ML022940466

From kanterella
Jump to navigation Jump to search
September 2002 Monthly Operating Report for Vogtle
ML022940466
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/11/2002
From: Gasser J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LCV-1593-I
Download: ML022940466 (5)


Text

Jeffrey T. Gasser Southern Nuclear Vice President Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205 992 7721 Fax 205 992 0403 October 11, 2002 Docket Nos. 5 0-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - SEPTEMBER 2002 Enclosed are the September 2002 monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with Technical Specification 5.6.4.

Sincerely, J.'T. Gasser JTG/NJS Enclosures El - VEGP Unit 1 Monthly Operating Report - September 2002 E2 - VEGP Unit 2 Monthly Operating Report - September 2002 xc: Southern Nuclear Operating Company Mr. M. Sheibani SNC Document Management U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, Licensing Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle SOUTHERN COMPANY Energy to Serve Your Worldt LCV-1 593-I

OPERATING DATA REPORT Docket No:

Unit Name Date:

Completed By*

Telephone:

50-424 VEGP UNIT 1 October 1, 2002 Andrew R Cato (706) 826-3823 Operating Status

1. Reporting Period
2. Design Electrical Rating (Net MWe) 3 Maximum Dependable Capacity (Net MWe) 4 Number Of Hours Reactor Was Critical 5 Hours Generator On Line:

6 Unit Reserve Shutdown Hours:

7. Net Electrical Energy Generated (MWHe)

September 2002 1169 1148 This Month 720 0 720 0 00 841,381 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date (YYMMDD)

Tag No Event Description N/A N/A N/A El-1 Year-To-Date 5503.0 5441.1 0.0 6,313,267 Cumulative 120,1125 118,5937 0.0 132,759,333

UNIT SHUTDOWNS Reporting Period:

Docket No:

Unit Name:

Date*

Completed By.

Telephone:

50-424 VEGP UNIT 1 October 1, 2002 Andrew R. Cato (706) 826-3823 September 2002 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No Date (YYMMDD)

S-Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON (2) METHOD.

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual 4 Continuation B - Maintenance or Test F - Administrative 2 Manual Trip/Scram 5 Other C - Refueling G - Operational Error (Explain) 3 Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS:

EVENT CAUSE*

CORRECTIVE ACTION CRITICAL PATH WAS NARRATIVE REPORT September 01 00 00 Unit 1 at 100% power with no significant operating problems September 30 23 59 Unit 1 at 100% power with no significant operating problems.

E1-2

OPERATING DATA REPORT Docket No.:

Unit Name, Date Completed By Telephone:

50-425 VEGP UNIT 2 October 1, 2002 Andrew R Cato (706) 826-3823 Operating Status

1. Reporting Period
2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe)
4. Number Of Hours Reactor Was Critical
5. Hours Generator On Une 6 Unit Reserve Shutdown Hours,
7. Net Electrical Energy Generated (MWHe)

September 2002 1169 1149 This Month 720 0 720.0 0.0 827,063 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date (YYMMDD)

Tag No.

Event Description N/A NIA N/A E2-1 Year-To-Date 6551.0 6551.0 00 7,664,767 Cumulative 107,604 8 106,791 7 00 120,457,233

UNIT SHUTDOWNS Reporting Period:

Docket No.,

Unit Name.

Date Completed By.

Teleph6ne 50-425 VEGP UNIT 2 October 1, 2002 Andrew R. Cato (706) 826-3823 September 2002 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No Date (YYMMDD)

S Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON (2) METHOD.

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain) 3 Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS:

EVENT CAUSE*

CORRECTIVE ACTION CRITICAL PATH WAS NARRATIVE REPORT September 01 00.00 Unit 2 at 100% power with no significant operating problems September 21 11:00 Unit began planned coastdown in preparation for the refueling outage.

September 30 23:59 Unit 2 at 95% power in coastdown with no significant operating problems E2-2