MONTHYEARGO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000397/20230122023-11-20020 November 2023 Commercial Grade Dedication Inspection Report 05000397/2023012 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000397/20230102023-11-0909 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000397/2023010 IR 05000397/20230932023-11-0101 November 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023093 ML23299A2072023-10-26026 October 2023 Biennial Requalification Inspection Request for Information IR 05000397/20230032023-10-25025 October 2023 Integrated Inspection Report 05000397/2023003 IR 05000397/20230112023-10-0404 October 2023 License Renewal Phase 2 Report 05000397/2023011 IR 05000397/20234012023-09-11011 September 2023 Security Baseline Inspection Report 05000397/2023401 GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) ML24032A2182023-09-0101 September 2023 Information Request, Security IR 2024401 GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000397/20230052023-08-22022 August 2023 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2023005) - Mid Year Letter IR 05000397/20230022023-08-0101 August 2023 Integrated Inspection Report 05000397/2023002 GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 ML23206A2442023-07-25025 July 2023 Energy Northwest Columbia Generating Station, Response to Apparent Violation in NRC Inspection Report 05000397/2023092; EA-23-054 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation ML23143A1202023-06-27027 June 2023 Request Number 4ISI-11 to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Regarding Alternate Examination of Reactor Vessel Welds GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance ML23163A2502023-06-12012 June 2023 Summary of Changes and Analysis for Revision 41 of Plant Procedures Manual 13.8.1 Emergency Dose Projection System Operations GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report ML23157A2702023-06-0101 June 2023 4-2022-011 -022 Letter - OI Closure to Licensee IR 05000397/20230922023-06-0101 June 2023 NRC Inspection Report 05000397/2023092 and Preliminary White Finding IR 05000397/20230902023-06-0101 June 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023090 GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report IR 05000397/20230012023-05-0505 May 2023 Integrated Inspection Report 05000397/2023001 - April 26, 2023 GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications IR 05000397/20233012023-05-0101 May 2023 NRC Examination Report 05000397/2023301 GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 2024-01-08
[Table view] |
Text
October 22, 2002 Mr. Douglas E. McKinley 1100 Jadwin, Suite 250 Richland, WA 99352
Dear Mr. McKinley:
I am responding to your letter dated June 25, 2002, to Mr. Gary Sanborn of the U.S. Nuclear Regulatory Commissions (NRCs) Region IV office. You requested that the NRC confirm that there are no current NRC regulations prohibiting your planned development of the WNP-1 and WNP-4 sites.
The NRC regulations do not directly prohibit such development. However, the Energy Northwest Updated Final Safety Analysis Report (UFSAR) for the Columbia Generating Station (CGS) discusses the WNP-1 and WNP-4 sites. Energy Northwest is required by NRC regulations to meet their UFSAR.
Energy Northwest can revise or request a revision to their UFSAR to address any potential hazards the planned industry would have on the operating plant to protect the health and safety of the public. The extent of NRC involvement in that process will depend on the type and extent of any changes that Energy Northwest proposes to the UFSAR.
I have contacted the Department of Energy representative at the Hanford Site, and we are both in agreement that it is up to the Composite Power Corporation to contact Energy Northwest, communicate its plans and coordinate with Energy Northwest on any changes to the CGS UFSAR that may be required. If you have any questions or comments regarding these matters, please call me at 1-301-415-3764.
Sincerely,
/RA/
Brian Benney, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation cc: See next page
October 22, 2002 Mr. Douglas E. McKinley 1100 Jadwin, Suite 250 Richland, WA 99352
Dear Mr. McKinley:
I am responding to your letter dated June 25, 2002, to Mr. Gary Sanborn of the U.S. Nuclear Regulatory Commissions (NRCs) Region IV office. You requested that the NRC confirm that there are no current NRC regulations prohibiting your planned development of the WNP-1 and WNP-4 sites.
The NRC regulations do not directly prohibit such development. However, the Energy Northwest Updated Final Safety Analysis Report (UFSAR) for the Columbia Generating Station (CGS) discusses the WNP-1 and WNP-4 sites. Energy Northwest is required by NRC regulations to meet their UFSAR.
Energy Northwest can revise or request a revision to their UFSAR to address any potential hazards the planned industry would have on the operating plant to protect the health and safety of the public. The extent of NRC involvement in that process will depend on the type and extent of any changes that Energy Northwest proposes to the UFSAR.
I have contacted the Department of Energy representative at the Hanford Site, and we are both in agreement that it is up to the Composite Power Corporation to contact Energy Northwest, communicate its plans and coordinate with Energy Northwest on any changes to the CGS UFSAR that may be required. If you have any questions or comments regarding these matters, please call me at 1-301-415-3764.
Sincerely, Brian Benney, Project Manager, Section 2 Project Directorate IV /RA/
Division of Licensing Project Management Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION:
PUBLIC PDIV-2 Reading RidsNrrDlpmLpdiv (WRuland)
RidsNrrPMBBenney RidsNrrLAEPeyton RidsRegionIVMailCenter (GSanborn)
BJones, Region IV RidsOgcRp *For previous concurrences see attached ORC ACCESSION NO.: ML OFFICE PDIV-2/PM PDIV-2/LA OGC* PDIV-2/SC NAME BBenney:rkb EPeyton SUttal (NLO) SDembek DATE 10/16/02 10/16/02 10-11-02 10/17/02 DOCUMENT NAME: C:\ORPCheckout\FileNET\ML022950022.wpd OFFICIAL RECORD COPY
Columbia Generating Station cc:
Mr. Greg O. Smith (Mail Drop PE04) Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Generation Vice President, Operations Support/PIO Energy Northwest Energy Northwest P. O. Box 968 P. O. Box 968 Richland, WA 99352-0968 Richland, WA 99352-0968 Mr. Albert E. Mouncer (Mail Drop 1396) Thomas C. Poindexter, Esq.
Vice President, Chief Counsel Winston & Strawn Energy Northwest 1400 L Street, N.W.
P.O. Box 968 Washington, DC 20005-3502 Richland, WA 99352-0968 Mr. Bob Nichols Chairman Executive Policy Division Energy Facility Site Evaluation Council Office of the Governor P. O. Box 43172 P.O. Box 43113 Olympia, WA 98504-3172 Olympia, WA 98504-3113 Mr. D. W. Coleman (Mail Drop PE20) Ms. Lynn Albin Manager, Performance Assessment Washington State Department of Health and Regulatory Programs P.O. Box 7827 Energy Northwest Olympia, WA 98504-7827 P.O. Box 968 Richland, WA 99352-0968 Mr. J. V. Parrish Chief Executive Officer Ms. Christine Perrino (Mail Drop PE20) Energy Northwest Manager, Licensing P.O. Box 968 (Mail Drop 1023)
Energy Northwest Richland, WA 99352-0968 P.O. Box 968 Richland, WA 99352-0968 Mr. Gary Sandborn US NRC, Region IV Regional Administrator, Region IV 611 Ryan Plaza U.S. Nuclear Regulatory Commission Suite 400 Harris Tower & Pavilion Arlington, TX 76011 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Chairman Benton County Board of Commissioners P.O. Box 69 Prosser, WA 99350-0190 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 69 Richland, WA 99352-0069