ML022750563

From kanterella
Jump to navigation Jump to search

Correction Ltr, to Amd 179 to Facility Operating License No. NPF-21(Tac. MB3881)
ML022750563
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/01/2002
From: Brian Benney
NRC/NRR/DLPM/LPD4
To: Parrish J
Energy Northwest
Benney B, NRR/DLPM, 415-3764
References
TAC MB3881
Download: ML022750563 (3)


Text

October 1, 2002 Mr. J. V. Parrish Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)

Richland, WA 99352-0968

SUBJECT:

CORRECTION TO AMENDMENT NO. 179 TO FACILITY OPERATING LICENSE NO. NPF-21 (TAC NO. MB3881)

Dear Mr. Parrish:

On September 20, 2002, the Commission issued Amendment No. 179 to Facility Operating License No. NPF-21 for the Columbia Generating Station. The amendment was in response to your application dated January 10, 2002. The amendment revised the technical specifications to extend the surveillance test interval of certain instrumentation channels from the current 18 months to 24 months.

Due to a reproduction error, the technical specifications were printed on one-side only instead of back-to-back. Enclosed is a corrected set of technical specifications. We apologize for any inconvenience this may have caused.

Sincerely,

/RA/

Brian Benney, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-397

Enclosure:

Corrected Technical Specifications cc w/encl: See next page

October 1, 2002 Mr. J. V. Parrish Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)

Richland, WA 99352-0968

SUBJECT:

CORRECTION TO AMENDMENT NO. 179 TO FACILITY OPERATING LICENSE NO. NPF-21 (TAC NO. MB3881)

Dear Mr. Parrish:

On September 20, 2002, the Commission issued Amendment No. 179 to Facility Operating License No. NPF-21 for the Columbia Generating Station. The amendment was in response to your application dated January 10, 2002. The amendment revised the technical specifications to extend the surveillance test interval of certain instrumentation channels from the current 18 months to 24 months.

Due to a reproduction error, the technical specifications were printed on one-side only instead of back-to-back. Enclosed is a corrected set of technical specifications. We apologize for any inconvenience this may have caused.

Sincerely,

/RA/

Brian Benney, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-397 DISTRIBUTION:

PUBLIC

Enclosure:

Corrected Technical Specifications PDIV-2 Reading cc w/encl: See next page Accession No. ML022750563 NRR-106 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME BBenney EPeyton:esp SDembek DATE 10/1/02 10/1/02 10/1/02 DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML022750563.wpd OFFICIAL RECORD COPY

Columbia Generating Station cc:

Mr. Rodney L. Webring (Mail Drop PE04)

Vice President, Nuclear Generation Energy Northwest P. O. Box 968 Richland, WA 99352-0968 Mr. Albert E. Mouncer (Mail Drop 1396)

Vice President, Corporate Services/

General Counsel/CFO Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Chairman Energy Facility Site Evaluation Council P. O. Box 43172 Olympia, WA 98504-3172 Mr. D. W. Coleman (Mail Drop PE20)

Manager, Performance Assessment and Regulatory Programs Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Ms. Christine Perrino (Mail Drop PE20)

Manager, Licensing Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Chairman Benton County Board of Commissioners P.O. Box 69 Prosser, WA 99350-0190 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 69 Richland, WA 99352-0069 Mr. Dale Atkinson (Mail Drop PE08)

Vice President, Technical Services Energy Northwest P. O. Box 968 Richland, WA 99352-0968 Thomas C. Poindexter, Esq.

Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Mr. Bob Nichols Executive Policy Division Office of the Governor P.O. Box 43113 Olympia, WA 98504-3113 Ms. Lynn Albin Washington State Department of Health P.O. Box 7827 Olympia, WA 98504-7827