ML023100327

From kanterella
Jump to navigation Jump to search
Revision to EOF Dose Calculator
ML023100327
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/28/2002
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
EP-PS-249, Rev 0
Download: ML023100327 (4)


Text

Oct.

28, 2002 tC:

Page 1

of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2002-48334 56-357 USER INFORMATION:

rLAtjt jltURt---t EMPL#:23244 CA#: 0363 A~~*

IIUC*Dn Phone#: 254-3658 TRANSMITTAL INFORMATION:

T MELAIM*LAUREL B

10/28/2002 LOCATION:

DOCUMENT CONTROL DESK FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER

NUCSA-2)

"V.-A2HE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

249 249 EOF DOSE CALCULATOR REMOVE MANUAL TABLE OF CONTENTS DATE:

09/25/2002 ADD MANUAL TABLE OF CONTENTS DATE:

10/25/2002 CATEGORY:

PROCEDURES TYPE:

EP ID:

EP-PS-249 ADD:

PCAF 2002-1660 REV:

N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY.

FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

PROCEDURE CHANGE PROCESS FORM

1. PCAFNO.2cO'J. y
12. PAGE 1 OF 3
13. PROC. NO.

EP-PS-249 REV. 0

4. FORMSREVISED R._, -

R-,

R R

R

__R

5.

PROCEDURE TITLE EOF DOSE CALCULATOR: Emergency-Plan-Position-Specific Instruction

6.

REQUESTED CHANGE PERIODIC REVIEW Z

NO [] YES INCORPORATE PCAFS

-NO I-YES REVISION E]

PCAF Z DELETION

[7 (CHECK ONE ONLY)

7.

SUMMARY

OF/ REASON FOR CHANGE Tab C:

  • section 1 b: Revised to state: Report SPING total release rate(s) chang*es section lb 1), change from Data invalid, (white), to Data suspect,-(white)..

Continued El

8.

DETERMINE COMMITTEE REVIEW REQUIREMENTS,,

(Refer to Section 6.1.4)

PORC REVIEW REQ'D?

L

'N I YES

9.

PORCMTG#

NA BLOCKS 11 THRU 16 ARE ON PAGE.2OFFORM

17.

W. F. Tabor

/

3665

.,. 10/24/2002

18. COMMUNICATION OF CHANGE REQUIRED?

PREPARER

/*,.o T**'.DATE I*NO

[] YES (TYPE)

(Print or Type)

{'

19.

ySIGNATURE ATTESTS THAT RESPONSIBLE SUPERVISOR HAS 19...CONDUCTED QADR AND TECHNICAL REVIEW UNLESS OTHERWISE 4 ep l 0-3 M3 A-1 4-DOCUMENTED IN BLOCK 16 OR ATTACHED REVIEW FORMS.

RESPN IBLE 1

UPERVISOR DATE CROSS DISCIPLINE REVIEW (IF REQUIRED) HAS BEEN COMPLETED BY SIGNATURE IN BLOCK 16 OR ATTACHED REVIEW FORMS.

20.

1M 2R41ozL AT (LVJM4P'PROVAL DATE-

21.

RESPONSIBLE APPROVER IN A INITIALS DATE ENTER N/A IF FUM HAS APPROVAL AUTHORITY FORM NDAP-QA-0002-8, Rev. 8, Page 1 of 2 (Electronic Form)

I I

C PROCEDURE CHANGE PROCESS FORM

1. PCAFNO.'160'L_--ije(C
12. PAGE2OF 3

-13.

PROC.NO.

EP-PS-249 REV. 0

11.

This question documents the outcome of the 50.59 and 72.48 Review required by NDAP-QA-0726.

b, c or d must be checked "YES" and the appropriate form attached or referenced.

a. This change is an Administrative Correction for which 50.59 and 72.48 are not YES applicable.
b. This change is a change to any surveillance, maintenance or administrative E] YES procedure for which 50.59 and 72.48 are not applicable.
c. This change is bounded by a 50.59/72.48 Screen/Evaluation, therefore, no new E-] YES 50.59/72.48 Evaluation is required.

Screen/Evaluation No.

d. 50.59 and/or 72.48 are applicable to this change and a 50.59/72.48

] YES Screen/Evaluation is attached.

12. This change is consistent with the FSAR or an FSAR change is required.

[

YES Change Request No.

13. -Should this change be reviewed for potential effects on Training Needs or Material?

] YES If YES, enter an Action Item @ NIMS/Action/Gen Work Mech/PICN

14. Is a Surveillance Procedure Review Checklist required per NDAP-QA-0722?

E-YES

15. Is a Special, Infrequent or Complex Test/Evolution Analysis Form required per E-YES NDAP-QA-0320? (SICT/E form does not need to be attached.)

Either 11 a, El N/A

[

N/A

[

N/A I

N/A SNO SNO SNO

16. Reviews may be documented below or by attaching Document Review Forms NDAP-OA-0101-1.

REVIEWED BY WITH DATE REVIEW NO COMMENTS QADR TECHNICAL REVIEW REACTOR ENGINEERING/NUCLEAR FUELS IST

  • OPERATIONS NUCLEAR SYSTEMS ENGINEERING NUCLEAR MODIFICATIONS MAINTENANCE HEALTH PHYSICS NUCLEAR TECHNOLOGY CHEMISTRY OTHER 10 CFR 50.54q

/C

.. G*

-t

/c vq -o Required for changes that affect, or have potential for affecting core reactivity, nuclear fuel, core power level indication or impact the thermal power heat balance. ( 5)

Required for changes to Section XI Inservice Test Acceptance Criteria.

FORM NDAP-QA-0002-8, Rev. 8, Page 2 of 2 (Electronic Form)

PCAF #Zo;Z.(i4*

TAB C EP-PS-249.-C

/

PAGE -

OF Revision2i 9C Page 1 of 1 MAJOR TASK:

Monitor PICSY (METNENT screen), notifying the Dose Assessment Staffer and Dose Assessment Supervisor of significant changes.

SPECIFIC TASKS:

HOW:

1.

Monitor PICSY METNENT Screen.

HELP METEOROLOGICAL DATA ACQUISITION See TAB I Ia.

Report met conditions that affect monitoring strategy currently in use to the Dose Assessment Supervisor and Dose Assessment Staffer.

1) Wind shift greaterthan 900
2) Wind change that alters affected sector
3) Rain or snow
4) Change of two or more stability classes based Dn A t or sigma theta data.

lb. -v45PING total release rate(s) change.

1) Data (white)

?A

2) Release criteria exceeded
3) EAL 15.1 or 15.2 criteria exceeded
4) Trend indicating potential'for increase of release.