Survey of Settlement Monitoring Points Notification of Procedure Revision
ML022810424
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 10/02/2002
From: Heacock D
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
02-623
Download: ML022810424 (2)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 2, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Serial No.

NAPS/JHL 02-623 Docket Nos.

50-338 50-339 License Nos.

NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 SURVEY OF SETTLEMENT MONITORING POINTS NOTIFICATION OF PROCEDURE REVISION As required by Atomic Safety and Licensing Appeal Board Decision ALAB-578, this letter is to notify you that a revision has been made to periodic test procedure 0-PT 115, Survey of Settlement Monitoring Points.

The revision to periodic test procedure 0-PT-1 15 was conversion to the Improved Technical Specifications distribution of survey reports.

If you have any questions, please contact us.

Very truly yours, D. A. Heacock Site Vice President Commitments made in this letter: None implemented due to the recent and to reflect the changes to