RPS Instrumentation 3.3.1.1 Table 3.3.1.1-1 (page 2 of 3)
Reactor Protection System Instrumentation APPLICABLE CONDITIONS MODES OR REOUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION D.1 REOUIREMENTS VALUE
- 2.
Average Power Range Monitors (continued)
- c.
Fixed Neutron 1
2 F
< 122% RTP Flux-High SR 3.3.1.1.2 SR 3.3.1.1.5 SR 3.3.1.1.9 SR 3.3.1.1.11 SR 3.3.1.1.15 SR 3.3.1.1.1B SR 3.3.1.1.19
- d.
]hop 1.2 2
G SR 3.3.1.1.5 NA SR 3.3.1.1.9 SR 3.3.1.1.11 SR 3.3.1.1.18
- 3.
Reactor Vessel Steam 1.2 2
< 1045 pslg Dome Pressure - High SR 3.3.1.1.5 SR 3.3.1.1.11 SR 3.3.1.1.12 SR 3.3.1.1.17 SR 3.3.1.1.18 SR 3.3.1.1.19
- 4.
Reactor Vessel Water 1.2 2
-5 2.65 inches Level -
Low SR 3.3.1.1.5 SR 3.3.1.1.11 SR 3.3.1.1.12 SR 3.3.1.1.17 SR 3.3.1.1.18 SR 3.3.1.1.19
- 5.
Main Steam Isolation
- 1. 2(c) 8 F
< 9.5% closed Valve - Closure SR 3.3.1.1.11 SR 3.3.1.1.17 SR 3.3.1.1.18 SR 3.3.1.1.19
- 6.
Drywell Pressure-High 1.2 2
< 1.94 psig SR 3.3.1.1.11 SR 3.3.1.1.13 SR 3.3.1.1.18 SR 3.3.1.1.19 (continued)
(c)
With reactor pressure 2 600 psig.
Amendment No.-195 & 188 Dresden 2 and 3 3.3.1.1-9
ATWS-RPT Instrumentation 3.3.4.1 SURVEILLANCE REQUIREMENTS
NOTE ------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains ATWS-RPT trip capability.
SURVEILLANCE FREQUENCY SR 3.3.4.1.1 Perform CHANNEL CHECK.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.4.1.2 Calibrate the trip units.
92 days SR 3.3.4.1.3 Perform CHANNEL FUNCTIONAL TEST.
92 days SR 3.3.4.1.4 Perform CHANNEL CALIBRATION.
The 24 months Allowable Values shall be:
- a.
Reactor Vessel Water Level-Low Low:
> -54.15 inches with time delay set to > 8.3 seconds and _ 9.7 seconds:
and
- b.
Reactor Vessel Steam Dome Pressure-High: < 1241 psig.
SR 3.3.4.1.5 Perform LOGIC SYSTEM FUNCTIONAL TEST 24 months including breaker actuation.
Amendment No. 195 & 188 I
Dresden 2 and 3 3.3.4.1-3