ML022950022
| ML022950022 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 10/22/2002 |
| From: | Brian Benney NRC/NRR/DLPM/LPD4 |
| To: | Mckinley D - No Known Affiliation |
| Benney B, NRR/DLPM, 415-3764 | |
| References | |
| Download: ML022950022 (3) | |
Text
October 22, 2002 Mr. Douglas E. McKinley 1100 Jadwin, Suite 250 Richland, WA 99352
Dear Mr. McKinley:
I am responding to your letter dated June 25, 2002, to Mr. Gary Sanborn of the U.S. Nuclear Regulatory Commissions (NRCs) Region IV office. You requested that the NRC confirm that there are no current NRC regulations prohibiting your planned development of the WNP-1 and WNP-4 sites.
The NRC regulations do not directly prohibit such development. However, the Energy Northwest Updated Final Safety Analysis Report (UFSAR) for the Columbia Generating Station (CGS) discusses the WNP-1 and WNP-4 sites. Energy Northwest is required by NRC regulations to meet their UFSAR.
Energy Northwest can revise or request a revision to their UFSAR to address any potential hazards the planned industry would have on the operating plant to protect the health and safety of the public. The extent of NRC involvement in that process will depend on the type and extent of any changes that Energy Northwest proposes to the UFSAR.
I have contacted the Department of Energy representative at the Hanford Site, and we are both in agreement that it is up to the Composite Power Corporation to contact Energy Northwest, communicate its plans and coordinate with Energy Northwest on any changes to the CGS UFSAR that may be required. If you have any questions or comments regarding these matters, please call me at 1-301-415-3764.
Sincerely,
/RA/
Brian Benney, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation cc: See next page
October 22, 2002 Mr. Douglas E. McKinley 1100 Jadwin, Suite 250 Richland, WA 99352
Dear Mr. McKinley:
I am responding to your letter dated June 25, 2002, to Mr. Gary Sanborn of the U.S. Nuclear Regulatory Commissions (NRCs) Region IV office. You requested that the NRC confirm that there are no current NRC regulations prohibiting your planned development of the WNP-1 and WNP-4 sites.
The NRC regulations do not directly prohibit such development. However, the Energy Northwest Updated Final Safety Analysis Report (UFSAR) for the Columbia Generating Station (CGS) discusses the WNP-1 and WNP-4 sites. Energy Northwest is required by NRC regulations to meet their UFSAR.
Energy Northwest can revise or request a revision to their UFSAR to address any potential hazards the planned industry would have on the operating plant to protect the health and safety of the public. The extent of NRC involvement in that process will depend on the type and extent of any changes that Energy Northwest proposes to the UFSAR.
I have contacted the Department of Energy representative at the Hanford Site, and we are both in agreement that it is up to the Composite Power Corporation to contact Energy Northwest, communicate its plans and coordinate with Energy Northwest on any changes to the CGS UFSAR that may be required. If you have any questions or comments regarding these matters, please call me at 1-301-415-3764.
Sincerely, Brian Benney, Project Manager, Section 2 Project Directorate IV
/RA/
Division of Licensing Project Management Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION:
PUBLIC PDIV-2 Reading RidsNrrDlpmLpdiv (WRuland)
RidsNrrPMBBenney RidsNrrLAEPeyton RidsRegionIVMailCenter (GSanborn)
BJones, Region IV RidsOgcRp
- For previous concurrences see attached ORC ACCESSION NO.: ML OFFICE PDIV-2/PM PDIV-2/LA OGC*
PDIV-2/SC NAME BBenney:rkb EPeyton SUttal (NLO)
SDembek DATE 10/16/02 10/16/02 10-11-02 10/17/02 DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML022950022.wpd OFFICIAL RECORD COPY
Columbia Generating Station cc:
Mr. Greg O. Smith (Mail Drop PE04)
Vice President, Generation Energy Northwest P. O. Box 968 Richland, WA 99352-0968 Mr. Albert E. Mouncer (Mail Drop 1396)
Vice President, Chief Counsel Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Chairman Energy Facility Site Evaluation Council P. O. Box 43172 Olympia, WA 98504-3172 Mr. D. W. Coleman (Mail Drop PE20)
Manager, Performance Assessment and Regulatory Programs Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Ms. Christine Perrino (Mail Drop PE20)
Manager, Licensing Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Chairman Benton County Board of Commissioners P.O. Box 69 Prosser, WA 99350-0190 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 69 Richland, WA 99352-0069 Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Operations Support/PIO Energy Northwest P. O. Box 968 Richland, WA 99352-0968 Thomas C. Poindexter, Esq.
Winston & Strawn 1400 L Street, N.W.
Washington, DC 20005-3502 Mr. Bob Nichols Executive Policy Division Office of the Governor P.O. Box 43113 Olympia, WA 98504-3113 Ms. Lynn Albin Washington State Department of Health P.O. Box 7827 Olympia, WA 98504-7827 Mr. J. V. Parrish Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968 Mr. Gary Sandborn US NRC, Region IV 611 Ryan Plaza Suite 400 Arlington, TX 76011