS-1919 is in AUTO.

C-168 panel does not exist.

Chemistry Technician shall ,place HS-1916 (Reactor Coolant sample flush switch) in 5.2.10 the SAMPLE position.

Chemistry Technician shall verify SV-1917 CLOSED (green indicator light) 5.2.11 5.2.12 Chemistry Technician shall verify SV-1916 OPEN (red indicator light).

5.2.13 Chemisry Technician shall verify CLOSED MV-V37 (gas collection bomb vent) 5.2.14 Chemistry Tech-nicia' shall verify CLOSED MV-V17 (PCS sx to sink) 5.2.15 Chemistry Technician shall verify CLOSED MV-V41 (gas collection bomb inlet)

I PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 18 of 22 TITLEt, EMERG3.0iCV,' POST ACCIDENT SAMPLING AND D__TE____**___

_ _ IIT !UEL FAILURE USING DOSE RATES 5.2.16 Chemistry Technician shall verify CLOSED MV-V42 (gas collection bomb outlet).

5.2.17 Chemisiry Technician shall verify OPEN MV-V38 (NSSS to gas collection bomb isolation).

5.2.18 Chemistry Technician shall verify OPEN MV-V39 (gas collection bomb bypass).

5.2.19 Chemistry Technician shall verify OPEN MV-V40 (discharge to VCT).

5.2.20 IF THEN PCS pressure is < 2000 psig Fully Open MV-PC606 PCS pressure is > 2000 psig No action required.

5.2.21 At the C-32 panel:

"IF THEN HS-1901 (NSSS panel C-32 No adjustment is necessary. Proceed sample selector switch) is in to next step.

Position 3.

HS-1 901 (NSSS panel C-32 1. Ensure or place air control switch sample selector switch) is not in CS-5057 in the OFF position.

Position 3.

2. Place the selector hand switch HS-1901 to Position 3.
3. Open the bottom of the C-32 panel.
4. Verify position of the solenoid valve as follows:
a. OPEN MV-PC163 (SV-1909 isolation) to open discharge from SV-1 909.
b. CLOSE MV-PC161 (SV-1 906 isolation) to close discharge from SV-1906.
c. CLOSE MV-PC162 (SV-1 908 isolation) to close discharge from SV-1908.

p PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 19 of 22 TITLE: EMERGENCY POST ACCIDENT SAMPLING AND DETERMINATION OF FUEL FAILURE USING DOSE RATES 5.2.22 Chemistry Technician shall place air control switch CS-5057 in the ON position.

5.2.23 At the C-168 panel, Chemistry Technician shall verify OPEN CV-1910 (Red Indicator Light On).

5.2.24 At the C-168 panel, Chemistry Technician shall verify OPEN CV-i9il (Red Light On). ,

5.2.25 At the C-168 panel, Chemistry Technician shall verify OPEN CV-1 903 (primary coolant loop 2 hot leg sample point) open.

5.2.26 All personnel move to a lowdose area. -,

5.2.27 Allow system to purge for 3 minutes.

5.2.28 Radiation Protection Technician shall take a dose reading at the sample panel door and at the NSSS sample panel.

-IF- -* :THEN Dose rate at the NSSS door or Sample will not be obtained.

panel> 5 Rem/hr.

1. SECURE sample flow by placing SV-1916 OFF.
2. SECURE sample flow by'placing CS-5057 OFF.

3.- Report dose reading to OSC Chemistry

. Supervisor and OSC HP Supervisor.

Elevated dose rates will occur in'the Auxiliary Building if sample flow dose iates exceed this value.

4-. -OSC Chemistry Supervisor shall

-- request Operations to secure CV-1910 "andCV-1911.

5. Technicians shall report to OSC.
6. END procedure.

Dose rate at the NSSS panel Proceed to next ,step.,

_5 Rem/hrrwhen sample flow' is initiated.

PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 20 of 22 TITLE' EMERG*.NY POET ACCIDENT SAMPLING AND DETERM.iNATIONt OF FUEL FAILURE USING DOSE RATES 5.2.29 IF THEN HI-HI Temperature Alarm is Place HS-1919 to AUTO.

Clear.

HI-HI Temp-,rature Alarm is 1. Verify or place MV-CC175 OPEN not Clear.

2. Verify or place MV-CC176 OPEN.
3. Contact OSC Chemistry Supervisor if alarm still does not clear. He will need to contact Operations to determine cause.

5.2.30 All personnel move to a low dose area.

5.2.31 Allow sample flow and discharge to the VCT for a minimum of 20 minutes.

5.2.32 Chemistry Technician shall OPEN Valve MV-V17 (PCS sx to sink).

5.2.33 Chemistry Technician shall CLOSE Valve MV-V40 (Discharge to VCT).

5.2.34 All personnel move to a low dose area.

5.2.35 Flush sample line for 5 minutes.

NOTE: PCS sample volume collected depends on the analyses that will be performed. At the very least, boron and gamma spectroscopy analyses will be done.

5.2.36 Chemistry Technician shall obtain appropriate volume of PCS sample.

5.2.37 Chemistry Technician shall OPEN valve MV-V40 (discharge to VCT).

5.2.38 Chemistry Technician shall CLOSE Valve MV-V17 (PCS sx to sink).

5.2.39 Chemistry Technician shall Place the C-32 panel air control switch CS-5057 in the OFF position.

5.2.40 At the C-168 panel, place HS-1916 (reactor coolant sample/flush switch) in the OFF position.

5.2.41 Chemistry Technician shall place SS-0210 (selector switch for continuous sample) in the OFF position.

PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 21 of 22 TITLE: EMERGENCY POST ACCIDENT SAMPLING AND DETERMINATION oF FUEL FAILURE USING DOSE RATES 5.2.42 Chemistry Technician shall place SS-0211 (selector switch for continuous sample) in the OFF position.

5.2.43 To disable the alarm function for.TIS-1901 perform the following:

a. If the Green LED is not lit, push A/M touch 'pad to enter the Manual Mode (Green LED on).
b. Push the down-arrow pad until output equals 0.0. The display will read out 0.0. The Red LED labeled ALl will remain "ON" if sample temperature is _

900 F.

5.2.44 OSC Chemistry shall request Operations to close CV-1910 and CV-1911.

5.2.45 Chemistry Technicians shall perform sample and analysis preparation in the Hot Lab Hood. Use sample shield in the Hot Lab as necessary.

5.2.46 Chemistry Technicians shall perform analyses in accordance with the appropriate analytical procedures. Dilutions may be done to ensure sample dose rates are reduced.

5.2.47 Chemistry Technician shall report results to OSC and TSC Chemistry Supervisors.

5.2.48 OSC Chemistry Supervisor shall request I&C to remove jumpers for CV-1 910 and CV-1911.

6.0 ATTACHMENTS AND RECORDS 6.1 ATTACHMENTS 6.1.1 Attachment 1, "Jumpering CV-1910 and CV-1911 for PCS Sample or Sample Line Flush" 6.1.2 Attachment 2, "NSSS Sample Panel Piping Dose Rates" 6.2 RECORDS Records generated by this procedure shall be filed in accordance with Palisades Administrative Procedure 10.46, "Plant Records."

PALISADES NUCLEAR PLANT Proc No EI-7.0 EMERGENCY IMPLEMENTING PROCEDURE Revision 8 Page 22 of 22 TITLE: EMERGENCY POST ACCIDENT SAMPLING AND DETERMINATION OF FUEL FAILURE USING DOSE RATES 7.0 SPECIAL REVIEWS The scope of this procedure does include activities that require a 50.59 review per Palisades Administrative Procedure 10.41, "Procedure Initiation and Revision."

Therefo.re, changes to this procedure do require a 50.59 review.

The scope of this procedure does include activities that require a PRC review per Palisades Administrative Procedure 10.41, "Procedure Initiation and Revision."

Therefore, changes to this procedure do require a PRC review.

Proc No EI-7.0 Attachment 1 JUMPERING CV-1910 AND CV-1911 Revision 8 FOR PCS SAMPLE OR SAMPLE LINE FLUSH Page I of 3 NOTE: This Attachment cannot be performed if instrument air is not available.

1.0 -PURPOSE This attachment describes the method to be used -tojumpercontainment isolation valves CV-1910 and CV-1911 should they become closed during accident conditions (Containment Isolation). -Inorder to sample the Primary Coolant System (PCS),

CV-1910 and CV-1911 must be open.

2.0 REFERENCES

2.1 Palisades Administrative Procedure 9.31, "Temporary Modification Control" 3.0 INITIAL CONDITIONS ANDIOR REQUIREMENTS 3.1 CV-1 910 and CV-1911 are the containment isolation valves on the PCS chemistry

,sample lines. In the event of a containment isolation signal due to Containment High Pressure (CHP) and/or Containment High Radiation (CHR), CV-1910 and CV-1911 will close.

3.2 To obtain a sample of the PCS under accident conditions using the NSSS panel, it will be necessary to bypass the CHP and/or CHR relay contacts to open these valves.-

4.0 PROCEDURE 4.1 I&C shall verify availability of instrument air before starting Jumpering. This Jumpering can only be performed if instrument air is available..

4.2 1I&C or Electrical Maintenance may obtain jumper set and #10 link nuts from Emergency Maintenance Kit 9 in the Operations Support Center (OSC).

4.3 Request Operations to place HS-1910 and HS-1911 in the open position (CV-1910 and CV-1 911 should remain shut.) Advise Operations that while jumpers are being placed, they will lose valve indications. Valve indications will-be restored after jumpers are in place.

Proc No El-7.0 Attachment 1 JUMFERING CV-19'10 AND CV-1911 Revision 8 FOR PCS- SAMPLE OR SAMPLE LINE FLUSH Page 2 of 3 4.4 Inside C-13 Panel NOTE: Circuits involved labeled P1 are 125 VDC positive supply to valve position indication.

a. Locate 13TV4-28 (P1) scheme S-21 (M201, Sheet 40) and open link.
b. Attach appropriate end of jumper to P1 side to link using #10 nut and link wrench.
c. Locate 13TV6C-19 (91) scheme S-21 (M201, Sheet 113), string jumper so that it is out of the way so as not to be pulled apart, and attach other end of jumper using #10 nut and link wrench.
d. Close link at 131V4-28 (P1) scheme S-21 (opened in a). Verify position indication restored and CV-1910 still closed.
e. Locate 13TV1I1-112 (P1) scheme S-22 (M201, Sheet 35) and open link.
f. Attach appropriate end of jumper to P1 side of link using #10 nut and link wrench.
g. Locate 13TV8C-24 (91) scheme S-22 (M201, Sheet 113), string jumper along floor under grating so it is out of the way and attach other end of the jumper using #10 nut and link wrench.
h. Close link at 13TV11-112 (P1) scheme S-22 (opened in e). Verify position indication restored and CV-1911 still closed.

4.5 Inform Operations that jumpering operation is complete and to place HS-1910 and HS-1911 in the closed position. Returning either hand switch back to the open position will now cause valves to open.

Proc No EI-7.0 Attachment 1 JUMPERING CV-1910 AND CV-1911 Revision 8 FOR PCS SAMPLE OR SAMPLE LINE FLUSH Page 3 of 3 WARNING Once sampling valves are open, a potential exists for High Radiation Fields to be created at the NSSS Panel.

4.6 Request Operations to caution tag HS-1910 and HS-1911 indicating that CHP and CHR relay contacts are jumpered out for CV-1910 and CV-1911.

4.6.1 If the valves remain jumpered open for longer than one shift, then 'Caution tags shall be required. ""

4.7 Removal of Jumpers 4.7.1 I&C or Electrical Maintenance obtain permission from Shift Supervisor to remove jumpers on CV-1910 and CV-1911.

4.7.2 Inside C-13 Panel S NOTE: Circuits involved labeled P1 are 125 VDC positive supply to valve position indication.

a. Locate 13TV, 1-112 (P1) scheme S-22 and open link.
b. Remove appropriate end of jumper using a link wrench.
c. Locate 13TV8C-24 (91) scheme S-22 (M201, Sheet 113) and remove jumper using a link wrench.
d. Locate 13TVI1-112 (P1) scheme S-22 (M201, Sheet 35) and close link.
e. Locate 13TV4-28 (P1) scheme S-21 and open link.
f. Remove appropriate end of jumper using a link wrench.
g. Locate 13TV6C-19 (91) scheme S-21 (M201, Sheet 113) and remove appropriate end of jumper using a link wrench.
h. Locate 13TV4-28 (P1) scheme S-21 (M201, Sheet 40) and close link.

4.7.3 Inform Operations that removal of jumpers is complete.