MONTHYEARML0230303282002-10-30030 October 2002 Facsimile Transmission, Issues to Be Discussed in an Upcoming Conference Call Project stage: Other ML0321704942003-07-29029 July 2003 Tech Spec Pages for Amendment 279 Electrical Power Systems - D.C. Distribution Project stage: Other ML0318801822003-07-29029 July 2003 Issuance of License Amendment 279 Electrical Power Systems - D.C. Distribution Project stage: Approval 2002-10-30
[Table View] |
|
---|
Category:Memoranda
MONTHYEARML22130A1702022-05-20020 May 2022 Summary of April 21, 2022, Public Meeting to Discuss Potential Emergency Preparedness License Amendment Request ML22028A3502022-01-21021 January 2022 Green Mountain Power, 2021 Annual Summary of Special Nuclear Committee ML21027A0232021-01-28028 January 2021 Summary of January 26, 2021 Closed Meeting with Dominion Energy Regarding Performance of Force on Force Exercises in a Pandemic Environment ML19165A1192019-06-14014 June 2019 Memoranda to File Environmental Assessment and Finding of No Significant Impact for the Virginia Electric and Power Company, Dominion Energy Kewaunee, Inc., and Dominion Nuclear Connecticut, Inc.'S Decommissioning Funding Plans Submitted ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML15075A1922015-03-26026 March 2015 Reactor Coolant System Alloy 600 Inspection Program for License Renewal Commitment No. 14. (Tac No. MF3433) ML13031A1832013-02-0505 February 2013 Closed Meeting Announcement Millstone Drop-In ML13032A0572013-01-30030 January 2013 2012 Annual Summary of the Green Mountain Power Special Nuclear Committee ML12178A6132012-06-27027 June 2012 Notice of Forthcoming Pre-Application Meeting with Dominion Nuclear Connecticut, Inc. to Discuss a Proposed Millstone Power Station, Unit 2, License Amendment Request Concerning Spent Fuel Pool Criticality Re-Analysis ML13196A2202012-06-0606 June 2012 Memo from B. Balsam, NRR and D. Logan, NRR to J. Susco, NRR on Summary of Section 7 Consultation Activities Related to the National Marine Fisheries Service'S Final Rule to List the Atlantic Sturgeon ML11271A1782011-10-0303 October 2011 Review of Topical Report, Revision 11 for Kewaunee Power Station and ISFSI, Millstone Power Station, Units 1, 2, & 3 and ISFSI, North Anna Power Station, Units 1 & 2 and ISFSI, Surry Power Station, Units 1 & 2 and ISFSI (Tac ME6649, ME6650, ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1116804602011-06-30030 June 2011 Review of Commitment Change Report for 2009 ML1103106822011-02-0101 February 2011 Revised Notice of Forthcoming Public Meeting with Dominion Nuclear Connecticut, Inc., to Discuss Millstone Power Station Licensing Activities ML1100701752011-01-11011 January 2011 Request for Technical Assistance on Request for Exemption Form Certain Requirements of 10 CFR 73.55 for Millstone Power Station, Unit 1 ML1035103202010-12-20020 December 2010 30-Day Report of Emergency Core Cooling System Model Change ML1033305502010-12-15015 December 2010 Potential Notice of Enforcement Discretion for the Turbine Driven Auxiliary Feedwater Pump ML1031202422010-11-0808 November 2010 Notice of Teleconference with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit No. 3 Generic Letter 2004-02 Supplemental Response ML1030100732010-10-28028 October 2010 Meeting Notice Milestone Power Station Revised 10 CFR 73.55 ML1019502842010-07-14014 July 2010 Notice of Forthcoming Public Teleconference with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit No. 3 Generic Letter 2004-02 Supplemental Response ML1008204222010-03-26026 March 2010 Notice of Conference Call with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit Nos 2 and 3 Generic Letter 2004-02 Supplemental Responses ML1003314992010-03-0101 March 2010 Notice of Conference Call with Dominion Nuclear Connecticut, Inc., to Discuss Millstone Power Station, Unit Nos. 2 and 3 Generic Letter 2004-02 Supplemental Responses ML0931406252009-11-17017 November 2009 Summary of Teleconference Verbal Authorization for Relief Request RR-89-67 ML0913401332009-05-15015 May 2009 Notice of Forthcoming Meeting with Dominion Nuclear Connecticut, Inc. to Discuss the Submittal of a License Amendment Request Regarding the Removal of Charging Pumps from the Technical Specifications for Millstone Power Station, Unit No. 2 ML0906205722009-03-0303 March 2009 Meeting Minutes of the Power Uprates Subcommittee, July 8, 2008 ML0811500912008-04-23023 April 2008 Proposed Stretch Power Uprate to Millstone Power Station, Unit 3 ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0734708412007-12-11011 December 2007 Drop-In Visit from Dominion (Millstone) ML0730304052007-10-31031 October 2007 E. Marinos Memo Technical Assistance Request-Dominion Resources, Inc.'S December 6, 2006, Request for Exemption from 10 CFR 74.13(a) Requirements Regarding Material Status Report Submittal Time Frame ML0715100542007-05-31031 May 2007 Closeout of TAC Numbers for Licensing Activities That Do Not Require Staff Review ML0710201942007-04-24024 April 2007 Draft Open Items from Staff Audit of Corrective Actions to Address Generic Letter 2004-02 ML0707902492007-03-20020 March 2007 Facsimile Transmission, Draft Request for Additional Information Regarding Steam Generator Tube Integrity ML0634902692007-01-11011 January 2007 Memo: K. Mcconnell to M. Lesar - Notice of Environmental Assessment and Finding of No Significant Impact Related to Partial Exemption from 10 CFR Part 50, Recordkeeping Requirements - Millstone Power Station, Unit 1 ML0633901162006-12-19019 December 2006 Fax - Draft Request for Additional Information Regarding Post-Maintenance/Modification Surveillance Requirements ML0630701472006-12-12012 December 2006 Facsimile Transmission, Draft Request for Additional Information ML0631101502006-11-13013 November 2006 Request for Additional Information Regarding Human Factors - Millstone, Unit 2, Alternate Source Term License Amendment Request ML0626800242006-10-0202 October 2006 Transfer of Project Management Responsibilities ML0625100662006-09-29029 September 2006 Facsimile Transmission, Draft Request for Additional Information Regarding Extension of Integrated Leakage Rate Test Interval ML0619500042006-07-14014 July 2006 Facsimile Transmission, Draft Request for Additional Information Regarding Post Maintenance/Modification Surveillance Requirements ML0619500092006-07-14014 July 2006 Facsimile Transmission, Draft Request for Additional Information Regarding Relaxation Request IR-2-46, Reactor Pressure Vessel Head Inspections ML0617805592006-07-10010 July 2006 Revised Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. ML0617701952006-06-26026 June 2006 Closeout of Tac Number for Licensing Activities Incorrectly Identified for Staff Review ML0606702532006-03-24024 March 2006 Facsimile Transmission, Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call ML0608601632006-03-21021 March 2006 Handouts to Applicants (Folder 3) ML0604005082006-03-0202 March 2006 Facsimile Transmission, Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call ML0602700882006-01-31031 January 2006 Facsimile Transmission Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call (Tac No. MC8327) ML0602502612006-01-26026 January 2006 Facsimile Transmission, Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call ML0528500672005-10-25025 October 2005 Facsimile Transmission RAI to Be Discussed in an Upcoming Conference Call 2022-05-20
[Table view] |
Text
October 30, 2002 MEMORANDUM TO: James W. Andersen, Acting Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Richard B. Ennis, Sr. Project Manager, Section 2 /RA/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
MILLSTONE POWER STATION, UNIT NO. 2, FACSIMILE TRANSMISSION, ISSUES TO BE DISCUSSED IN AN UPCOMING CONFERENCE CALL (TAC NO. MB6110)
The attached information was transmitted by facsimile on October 29, 2002, to Mr. Ravi Joshi of Dominion Nuclear Connecticut, Inc. (the licensee). This information was transmitted to facilitate a upcoming conference call in order to clarify the licensees amendment request dated August 12, 2002, as supplemented October 21, 2002. The proposed amendment would revise Technical Specification (TS) 3.8.2.3, Electrical Power Systems, D.C. Distribution - Operating, TS 3.8.2.4, Electrical Power Systems, D.C. Distribution - Shutdown, and TS 3.8.2.5, Electrical Power Systems, D.C. Distribution Systems (Turbine Battery) - Operating to use standard technical specification terminology in order to provide enhanced readability and usability. The proposed amendment would also provide additional criteria for determining battery operability upon restoration from a recharge or equalizing charge. This memorandum and the attachment do not convey a formal request for information or represent an NRC staff position.
Docket No. 50-336
Attachment:
Issues for Discussion in Upcoming Telephone Conference
October 30, 2002 MEMORANDUM TO: James W. Andersen, Acting Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Richard B. Ennis, Sr. Project Manager, Section 2 /RA/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
MILLSTONE POWER STATION, UNIT NO. 2, FACSIMILE TRANSMISSION, ISSUES TO BE DISCUSSED IN AN UPCOMING CONFERENCE CALL (TAC NO. MB6110)
The attached information was transmitted by facsimile on October 29, 2002, to Mr. Ravi Joshi of Dominion Nuclear Connecticut, Inc. (the licensee). This information was transmitted to facilitate a upcoming conference call in order to clarify the licensees amendment request dated August 12, 2002, as supplemented October 21, 2002. The proposed amendment would revise Technical Specification (TS) 3.8.2.3, Electrical Power Systems, D.C. Distribution - Operating, TS 3.8.2.4, Electrical Power Systems, D.C. Distribution - Shutdown, and TS 3.8.2.5, Electrical Power Systems, D.C. Distribution Systems (Turbine Battery) - Operating to use standard technical specification terminology in order to provide enhanced readability and usability. The proposed amendment would also provide additional criteria for determining battery operability upon restoration from a recharge or equalizing charge. This memorandum and the attachment do not convey a formal request for information or represent an NRC staff position.
Docket No. 50-336
Attachment:
Issues for Discussion in Upcoming Telephone Conference DISTRIBUTION PUBLIC JAndersen SSaba PDI-2 Reading REnnis DOCUMENT NAME: C:\ORPCheckout\FileNET\ML023030328.wpd ACCESSION NO.: ML OFFICE PDI-2/PM NAME REnnis DATE 10/29/02 OFFICIAL RECORD COPY
ISSUES FOR DISCUSSION IN UPCOMING TELEPHONE CONFERENCE REGARDING PROPOSED AMENDMENT TO TECHNICAL SPECIFICATIONS ELECTRICAL POWER SYSTEMS - D.C. DISTRIBUTION MILLSTONE POWER STATION, UNIT NO. 2 DOCKET NO 50-336 By letter dated August 12, 2002, as supplemented October 21, 2002, Dominion Nuclear Connecticut, Inc. (the licensee) submitted a proposed amendment to the Technical Specifications (TSs) for Millstone Power Station, Unit No. 2 (MP2). The proposed amendment would revise TS 3.8.2.3, Electrical Power Systems, D.C. Distribution - Operating, TS 3.8.2.4, Electrical Power Systems, D.C. Distribution - Shutdown, and TS 3.8.2.5, Electrical Power Systems, D.C. Distribution Systems (Turbine Battery) - Operating to use standard technical specification terminology in order to provide enhanced readability and usability. The proposed amendment would also provide additional criteria for determining battery operability upon restoration from a recharge or equalizing charge.
The Nuclear Regulatory Commission (NRC) staff has reviewed the information the licensee provided that supports the proposed TS changes and would like to discuss the following issues to clarify the submittal:
- 1) The proposed amendment adds new TS Tables 4.8-1 and 4.8-2 to reformat the existing battery cell parameter limits currently shown in TSs 4.8.2.3.2 and 4.8.2.5.2. Proposed Tables 4.8-1 and 4.8-2 indicate that verifying the electrolyte level in each connected cell is not required. The current TSs also do not contain a surveillance requirement (SR) for verifying electrolyte level in the connected cells (although the current TSs do not explicitly state that the tests are not required). Section 8.5.4.2 of the MP2 Final Safety Analysis Report (FSAR) states that electrolyte level of each cell is checked periodically. For some of the other proposed changes, the submittal states that the changes are consistent with IEEE Standard 450-1980, IEEE Recommended Practice for Maintenance, Testing, and Replacement of Large Lead Storage Batteries for Generating Stations and Substations.
IEEE-450-1980, Section 4.3.1, recommends that electrolyte levels be checked at least once per month. The standard technical specifications (NUREG-1432, SR 3.8.6.3) include a requirement to verify electrolyte level in the connected cells every 31 days consistent with IEEE-450. The NUREG-1432 Bases for TS 3.8.6 state that the battery parameters satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). Based on the MP2 FSAR, it appears that electrolyte level is checked, however, this parameter is not included as a TS requirement. Please discuss what provisions are currently provided in plant procedures to check electrolyte level in connected cells (i.e., consistent with FSAR) and discuss why an SR to verify electrolyte level in each connected cell is not required.
- 2) Notes (b) and (c) in proposed TS Tables 4.8-1 and 4.8-2 indicate that the float battery charging current is < 5 amps. Is this value consistent with the value of actual readings when the battery is on float? What are the battery capacities in ampere-hours?
ATTACHMENT
- 3) Note (c) in proposed TS Tables 4.8-1 and 4.8-2 states that:
A battery charging current of < 5 amps when on float charge is acceptable for meeting specific gravity limits following a battery recharge, for a maximum of 7 days. When charging current is used to satisfy specific gravity requirements, specific gravity of each connected cell shall be measured prior to expiration of the 7 day allowance.
Attachment 1, page 6 of the submittal dated August 12, 2002, states that the 7 day frequency is consistent with IEEE-450-1980, as well as vendor recommendations. Please advise what section of IEEE-450-1980 is referenced when discussing the 7 day frequency.
- 4) With respect to the battery service test and performance test, please provide profiles that show the load in amps versus time for each step in the tests.
- 5) Please provide the expected sequence of battery loading for the first minute following a loss of AC power (i.e. loads versus time in seconds).