Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205 992 7110 Fax 205 992 0403 October 8, 2002 Docket Nos.:

50-348 50-364 NEL-02-0205 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Enclosed are the September 2002 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 5.6.4 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, RWC:mor

Enclosures:

1. September Monthly Operating Report for Plant Farley Unit 1
2. September Monthly Operating Report for Plant Farley Unit 2 J. Barnie Beasley, Jr., P.E.

Vice President 4Mr SOUTHERNAM COMPANY Energy to Serve Your World '

Page 2 U. S. Nuclear Regulatory Commission cc:

Southern Nuclear Operating Company Mr. D. E. Grissette, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.

Mr. F. Rinaldi, Licensing Project Manager - Farley U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley

OPERATING DATA REPORT DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley - Unit 1 DATE:

October 3, 2002 COMPLETED BY:

W. L. Marlar TELEPHONE:

(334) 814-4554 OPERATING STATUS Reporting Period:

Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

SEPTEMBER 2002 854 833 This Month Year to Date Cumulative Number Of Hours Reactor Was Critical:

Hours Generator On-line:

Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MWH):

720.0 720.0 0.0 595,698.0 6,520.1 178,766.0 6,504.0 176,472.2 0.0 0.0 5,430,258.0 139,783,204.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.

Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-1

1.
2.

3.

4.
5.
6.

7.

UNIT SHUTDOWNS REPORTING PERIOD: SEPTEMBER 2002 (I)

REASON A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) METHOD 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

DOCKET NO.:

50-348 UNIT NAME: J. M. Farley - Unit 1 DATE:

October 3, 2002 COMPLETED BY:

W. L. Marlar TELEPHONE:

(334) 814-4554 CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT El-2 Type Method of Date F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.

(YYMMDD)

S: Scheduled (Hours)

(1)

(2)

Comments There were no unit shutdowns during the month.

d -

I I

I There were no significant power reductions this period.

OPERATING DATA REPORT DOCKET NO.:

50-364 UNIT NAME:

J. M Farley - Unit 2 DATE:

October 3, 2002 COMPLETED BY:

W. L. Marlar TELEPHONE:

(334) 814-4554 OPERATING STATUS

1.
2.

3.

Reporting Period:

SEPTEMBER 2002 Design Electrical Rating (Net MWe):

855 Maximum Dependable Capacity (Net MWe):

842 This Month Year to Date Cumulative Number Of Hours Reactor Was Critical:

Hours Generator On-line:

Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MWiH):

313.1 312.0 0.0 250,103.0 6,144.1 161,629.7 6,143.0 159,688.8 0.0 0.0 5,177,998.0 127,760,077.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES E2-1

4.
5.
6.

7.

Date Tag No.

Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

I

.1.

UNIT SHUTDOWNS REPORTING PERIOD: SEPTEMBER 2002 DOCKET NO.:

50-364 UNIT NAME: J. M. Farley - Unit 2 DATE:

October 3, 2002 COMPLETED BY:

W. L. Marlar TELEPHONE:

(334) 814-4554 Type Method of Date F: Forced Duration Reason Shutting Down Cause/Corrective Actions No. (YYMMDD)

S: Scheduled (Hours)

(1)

(2)

Comments 1

020914 S

408.0 C

1 At 0001 on September 14, the unit was taken off-line for the fifteenth refueling outage.

(1) REASON (2) METHOD A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Traming/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT E2-2 At 1648 on September 6, Unit 2 started derating from 100% power due to power coastdown prior to a normal refueling outage. At 1830 on September 13, with the unit at approximately 91% power, the unit was ramped down and taken off-line at 0001 on September 14 for the fifteenth refueling outage.

At 0107 on September 14, the reactor was shutdown and at 1813 on September 21 the core unload was completed. Normal refueling activities remained in progress with the reactor defueled through the end of September.