J. Barnie Beasley, Jr., P.E.
Vice President Tel 205 992 7110 Fax 205 992 0403 November 11, 2002 Docket Nos.:
50-348 50-364 4Ir SOUTHERNZ COMPANY Energy to Serve Your World*
NEL-02-0231 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Enclosed are the October 2002 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 5.6.4 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, RWC:mor
Enclosures:
- 1. October Monthly Operating Report for Plant Farley Unit 1
- 2. October Monthly Operating Report for Plant Farley Unit 2 Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham. Alabama 35201
Page 2 U. S. Nuclear Regulatory Commission cc:
Southern Nuclear Operating Company Mr. D. E. Grissette, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.
Mr. F. Rinaldi, Licensing Project Manager - Farley U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley
OPERATING DATA REPORT DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit I DATE:
November 5, 2002 COMPLETED BY:,
W. L. Marlar TELEPHONE:
(334) 814-4554 OPERATING STATUS
- 1. Reporting Period:
OCTOBER 2002
- 2.
Design Electrical Rating (Net MWe):
854
- 3.
Maximum Dependable Capacity (Net MWe):
833 This Month Year to Date Cumulative
- 4. -Number Of Hours Reactor Was Critical:
- 5. Hours Generator On-line:
- 6.
Unit Reserve Shutdown Hours:
- 7.
Net Electrical Energy Generated (MWH):
715.2 707.7 0.0 584,103.0 7,235.3 179,481.2 7,211.7 177,179.9 0.0 0.0 6,014,361.0 140,367,307.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.
Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
El-1
UNIT SHUTDOWNS REPORTING PERIOD: OCTOBER 2002 DOCKET NO.:
50-348 UNIT NAME: J. M. Farley - Unit 1 DATE: November 5,2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 Type Method of Date F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.
(YYMMDD)
S: Scheduled (Hours)
(1)
(2)
Comments 2
021015 F
37.3 A
2 Reactor trip due to a control rod dropping 24 steps during rod movement for flux control.
(LER 2002-002-00 Unit 1 pending)
(1) REASON (2) METHOD A - Equipment Failure (Explain)
I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT El-2 At 2356 on October 15, Unit 1 was manually tripped due to a partially dropped control rod during control rod movement for flux control. After repairs were completed, the unit was synchronized to the grid at 1314 on October 17 and was returned to 100% power at 0242 on October 18.
OPERATING DATA REPORT DOCKET NO.:
50-364 UNIT NAME:
J. M Farley - Unit 2 DATE:
November 5, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 OPERATING STATUS
- 1.
- 2.
3.
Reporting Period:
OCTOBER 2002 Design Electrical Rating (Net MWe):
855 Maximum Dependable Capacity (Net MWe):
842 This Month Year to Date Cumulative
- 4.
Number Of Hours Reactor Was Critical:
- 5.
Hours Generator On-line:
- 6.
Unit Reserve Shutdown Hours:
- 7.
Net Electrical Energy Generated (MWH):
94.6 75.8 0.0 20,836.0 6,238.7 161,724.3 6,218.8 159,764.6 0.0 0.0 5,198,834.0 127,780,913.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.
Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
E2-1
UNIT SHUTDOWNS REPORTING PERIOD: OCTOBER 2002 DOCKET NO.:
50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: November 5,2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 Type Method of Date F: Forced Duration Reason Shutting Down Cause/Corrective Actions No. (YYMMDD)
S: Scheduled (Hours)
(1)
(2)
Comments 1
020914 S
669.2 C
1 The fifteenth refueling outage was completed on October 28, 2002.
(I)
REASON (2) METHOD A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Traming/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT F
E2-2 At 2011 on October 28, the U2RF15 outage was completed and the unit was synchronized to the gria.
This refueling outage completion date includes an extension of approximately 17 days primarily to correct control rod problems encountered during control rod testing at the end of the scheduled outage.
f