ML022840388

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedure (EPIP) Revision 23 to EPIP-10
ML022840388
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/08/2002
From: Abney T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
R08 021908 690
Download: ML022840388 (5)


Text

R08 021908 690 October 8, 2002 10 CFR Part 50, App E U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Gentleman:

In the Matter of

)

Docket Nos. 50-259 Tennessee Valley Authority

)

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1, 2, and 3 EMERGENCY PLAN IMPLEMENTING PROCEDURE (EPIP) REVISION TVA is submitting this notification in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V.

Specifically, EPIP-10 was revised to Revision 23. The revision has an effective date of September 30, 2002.

The enclosed information is being sent by certified mail.

The signed receipt signifies that you have received this information. If you have any questions, please telephone me at (256) 729-2636.

Sincerely, original signed by:

T. E. Abney Manager of Licensing and Industry Affairs cc: See Page 2

U.S. Nuclear Regulatory Commission Page 2 October 8, 2002 cc (Enclosure):

NRC Resident Inspector (Enclosure provided by Browns Ferry Nuclear Plant BFN Document Control Unit)

P.O. Box 149 Athens, Alabama 35611 Mr. Paul E. Fredrickson, Branch Chief (2 Enclosures)

U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street S.W., Suite 23T85 Atlanta, Georgia 30303-8931 Mr. Kahtan N. Jabbour, Senior Project Manager (w/o Enclosure)

U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)

Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738

U.S. Nuclear Regulatory Commission Page 3 October 8, 2002 DTL:JEW:BAB cc (w/o Enclosure):

T. W. Cornelius, PAB 2K-BFN B. K. Marks, LP 6B-C A. S. Bhatnagar, PAB 1E-BFN EDMS-K S/LIC/SUBMIT/OPERATOR/EPIP103002.doc

ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 EMERGENCY PLAN IMPLEMENTING PROCEDURE (EPIP) REVISION EPIP-10 SEE ATTACHED

GENERAL REVISIONS GENERIC FILING INSTRUCTIONS FILE DOCUMENTS AS FOLLOWS:

PAGES TO BE REMOVED PAGES TO BE INSERTED EPIP-10 Revision 22 EPIP-10 Revision 23