October 11, 2002 Mr. A. Cayia Site Vice President Point Beach Nuclear Power Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
RESCHEDULING OF EMERGENCY PREPAREDNESS SUPPLEMENTAL INSPECTION -- POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
Dear Mr. Cayia:
On October 3, 2002, we received a telephone call from Ms. Fritzie Flentje of your staff requesting that the NRC consider rescheduling the November 4, 2002 Supplemental Inspection for a White inspection finding in the emergency preparedness cornerstone that was identified during your February 12, 2002 emergency preparedness exercise. Ms. Flentje indicated that additional time was necessary to ensure that your root cause analysis of the performance issues was completed and that your staff was fully able to support our inspection. We have evaluated your staffs request and have rescheduled the inspection to the week of November 18, 2002. This change was communicated to your staff via a telephone conversation between Ms. Flentje of your staff and Mr. Kenneth Riemer and Mr. Steven Orth of mine, on October 4, 2002. If you have any questions concerning this information, please contact Mr. Orth at 630-829-9827 or Mr. Riemer at 630-829-9757.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA by Roy Caniano Acting For/
Cynthia D. Pederson, Director Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 See Attached Distribution
A. Cayia cc:
R. Grigg, President and Chief Operating Officer, WEPCo R. Anderson, Chief Nuclear Officer T. Webb, Licensing Manager D. Weaver, Nuclear Asset Manager T. Taylor, Plant Manager J. ONeill, Jr., Shaw, Pittman, Potts & Trowbridge K. Duveneck, Town Chairman Town of Two Creeks D. Graham, Director Bureau of Field Operations A. Bie, Chairperson, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer
Mr. A. Cayia Site Vice President Point Beach Nuclear Power Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
RESCHEDULING OF EMERGENCY PREPAREDNESS SUPPLEMENTAL INSPECTION -- POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
Dear Mr. Cayia:
On October 3, 2002, we received a telephone call from Ms. Fritzie Flentje of your staff requesting that the NRC consider rescheduling the November 4, 2002 Supplemental Inspection for a White inspection finding in the emergency preparedness cornerstone that was identified during your February 12, 2002 emergency preparedness exercise. Ms. Flentje indicated that additional time was necessary to ensure that your root cause analysis of the performance issues was completed and that your staff was fully able to support our inspection. We have evaluated your staffs request and have rescheduled the inspection to the week of November 18, 2002. This change was communicated to your staff via a telephone conversation between Ms. Flentje of your staff and Mr. Kenneth Riemer and Mr. Steven Orth of mine, on October 4, 2002. If you have any questions concerning this information, please contact Mr. Orth at 630-829-9827 or Mr. Riemer at 630-829-9757.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA by Roy Caniano Acting For/
Cynthia D. Pederson, Director Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 See Attached Distribution DOCUMENT NAME: G:\\DRS\\ML022900752.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII RIII RIII RIII NAME SOrth:sd KRiemer RLanksbury CPederson DATE 10/10/02 10/11/02 10/11/02 10/11/02 OFFICIAL RECORD COPY
A. Cayia cc:
R. Grigg, President and Chief Operating Officer, WEPCo R. Anderson, Chief Nuclear Officer T. Webb, Licensing Manager D. Weaver, Nuclear Asset Manager T. Taylor, Plant Manager J. ONeill, Jr., Shaw, Pittman, Potts & Trowbridge K. Duveneck, Town Chairman Town of Two Creeks D. Graham, Director Bureau of Field Operations A. Bie, Chairperson, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer ADAMS Distribution:
WDR DFT DWS RidsNrrDipmIipb GEG HBC PGK1 DRPIII DRSIII PLB1 JRK1