ML022830235

From kanterella
Jump to navigation Jump to search
Transmittal of Fermi 2, Technical Requirements Manual - Vol 1. Revision 57
ML022830235
Person / Time
Site: Fermi 
Issue date: 09/27/2002
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
00935, e52186
Download: ML022830235 (8)


Text

To: 00935 US NRC DOCUMENT CNTRL DESK DETROIT EDISON -

FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 09/27/02 PAGE 1

WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 57 11 IR 09/27/02 AFC Please destroy or mark all revised, superseded, or cancelled documents as such.

CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166.

(734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: e52186

/

LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 57 dated 09/27/02 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 56 dated 7/10/02 has been inserted prior to inserting these pages.

Location Remove Insert In Front of TRM Manual Immediately following Title Page 3.12 Fire Protection Title Page Rev 56 07/10/02 List of Effective Pages LEP-1 through LEP-4 Rev 56 07/10/02 Page TRM 3.12-8 Rev 40 08/00 Title Page Rev 57 09/27/02 List of Effective Pages LEP-1 through LEP-4 Rev 57 09/27/02 Page TRM 3.12-8 Rev 57 09/02 END

/

Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS-INFORMATION DTC: TMTRM File: 1754 DSN: TRM VOL I

[ Rev: 57 Date: 09/27/02 Recipient

FERMI 2 -

TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Pacre TRMi TRM ii TRM iii TRM iv TRM v TRM vi TRM 1.0-a TRM 1.0-1 TRM 2.0-1 TRM 3.0-a TRM 3.0-1 TRM 3.0-2 TRM 3.0-3 TRM 3.0-4 TRM 3.1-a TRM 3.1-1 TRM.3.2-1 TRM 3.3-a RM 3.3-b TRM 3.3-c TRM 3.3-d TRM 3.3-1 TRM 3.3-2 "T".

3.3-3" TRM 3.3-4 TRM 3.3-5 TRM 3.3-6 TRM 3.3-7 TRM 3.3-8 TRM 3.3-9 TRM 3.3-10 TRM 3.3-11 TRM 3.3-12 TRM 3.3-13 TRM 3.3-14 TRM 3.3-15 TRM 3.3-16 TRM 3.3-17 TRM 3.3-18 TRM 3.3-19 TRM 3.3-20 TRM 3.3-21 TRM 3.3-22 TRM 3.3-23 TRM 3.3-24 TRM 3.3-25 TRM 3.3-26 TRM 3.3-27 TRM 3.3-28 TRM 3.3-29 TRM 3.3-30 TRM 3.3-31 TRM Vol.

I Revision 31 Revision 31 Revision 31 Revision 34 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 54 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 34 Revision 39 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 52 Revision 31 Revision 31 Revision 39 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 REV 57 09/27/02 Page Revision Revision TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TEM TRM TRM TRM TRM TRM TRM TRM TRM TRM TEM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM 3.3-32 3.3-33 3.3-34 3.3-35 3.3-36 3.3-37 3.3-38 3.3-39 3.3-40 3.3-41 3.3-42 3.3-43 3.3-44 3.3-45 3.3-46 3.3-47 3.3-48 3.3-49 3.4-a 3.4-1 3.4-1a 3.4-1b 3.4-2 3.4-3 3.4-4 3.4-5 3.4-6 3.4-7 3.4-8 3.4-9 3.4-10 3.5-1 3.6-a 3.6-1 3.6-2 3.6-3 3.6-4 3.6-5 3.6-6 3.6-7 3.6-8 3.6-9 3.6-10 3.6-11 3.6-12 3.6-13 3.6-14 3.6-15 3.6-16 3.6-17 3.6-18 3.6-19 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision.

Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 41 31 31 31 56 56 45 31 31 31 31 31 31 31 31 36 34 34 31 31 31 31 31 31 31 31 31 31 31 31 31 31 55 31 33 31 31 31 31 31 31 31 31 31 31 31 31 31 LEP-I

FERMI 2 -

TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Revision Pacre Revision TRM 3.6-20 TRM 3.6-21 TRM 3.6-22 TRM 3.6-23 TRM 3.6-24 TRM 3.6-25 TRM 3.6-26 TRM 3.6-27 TRM 3.6-28 TRM 3.6-29 TRM 3.6-30 TRM 3.6-31 TRM 3.6-32 TRM 3.6-33 TRM 3.6-34 TRM 3.6-35 TRM 3.7-a TRM 3.7-b TRM 3.7-1 TRM 3.7-2 TRM 3.7-3 TRM 3.7-4 TRM 3.7-5 TRM 3.7-7 TRM 3.7-7 TRM 3.7-8 TRM 3.7-9 TRM 3.7-10 TRM 3.7-11 TRM 3.7-12 TRM 3.7-13 TRM 3.7-14 TRM 3.7-15 TRM 3.7-16 TRM 3.7-17 TRM 3.7-18 TRM 3.7-19 TRM 3.7-20 TRM 3.8-a TRM 3.8-1 TRM 3.8-2 TRM 3.8-3 TRM 3.8-4 TRM 3.8-5 TRM 3.8-6 TRM 3.8-7 TRM 3.8-8 TRM 3.8-9 TRM 3.8-10 TEN 3.8-11 TRM 3.8-12 TRM 3.8-13 TRM Vol. I Revision 31 Revision 31 Revision 31 Revision 31 Revision 47 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 44 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 50 Revision 50 Revision 50 Revision 50 Revision 50 Revision 50 Revision 31 Revision 31 TRM 3.8-14 TRM 3.B-15 TRM 3.8-16 TRM 3.8-17 TRM 3.8-18 TRM 3.9-a TRM 3.9-1 TRM 3.9-2 TRM 3.9-3 TRM 3.9-4 TRM 3.9-5 TRM 3.10-1 TRM 3. 11-a TRM 3.11-1 TRM 3.12-a TRM 3.12-1 TRM 3.12-2 TRM 3.12-3 TRM 3.12-4 TRM 3.12-5 TRM 3.12-6 TRM 3.12-7 TRM 3.22-8 TRM 3.12-9 TRM 3.12-10 TRM 3.12-11 TRM 3.12-12 TRM 3.12-13 TRM 3.12-14 TRM 3.12-15 TRM 3.12-16 TRM 3.12-17 TRM 3.12-18 TRM 3.12-19 TRM 3.22-20 TRM 3.12-21 TRM 3.12-22 TRM 3.12-23 TRM 3.12-24 TRM 3.12-25 TRM 3.12-26 TRM 3.12-27 TRM 3.12-28 TRM 3.12-29 TRM 3.12-30 TRM 4.0-1 TRM 5.0-a TRM 5.0-1 TRM 5.0-2 TRM 5.0-3 TRM 5.0-4 TRM 5.0-5 Revision 46 Revision 31 Revision 31 Revision 43 Revision 33 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 53 Revision 53 Revision 53 Revision 31 Revision 57.

Revision 40 Revision 31 Revision 49 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 REV 57 09/27/02 Page LE P-2

FERMI 2 -

TECHNICAL REOUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Pacre TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM 5.0-6 5.0-7 5.0-8 5.0-9 B1.0-1 B2.0-1 B3.0-1 B3.0-2 B3.0-3 B3.0-4 B3.0-5 B3.0-6 B3.0-7 B3.1-1 B3.2-1 B3.3.1-1 B3.3.1-2 B3.3.2-1 B3.3.2-2 B3.3.3-1 B3.3.4-1 B3.3.4-2 B3.3.5-1 B3.3.5-2 B3.3.6-1 B3.3.6-2 B3.3.6-3 B3.3.6-4 B3.3.6-5 B3.3.7-1 B3.3.7-2 B3.3.8-1 B3.3.9-1 B3.3.10-1 B3.3.11-1 B3.3.12-1 B3.3.13-1 B3.3.14-1 B3.4.1-1 B3.4.1-2 B3.4.1-3 B3.4.1-4 B3.4.1-5 B3.4.2-1 B3.4.3-1 B3.4.4-1 B3.4.5-1 B3.4.6-1 B3.4.7-1 B3.5-1 B3.6.1-1 B3.6.2-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 54 54 54 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 56 45 31 31 31 31 34 34 34 34 31 31 31 31 31 31 31 31 31 TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRN B3.6.3-1 B3.6.4-1 IB3.6.5-1 B3.6.6-1 B3.6.7-1 B3.6.8-1 B3.7.1-1 B3.7.2-1 B3.7.3-1 B3.7.4-1 B3.7.4-2 B3.7.5-1 B3.7.6-1 B3.7.7-1 B3.7.8-1 B3.7.9-1 B3.7.9-2 B3.8.1-1 B3.8.2-1 B3.8.3-1 B3.8.4-1 B3.8.5-1 B3.8.6-1 B3.9.1-1 B3.9.2-1 B3.9.3-1 B3.9.4-1 B3.10-1 B3.11.1-1 B3.12.1-1 B3.12.2-1 B3.12.3-1 B3.12.4-1 B3.12.5-1 B3.12.6-1 B3.12.7-1 B3.12.8-1 REV 57 09/27/02 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 43 31 31 31 31 31 31 31 44 31 31 31 31 31 31 TRM Vol. I LEP-3

FERMI 2 -

TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 9, Revision 0 Pacr-e Notation Page 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 Revision 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

REV 57 09/27/02 TRM Vol. I LEP-4

Fire Suppression Water System TR 3.12.2 TR 3.12 FIRE PROTECTION TR 3.12.2 Fire Suppression Water System TRLCO 3.12.2 APPLICABILITY:

The fire suppression water system shall be OPERABLE with:

a.

Two fire suppression pumps, each with a capacity of 2500 gpm, with their discharge aligned to the fire suppression header;

b.

The general service water intake structure water level

> 562 feet; and

c.

An OPERABLE flow path capable of taking suction from the general service water intake structure and transferring the water through distribution piping with OPERABLE sectionalizing control or isolation valves to the yard hydrant curb valves, the last valve ahead of the water flow alarm device in each sprinkler or hose standpipe and the last valve ahead of the spray system required to be OPERABLE per TRLCO 3.12.3, TRLCO 3.12.6, and TRLCO 3.12.7.

At all times.

ACTIONS

  • CONDITION REQUIRED ACTION COMPLETION TIME A.

One fire suppression A.1 Restore the 14 days pump inoperable, inoperable pump to OPERABLE status.

OR A.2 Provide an alternate 14 days backup pump.

B.

The fire suppression B.1 Establish backup fire 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> water system suppression water inoperable for reasons system.

other than Condition A.

C.

Required Actions and C.1 Be in MODE 2.

7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> associated Completion Time of Condition B AND not met.

C.2 Be in MODE 3.

13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> AND C.3 Be in MODE 4.

37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> TRM Vol. I TRM 3.12-8 REV 57 09/02