ML023020155

From kanterella
Jump to navigation Jump to search
Radiological Emergency Response Plan Implementing Procedures
ML023020155
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 10/22/2002
From: Webb T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
-RFPFR, NRC-02-097
Download: ML023020155 (18)


Text

Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, W1 54216-9511 Two Rivers, Wl 54241 NMC Committed to Nuclear Excelleif'>

920 388 2560 920.755 2321 Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC-02-097 October 22, 2002 10 CFR 50, App. E U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Radiological Emergency Response Plan Implementing Procedures Pursuant to 10 CFR 50 Appendix E, attached is the latest revisions to the Kewaunee Nuclear Power Plant Radiological Emergency Response Plan Implementing Procedures (EPIPs). These revised procedures supersede the previously submitted procedures.

Pursuant to 10 CFR 50.4, two additional copies of this letter and attachment are hereby submitted to the Regional Administrator, U. S. Nuclear Regulatory Commission, Region MI, Lisle, Illinois. As required, one copy of this letter and attachment is also submitted to the Kewaunee Nuclear Power Plant NRC Senior Resident Inspector.

Sincerely, Thomas J. Webb Regulatory Affairs Manager SLC Attachment cc - US NRC Senior Resident Inspector, w/attach.

US NRC, Region III (2 copies), w/attach.

Electric Division, PSCW, w/o attach.

QA Vault, wo/attach. " -s5

DOCUMENT TRANSMITTAL KEWAUNEE NUCLEAR POWVER PLANT FROM: DIANE FENCL - KNPP TRANSMITTAL DATE 10-17-2002 EMERGENCY PLAN IMPLEMENTING PROCEDURES TRANSMITTAL FORM COPIES (1-20)

OUTSIDE AGENCY TWebb - NRC Document Control Desk (1Q)*

T* Krista Kappelman - PBNP - EP (10)*

-WebbCraig Weiss - Alliant Energy (11)*

T. Webb - NRC Resident Inspector (4) (receives Appx. A phone numbers)*

T. Webb - State of Wisconsin (5)* . Jill Stern - Nuclear Management Company (12)*

T. Webb - KNPP QA Vault (NRC Letter & Memo Only) (15)*

PERSONAL COPIES (21-40) These copies are for the personal use of the listed individuals for reference or emergency response.

J. Bennett (33) D. Seeb'art (24) J. Ferris (13) T. Coutu (28)

REFERENCE COPIES - CUSTODIAN (41-100) These copies are for general reference by anyone. They are distributed throughout the plant and corporate offices. The named individual is the responsible custodian for the procedur'es and shall insure they are properly maintained.

NO Library - KNPP (59) Resource Center - Training (82)

C. Sternitzky - ATF-2 (44) D. Krall - CR/SS Office (51, 56)

M. Daron - Security Building (46) C. Grant - TSC (50)

C. Grant - EOF (81) WV. Galarneau - RAF (53)

C. Grant - OSF (52) W. Galarneau - SBF/EMT (54)

LOREB - STF (62, 66, 67, 68, 70, 72, 73, 74) W. Galarneau - RPO (55)

STF Library (43) STF (86, 87, 88)

WORMING COPIES (101-199) These copies of procedures are kept in the areas designated for use in response to an emergency.

W. Galarneau - RAF/RPO (106, 107) Simulator/Communicator (117)

W. Galarneau - SBF/ENV (108, 109) M. Fencl - Security (121)

W. Galarneau - SBF/EM Team (110, 111, l1lA) M. Kuether - Security Building (120)

W. Flint - Cold ChemiHR Sample Room (113) Ops Admin. (126)

M. Kuether - SBF/SEC (114) C. Crant T-EC rep.n. . BUinder(rt,*b.ti D.....)

D. Krall - CR/Communicator (11 6 )(Partial Distribution) C. 6:au1t - EOFI lpujus 1.."..(.. .... l..........

Originals to KNPP QA Vault Please follow the directions when updating your EPIP Manual. WATCH FOR DELETIONS!!! These are controlled procedures and random checks may be made to ensure the manuals are kept up-to-date.

    • THISIS NOT A CONTROLLED COPY. ITIS A COPYFOR INFORMATION ONLY.

I

KEWAUNEE NUCLEAR POWER PLANT REVISION OF EMERGENCY PLAN IMPLEMENTING PROCEDURES 2 October 17, 2002 Please follow the directions listed below. If you have any questions regarding changes made to the EPIPs, please contact Dave Seebart at ext. 8719.

EPIP Index, dated 10-17-2002.

_-, REMOVE .1 - NSERT

,PROCEDURE'E E., REV.

EPIP-RET-04 S. -EPIP-RET-04 T

- - r I CERTIFY Copy No. (WPSC No.) of the Kewaunee Nuclear Power Plant's EPIPs has been updated.

SIGNATURE - DATE Please return this sheet to DIANE FENCE Diane Fencl Enclosure 2

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 10-17-2002 PROC. NO. TITLE REV. DATE EP-AD EPIP-AD-01 Personnel Response to the Plant Emergency 1 01-08-2002 Siren EPIP-AD-02 Emergency Class Determination AD 07-19-2002 EPIP-AD-03 KNPP Response to an Unusual Event AF 06-20-2002 EPIP-AD-04 KNPP Response to Alert or Higher AK 08-20-2002 EP-AD-5 Site Emergency Deleted 04-27-87 EPIP-AD-05 Emergency Response Organization Shift Relief D 05-09-2002 Guideline EP-AD-6 General Emergency Deleted 04-24-87 EPIP-AD-07 Initial Emergency Notifications AR 06-20-2002 EP-AD-8 Notification of Alert or Higher Deleted 02-26-96 EP-AD-9 Notification of Site Emergency Deleted 04-27-87 EP-AD-10 Notification of General Emergency Deleted 04-27-87 EPIP-AD-1 1 Emergency Radiation Controls R 04-11-2002 EP-AD-12 Personnel Assembly and Accountability Deleted 03-26-94 EP-AD-13 Personnel Evacuation Deleted 04-25-94 EP-AD-13A Limited Area Evacuation Deleted 03-01-83 EP-AD-13B Emergency Assembly/Evacuation Deleted 03-01-83 EP-AD-13C Site Evacuation Deleted 03-01-83 EP-AD-14 Search and Rescue Deleted 05-25-94 EPIP-AD-15 Recovery Planning and Termination P 09-12-2002 EP-AD-16 Occupational Injuries or Vehicle Accidents Deleted 03-14-97 During Emergencies EP-AD-17 Communications Deleted 03-05-84 EPIP-AD-18 Potassium Iodide Distribution P 02-27-2002 EPIP-AD-19 Protective Action Guidelines Q 11-27-2001 PAGE 1 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 10-17-2002 PROC. NO. TITLE REV. DATE EPIP-AD-20 KNPP Response to a Security Threat C 05-23-2002 EP-ENV EPIP-ENV-01 Environmental Monitoring Group Organization W 08-20-2002 and Responsibilities EPIP-ENV-02 Environmental Monitoring Team Activation X 10-02-2001 EP-ENV-3A Environmental Protection Director Actions and Deleted 09-26-84 Directives EP-ENV-3B EM Team Actions Deleted 09-26-84 EPIP-ENV-03C Dose Projection Using RASCAL Version 2.2 W 08-20-2002 Software EP-ENV-3D Revision and Control of ISODOSE II Deleted 02-14-95 EP-ENV-3E Manual Determination of X/Q Deleted 04-24-87 EP-ENV-3F Manual Determination of X/Q (Green Bay Deleted 05-30-86 Meteorological Data)

EP-ENV-3G Manual Dose Projection Calculation Deleted 06-02-89 EP-ENV-3H Protective Action Recommendations Deleted 04-13-90 EPIP-ENV-04A Portable Survey Instrument Use T 08-20-2002 EPIP-ENV-04B Air Sampling and Analysis X 08-20-2002 EP-ENV-4C Environmental Monitoring Teams Deleted 04-13-90 EPIP-ENV-04C Ground Deposition Sampling and Analysis X 08-20-2002 EPIP-ENV-04D Plume Tracking for Environmental Monitoring 0 08-20-2002 Teams EP-ENV-5A LCS-1 Operation Deleted 04-14-86 EP-ENV-5B MS-3 Operation Deleted 04-14-86 EP-ENV-5C SAM IIOperation Deleted 04-14-86 EP-ENV-5D PAC-4G (Alpha Counter) Operation Deleted 04-14-86 EP-ENV-5E Reuter-Stokes Operation Deleted 08-27-85 PAGE 2 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 10-17-2002 PROC. NO. TITLE REV. DATE EP-ENV-6 Data Analysis, Dose Projections and Protective Deleted 12-21-81 Action Recommendations EP-ENV-6 Alternate Sample Analysis and Relocation of Deleted 04-14-86 EM Team EP-ENV-6A Relocation of Site Access Facility (Habitability) Deleted 03-23-84 EP-ENV-6B SAF Environmental Sample Analysis Relocation Deleted 03-23-84 EP-ENV-7 Site Access Facility Communications Deleted 09-26-84 EP-ENV-8 Total Population Dose Estimate Calculations Deleted 04-14-86 EP-EOF EP-EOF-1 Corporate Emergency Response Organization Deleted 03-11-94 EPIP-EOF-02 Emergency Operations Facility (EOF) Activation AA 08-06-2002 EPIP-EOF-03 EOF Staff Action for Unusual Event AC 02-06-2002 EPIP-EOF-04 EOF Staff Action for Alert or Higher AJ 08-06-2002 EP-EOF-5 Corporate Staff Action for Site Emergency Deleted 04-24-87 EP-EOF-6 Corporate Staff Action for General Emergency Deleted 04-24-87 EP-EOF-7 Notification of Unusual Event Deleted 04-06-94 EP-EOF-8 Relocation of EOF Deleted 03-01-83 EPIP-EOF-08 Continuing Emergency Notifications X 06-20-2002 EP-EOF-9 Interface with Support Organizations Deleted 03-05-84 EP-EOF-9 Notification of Site Emergency Deleted 04-24-87 EP-EOF-10 Notification of General Emergency Deleted 04-24-87 EPIP-EOF-1 1 Internal Communication and Documentation U 11-15-2001 Flow EPIP-EOF-12 Media Center/Emergency Operation Q 06-20-2002 Facility/Joint Public Information Center Security PAGE 3 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 10-17-2002 PROC. NO. TITLE REV. DATE EP-OP EP-OP-1 Control Room Emergency Organization Deleted 04-24-87 EP-OP-2 Emergency Control Room Activation for Deleted 04-24-87 Emergency Response EP-OP-3 Control Room Communications Deleted 04-24-87 EP-OSF EP-OSF-1 Operation Support Facility Emergency Deleted 04-24-87 Organization EPIP-OSF-02 Operational Support Facility Operations U 02-06-2002 EPIP-OSF-03 Work Orders During an Emergency P 05-09-2002 EP-OSF-4 Operational Support Facility Communications Deleted 04-24-87 EPIP-OSF-04 Search and Rescue E 05-23-2002 EP-RET EP-RET-I Radiation Emergency Team Organization Deleted 04-16-96 EPIP-RET-02 In-Plant Radiation Emergency Team V 05-23-2002 EPIP-RET-02A Radiation Protection Office/Radiological T 11-29-2001 Analysis Facility (RPO/RAF) Activation EPIP-RET-02B Gaseous Effluent Release Path, Radioactivity, S 08-06-2002 and Release Rate Determination EP-RET-2C Containment Air Sampling and Analysis Deleted 03-01-83 EPIP-RET-02D Emergency Radiation Entry Controls and M 06-12-2001 Implementation EP-RET-2E Handling of Injured Personnel Deleted 04-16-96 EP-RET-2F Personnel Decontamination Deleted 04-13-90 EPIP-RET-03 Chemistry Emergency Team 0 02-01-2000 EPIP-RET-03A Liquid Effluent Release Paths L 11-29-2001 EP-RET-3B Post-Accident Reactor Coolant Alternate Deleted 01-25-88 I

Sampling Procedure PAGE 4 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 10-17-2002 PROC. NO. TITLE REV. DATE EPIP-RET-03C Post Accident Operation of the High Radiation P 01-15-2002 Sample Room EPIP-RET-03D Containment Air Sampling Analysis Using N 01-15-2002 CASP EP-RET-3E Post Accident Operation of High Rad Sample Deleted 08-27-85 Room Inline Multiported Count Cave EPIP-RET-04 SBF Activation T 10-17-2002 EP-RET-4A EOF Radiological Monitoring Deleted 03-10-83 EPIP-RET-04A SBF Operation/Relocation Deleted 10-02-2001 EP-RET-4B Radiological Controls at Site Access Facility Deleted 07-12-94 EP-RET-4C Site Radiological Monitoring Deleted 07-12-94 EP-RET-4D SAM-Il Operation Deleted 07-12-94 EP-RET-5 Plume Projection Deleted 09-26-84 EPIP-RET-05 Site Boundary Dose Rates During Controlled H 10-09-2001 Plant Cooldown EP-RET-5A Plume Projection Deleted 04-27-87 EP-RET-6 Dose Projection Deleted 04-24-87 EP-RET-7 Radiological Analysis Facility/Radiation Deleted 04-24-87 Protection Office Communications EPIP-RET-08 Contamination Control of the Aurora Medical Deleted 05-23-2002 Center EPIP-RET-09 Post-Accident Population Dose L 04-16-2002 EP-SEC EP-SEC-1 Security Organization Deleted 04-24-87 EPIP-SEC-02 Security Force Response to Emergencies X 02-06-2002 EP-SEC-2A Manual Activation of Emergency Sirens Deleted 04-16-82 EPIP-SEC-03 Personnel Assembly and Accountability AE 07-19-2002 EPIP-SEC-04 Security Force Actions for Dosimetry Issue P 10-02-2001 PAGE 5 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 10-17-2002 PROC. NO. TITLE REV. DATE EP-SEC-5 Security Force Response to the EOF Deleted 07-28-88 EPIP-SEC-05 Personnel Evacuation G 06-20-2002 EP-TSC EPIP-TSC-01 Technical Support Center Organization and R 08-06-2002 Responsibilities EPIP-TSC-02 Technical Support Center Activation T 02-06-2002 EPIP-TSC-03 Plant Status Procedure V 10-09-2001 EPIP-TSC-04 Emergency Physical Changes, Major Equipment N 05-09-2002 Repair EP-TSC-5 Technical Support Center Communications Deleted 04-24-87 Equipment EP-TSC-6 Assessment of Reactor Core Damage Deleted 09-30-86 EPIP-TSC-07 RV Head Venting Time Calculation J 06-20-2002 EPIP-TSC-08A Calculations for Steam Release from Steam N 12-14-2001 Generators EPIP-TSC-08B* STMRLS Computer Program G 06-20-2002 EP-TSC-8C* See EP-TSC-8B Deleted 04-16-92

  • EP-TSC-8B was totally deleted; therefore, EP-TSC-8C was changed to EP-TSC-8B EP-TSC-9 Core Damage Assessment Using Released Deleted 09-30-86 Radionuclides EPIP-TSC-09A* Core Damage Assessment J 05-16-2002 EPIP-TSC-09B* CORE Computer Program Deleted 05-16-2002 EP-TSC-9C* See EP-TSC-9B Deleted 04-16-92

EPIP-TSC-10 ( Technical Support for IPEOPs K 05-09-2002 PAGE 6 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 10-17-2002 FIGURES EPIP FIG # Figure EPIPFG DESCRIPTION REV. DATE EP-SEC-5 Technical Support EPIP-APPX-A-06 EP-IG-003 APPX-A-06-03 Center - KNP Floor Plan B 06-12-2001 Site Boundary Facility EPIP-APPX-A-06 EP-FIG-005 APPX-A-06-02 KNP Floor Plan A 10-31-2000 Radiological Analysis Facility - KNP Floor EPIP-APPX-A-06 EP-FIG-oo8 APPX-A-06-01 Plan A 10-31-2000 EPIP-EOF-12 Division Office Building Form EPIPF-EOF-02-01 E*-FIG-009 EOF-12-01 (2nd Floor) Floor Plan B 10-24-2000 State/County Work Area - WPSC D2-1 EPIP-APPX-A-06 EP-FIG-012 APPX-A-06-08 Floor Plan C 10-31-2000 NRC Work Area EPIP-APPX-A-06 EP-FIG-013 APPX-A-06-09 WPSC D2-4 Floor Plan A 10-31-2000 Population Distribution by Geographical Sub EPIP-AD-19 EP-FIG-014 AD-19-01 Areas (with sectors) A 10-31-2000 EOF - WPSC D2-3 EPIP-APPX-A-06 EP-IG-022 APPX-A-06-04 Floor Plan C 10-30-2001 Location of JPIC and Media Briefing Center EPIP-EOF-12 EP-FIG-024 EOF-12-02 Map C 06-20-2002 KNP Site Map &

EP-SEC-5 EP-FIG-026 SEC-05-01 Evacuation Routes C 06-20-2002 Floor Plan - Media APPX-A-6 EP-FIG-034 --- Briefing Center Deleted 08-04-98 General Office EPIP-EOF-12 Building - WPSC (Ist EPIP-APPX-A-06 EP-FIG-o35 APPX-A-06-06 Floor) Floor Plan C 10-24-2000 Floor Plan - Corporate APPX-A-6 EP-FIG-037 --- Response Center Deleted 08-04-98 APPX-A-6 EP-FIG-038 - -- Floor Plan - JPIC Deleted 08-04-98 EPIP-OSF-02 EP-FIG-039 OSF-02-01 High Priority Work A 10-02-2001 EPIP-OSF-02 EP-FIG-039A OSF-02-02 Lower Priority Work A 10-02-2001 JPIC - Federal Work EPIP-APPX-A-06 EP-FIG-o43 APPX-A-06-10 Area - WPSC D2-9 B 12-21-2001 JPIC - State and County Work Area EPIP-APPX-A-06 EP-FIG-044 APPX-A-06-07 WPSC D2-8 C 12-21-2001 JPIC - Utility Work EPIP-APPX-A-06 EP-FIG-045 APPX-A-06-05 Area - WPSC D2-7 C 12-21-2001 Aurora Medical Center RET-08 EP-FIG-046 RET-08-01 Location Deleted 05-23-2002 EPIP-APPX-A-02 --- APPX-A-02-01 ERO Call Tree Deleted 12-04-2001 PAGE 7 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES

""T1,'bl n A *o lni V'. _"

.LL

  • JLJ.l*2]k Jo6."kln.LlJ- Lt -*I ,4a NUMBER TITLE REVISION DATE APPENDIX A APPX-A-1 Communication System Description AF 08-04-98 EPIP-APPX-A-02 Response Personnel Call List Deleted 02-06-2002 EPIP-APPX-A-03 Off-Site Telephone Numbers Deleted 02-06-2002 EPIP-APPX-A-06 KNPP Emergency Response Facility Telephone AA 12-21-2001 Numbers PAGE 8 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 10-17-2002 FORM EPIPF TITLE REV. DATE APPENDIX B EP-AD AD-07-01 Event Notice (Wisconsin Nuclear Accident Reporting Form) S 05-23-2002 AD-07-02 State Call-Back - Question Guideline C 11-15-2001 AD-11-01 Emergency Radiation Work Permit G 04-11-2002 AD-18-01 Airborne Radioiodine Dose Accountability and Potassium B 08-06-2002 Iodide Distribution AD-18-02 Record of Known Allergy To or Voluntary Refusal to A 02-27-2002 Take Potassium Iodide EP-ENV ENV-01-01 Environmental Dispatch Area Activation Checklist D 10-31-2000 ENV-01-02 EMT Status B 10-31-2000 ENV-01-03 Meteorological and Plant Status Data C 12-14-2001 ENV-01-04 EMT Orders/Field Data B 10-31-2000 ENV-02-01 EMT Activation Checklist N 08-20-2002 EP-EOF EOF-02-01 EOF Activation Checklist T 08-06-2002 EOF-02-02 EOF Deactivation Checklist M 08-06-2002 EOF-04-01 SRCL Initial Action Checklist C 12-14-2001 EOF-04-02 Telephone Communications Log Sheet A 12-14-2001 EOF-08-03 Fax for Emergency Declaration or Status Updates G 11-27-2001 EOF-08-05 Plant Emergency Status Report A 11-27-2001 EOF-08-06 Radiological Status Report D 11-27-2001 EOF-1 1-02 Operating Status F 11-15-2001 EOF- 1-03 Environmental Status Board F 11-15-2001 EOF-12-01 I.D. Badge Registration Form G 10-24-2000 PAGE 9 OF 11

I- -

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 10-17-2002 FORM EPIPF TITLE REV. DATE EP-OSF OSF 2.2 Maintenance Work in Progress Deleted 07-08-98 OSF-03-01 Operational Support Facility Team Briefing C 12-04-2001 EP-RET RET-02A-02 Emergency Sample Worksheet E 06-05-2001 RET-02B-01 Containment Stack Release (Grab Sample) D 08-06-2002 RET-02B-02 Auxiliary Building Stack (Grab Sample) D 08-06-2002 RET-02B-03 Auxiliary Building Stack (Sping Reading) D 08-06-2002 RET-02B-04 Containment Stack (Sping Reading) C 08-06-2002 RET-02B-05 Steam Release D 08-06-2002 RET-02B-06 Field Reading (Grab Sample) B 08-06-2002 RET-04-01 SAM-2 Counting Equipment Worksheet E 06-12-2001 RET 8.3 Hospital Survey I Deleted 06-05-2001 RET 8.4 Hospital Survey 2 Deleted 07-25-97 RET 8.5 Hospital Survey 3 Deleted 07-25-97 RET-08-06 Hospital Survey 4 Deleted 05-23-2002 RET-09-01 Post-Accident TLD Record Sheet D 04-16-2002 EP-SEC SEC-03.01 Emergency Accountability Log A 03-28-2000 SEC-04-01 Emergency Dosimeter Log G 06-20-2002 EP-TSC TSC-01.01 Plant Status Summary for SAM Implementation B 02-06-2002 TSC-01.02 Severe Accident Management Summary and Strategy B 02-06-2002 Recommendation TSC-01.03 Severe Accident Management - Status B 02-06-2002 TSC-02-01 TSC and OSF Activation Checklist 0 09-27-2001 PAGE 10 OF 11

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE: 10-17-2002 FORM EPIPF TITLE REV. DATE TSC 2.2 TSC Ventilation Checklist H 04-01-99 TSC-02-03 Emergency Response Data System (ERDS) Link Initiation G 05-04-2001 Checklist TSC-02-04 TSC Chart Recorder Operation Checklist D 01-30-2001 TSC-02-05 TSC and OSF De-activation Checklist A 10-09-2001 TSC-03-01 Plant System Status L 06-12-2001 TSC-03-02 Plant Equipment Status L 06-12-2001 TSC-03-03 Environmental Status Board J 06-12-2001 TSC-03-04 Radiation Monitors I 01-08-2002 TSC-04-01 Emergency Physical Change Request G 05-09-2002 TSC-04-02 Emergency Physical Change Safety Review Deleted 05-09-2002 TSC-04-03 Emergency Physical Change Index F 08-29-2000 TSC-07-01 Head Venting Calculation G 06-20-2002 TSC-08A-01 Steam Release Data Sheet (Energy Balance) H 12-14-2001 TSC-08A-02 Steam Release Calculation Sheet (Energy Balance) G 12-14-2001 TSC-08A-03 Steam Release Data/Calculation Sheet (Open Valve) E 12-14-2001 TSC-08A-04 Steam Release Data/Calculation Sheet (STMRLIS D 12-14-2001 Program)

TSC-09A-01 Core Exit Thermocouple Data D 05-16-2002 TSC-09A-02 Fuel Rod Clad Damage Estimate D 05-16-2002 TSC-09A-03 Fuel Rod Overtemperature Damage Estimate E 05-16-2002 TSC 9A.4 Core Damage Based on Activity Ratios Deleted 05-16-2002 TSC-09A-05 Core Damage Assessment (Monitoring Data) E 05-16-2002 TSC 9A.6 Core Damage Summary Deleted 05-16-2002 PAGE 11 OF 11

4l-WISCONSIN PUBLICSERVICE CORP.. No. EPIP-RET-04Rev. T Title SBF Activation Nuclear Power Plarnti?

Penting Date OCT 172002 Page 1 of 4 merxeeiiy)a 1'Plee-nni, roceu'- Dte20 Reviewed By Wayne Galameau Approved By W. L. Yarosz Nuler 3 esPOC:13Ye SRO Approval Of 13 Yes Safety ReviewTepry Related El No Required El No Changes Required E[]No 1.0 Purpose 1.1 This procedure provides instruction for the steps to be taken to fully activate the Site Boundary Facility (SBF).

2.0 General Notes 2.1 None 3.0 Precautions and Limitations 3.1 None 4.0 Initial Conditions 4.1 The Environmental Monitoring Team (EMT) has been activated.

5.0 Procedure 5.1 Site Boundary Facility (SBF) Coordinator 5.1.1 At the declaration of an Alert or higher, the first available Radiation Protection Technologist in the Radiation Protection Office/Radiological Assessment Facility (RPO/RAF) will perform the following activities to activate the SBF:

1. Obtain the keys to the facility doors and cabinets from the RPO.
2. Take copies of the current crew dose and deliver to the EMTs.
3. Report to the SBF and open the facility.
4. Assume the duties of the Site Boundary Facility Coordinator.
5. Activate the SBF as described below.

5.2 Facility Activation 5.2.1 Source check the portable suirvey instrument.

5.2.2 Perform background and efficiency checks on the counting equipment and record on

\ f,' appropriate counting worksheets.

n:\nucdoc\procedures\draft~epip\eretO4.doc-ChrisUne Simmons/Christine Simmons-Jeanne Ferris REFERENCE USE

5.2.3 Set up the PPM-I Portal Monitor in accordance with HP-06.085, "Instrument Operating Procedure - PPM-I Portable Personnel Monitor."

5.2.4 Perform radiation and contamination surveys at the SBF to establish base line radiological conditions.

5.2.5 Assist the Emergency Monitoring Teams with set-up or replacement of instrumentation as requested.

5.2.6 Notify the Radiation Protection Director (RPD) that the SBF is activated.

5.2.7 IF conditions change, THEN update the RPD with the status of radiological conditions at the SBF.

Note The SAM-2 is used as a back-up counting system (single channelanalyzer) in case the MCA in the plant is NOT operable orsilver zeolite cartridgescan NOT be counted by MCA at the PointBeach NuclearPlant to determine Iodine-131 concentrations.

5.2.8 The SAM-2 is maintained in a "powered-up" and "ready-to-go" condition at all times with only the display turned off. (If this is NOT the case, THEN set up the SAM-2 in accordance with lP-06.007, "Instrument Operating Procedure - SAM-2.")

5.2.9 If needed, use the SAM-2 to determine Iodine-131 concentrations.

5.3 Dosimetry 5.3.1 IF arriving ERO personnel do NOT have plant issued dosimetry, THEN issue emergency dosimetry stored in the SBF.

5.3.2 For EMT members that will monitor the plume, direct them to read their dosimeters as follows:

5.3.2.1 IF a release occurs OR is in progress, THEN read dosimeters at a minimum of every 15 minutes, more often as radiation levels dictate.

5.3.2.2 Advise the RPO/RAF (or Emergency Operations Facility (EOF) when activated) of dosimeter readings every hour OR when 100 mrem is accumulated.

5.3.3 Instruct personnel remaining in the SBF to perform the following:

1. Periodically monitor their Self Reading Dosimeters (SRDs).
2. Report dose readings of 100 mrem to the SFB Coordinator.
3. IF the dosimeter reads 3/4 scale or greater, THEN have the dosimeter re-zeroed by the SBF Coordinator.

REFERENCE USE

T*

-~- Isc1 S U1 No. EPIP-RET-04 Rev. T

  • * **,*..*:*.:* .... ,,,-,-*,,*-.*,*--. *.:;,ITitle SBF Activation
  • *,~Kewaunee Nuclear Power IPlanht '2; Z:'Emergncy IPlaniImpleentg nProcidure . Date OCT 17 2002 Page 3 of
4. Log the dose on Form EPIPF-SEC-04-01 "Emergency Dosimetry Log Security."
5. Report dose increments of 100 mrem to the RPD.

5.4 SBF Radiation Surveys 5.4.1 If the SBF should become contaminated, then follow normal RP procedures to prevent the spread of contamination.

5.4.2 IF advised that a release is in progress ORnhas occurred, THEN perform radiation surveys of the SBF.

5.4.3 Advise the RPD immediately of elevated radiation or contamination readings in the SBF.

5.5 SBF Relocation 5.5.1 IF the SBF becomes uninhabitable OR ineffective due to radiation levels or contamination, THEN contact the ED or RPD and consider relocation of the SBF.

5.5.2 If relocation is deemed necessary, then determine the new location of the SBF.

5.5.3 Collect the following and move it to the new SBF location:

  • All Portable Instruments
  • Status Board Sheets 9 Radios and associated equipment
  • Phone lists e Calculator e Step-off Pads
  • Rad Bags 9 Lab coats

. Gloves

  • Shoe covers REFERENCE USE

5.5.4 Report to the new location.

5.5.5 Set up instruments and radiological controls.

5.5.6 Inform the RPD when the SBF has been relocated and re-established.

6.0 Final Conditions 6.1 Plant Emergency has been Terminated or Recovery actions have begun and the Emergency Response Manager has suspended the use of EPIPs.

7.0 References 7.1 EPIP-AD-04, KNPP Response to Alert or Higher 7.2 HP-06.007, Instrument Operating Procedure - SAM-2 7.3 HP-06.085, Instrument Operating Procedure - PPM-1 Portable Personnel Monitor 8.0 Records 8.1 The following QA records and non-QA records are identified in this directive/procedure and are listed on the KNPP Records Retention Schedule. These records shall be maintained according to the KNPP Records Management Program.

8.1.1 QA Records

  • Counting System Worksheet, Form I-IPF-100 (i.e., MS-3) 0 SAM-2 Counting Equipment Worksheet, Form EPIPF-RET-04-01
  • Emergency Dosimetry Log Security, Form EPIPF-SEC-04-01 8.1.2 Non-QA Records None REFERENCE USE