ML022980340

From kanterella
Jump to navigation Jump to search
Hydroelectric Project Main Dam/Spillway Preventive Maintenance Schedule Advance Notification for 2002
ML022980340
Person / Time
Site: North Anna  
Issue date: 05/16/2002
From: Heacock D
Dominion Generation
To: Gotzmer J
Office of Nuclear Reactor Regulation, US Dept of Energy, Federal Energy Regulatory Commission (FERC)
References
F02-002
Download: ML022980340 (3)


Text

David A. Heacock Site Vice Presidenr Dominion Generation North Anna Powcr Station P.O. Box 402, Mineral, VA 23117 Phone: 540-894-2101, Fax: 540-894-2878 David_ Hcacock@donm.com May 16, 2002 Mr. Jerrold W. Gotzmer - Director Federal Energy Regulatory Commission Atlanta Regional Office, Parkridge 85 North Building 3125 Presidential Parkway, Suite 300 Atlanta, Georgia 30340 Serial No. F02-002

Dear Mr. Gotzmer:

PROJECT NO. P-6335-VAI NATDAM NO. VA83005 NORTH ANNA HYDROELECTRIC PROJECT MAIN DAM/SPILLWAY PREVENTIVE MAINTENANCE SCHEDULE ADVANCE NOTIFICATION FOR 2002 In the FERC letter, dated February 22, 2000, addressing a summary of requirements in Parts 8 and 12 of the FERC's Regulations, a 10 day notification to FERC is required in advance of plans to remove any public safety device.

For those devices routinely removed annually, a one-time notification providing the reason and schedule for periodic removal and reinstallation is acceptable.

Accordingly, preventive maintenance for the main dam/spillway has been scheduled for 2002. Preventive maintenance will be performed on the radial gates, skimmer gates, hydro unit, hydro generator battery bank, and the emergency diesel generator. The scope of maintenance and the tentative schedule are summarized in Attachment 1.

This letter serves as the pre-work notification for the scheduled maintenance activities.

The dates listed are target dates and may change slightly based an maintenance activities. You will be notified of any significant deviations from this schedule.

Please contact Michael P. Whalen concerning this submittal.

at (540) 894-2572, should you have any questions Very truly yours, D. A. Heacock Site Vice President Attachment Commitments contained in this letter: None DominiOn"

cc:.- U.-S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center Suite 23T85 61 Forsyth St., S.W.

Atlanta, Georgia 30303-8931 Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station

Main Dam/Spillway PM Schedule Advance Notification For 2002 Serial No. F02-002 PREVENTIVE MAINTENANCE SCOPE FOR 2002 Spillway Radial Gates I-SP-RG-1A, 1B, and 1C Inspect and lubricate gear reducer, motor drive, radial gates and perform associated post maintenance testing.

1-SP-RG-1A 1-SP-RG-1B 1-SP-RG-1C June 19, 2002 through June 26, 2002 June 26, 2002 through July 3, 2002 July 3, 2002 through July 10, 2002 Spillway Skimmer Gates I-SP-MOV-GATE 1 and 2 Inspect gates, lubricate gates, inspect motor operated valves, and associated post maintenance testing.

1-SP-SG-1A 1-SP-SG-1B June 10, 2002 through June 14, 2002 June 12, 2002 through June 16, 2002 Hydro Units 5-EP-EG-5A and 5B Clean and inspect hydro units, perform building lighting inspections, apply lubrication, change oil, clean motors, inspect hydraulic actuator system, and perform associated post maintenance testing.

5-EP-EG-1 5-EP-EG-2 June 11, 2002 through June 12, 2002 through June 15, 2002 June 16, 2002 Hydro Unit Generator Battery Bank 5-BY-B-SW Clean and inspect Battery charger.

  • 5-BY-BC-1 June 11, 2002 through June 15, 2002 Emergency Diesel Generator 1-EE-EG-4 Preventive maintenance including fluid/oil and filter change outs, service batteries as appropriate, clean and inspect voltage regulator and emergency generator, and perform associated post maintenance testing.

June 17, 2002 through June 21, 2002 0

0 perform 1-EE-EG-4