Text
Sep.
26, 2002 Page 1
of 1 MANUAL HARD COPY DISTRIBUTION
/
DOCUMENT TRANSMITTAL 2002-4417/
COr USER INFORMATION:
rLA[I*LAURL D
EMPL#:23244 CA#:
0363 Phone#: 254-3658 TRANSMITTAL INFORMATTON:
Too FVTITI 4 LAURDL 09/26/2002 LOCATION:
DOCUMENT CONTROL DESK TROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER tANUCSA-2 )
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
113 113 SECURITY COORDINATOR:
EMERGENCY PLAN POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE:
09/03/2002 ADD MANUAL TABLE OF CONTENTS DATE:
09/25/2002 CATEGORY:
PROCEDURES TYPE:
EP ID:
EP-PS-113 REPLACE:
REV:8 REPLACE:
REV:8 REMOVE:
PCAF 2002-1242 REV:
N/A REMOVE:
PCAF 2002-1563 REV:
N/A ADD:
PCAF 2002-1242 REV:
N/A ADD:
PCAF 2002-1563 REV:
N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND
\\CKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
AW TAB 11 EP-PS-1 13-11 CHECK-OFF LIST TITLE:
SITE EVACUATION DATE:
"ISSUE:
ITEMS CHECKED YES NO SCC/ASCC CONTROLLER:
- 1. When ED directs a Site Evacuation with personnel reporting to a remote Assembly area (West Building or Information Center) the TSC Security Coordinator will:
Note: (If personnel are directed to report to their home for evacuation go to step #2)
A. Contact an Accountability Area Leader and direct they report to the SGH to retrieve EP-AD-027, Remote Assembly Area Setup book located in the ACO (book contains procedure building keys and security access codes).
B. Direct SCC/ASCC to notify the SGH ACO with the name of the Accountability/Area Leader who will be retrieving the Remote Assembly Area Setup book.
C. When the Remote Assembly Area Setup is complete the Accountability Area Leader will contact Security @ 3114/3115 or TSC 353-4931 D. TSC Security Coordinator will notify the SCC/ASCC to start evacuation to designated Off-Site Assembly Area.
- 2.
DIRECTED TO INITIATE A SITE EVACUATION A.
By whom:
B.
Evacuation Portals:
C.
Radiological Concerns:
D.
Route of Travel E.
Off-Site Assembly Area:
- 3.
OBTAIN THE NAMES OF ESSENTIAL PERSONNEL REMAINING ON SITE.
- 4.
NOTIFY AND BRIEF THE SECURITY SHIFT SUPERVISOR/ASSISTANT AND SECURITY FORCE MEMBERS OF THE SITE EVACUATION
- 5.
BRIEF AND DISPATCH 2 SECURITY FORCE MEMBERS, ONE TO EACH OF THE ACCOUNTABILITY AREAS, WITH INFORMATION CONCERNING THE SITE EVACUATION A.
Ensure Accountability Area Leaders are informed of:
B.
Evacuation EP-AD-000-384, Revision 9, Page 1 of 3
TAB 11 EP-PS-1 13-11 CHECK-OFF LIST TITLE:
SITE EVACUATION DATE:
ISSUE:
ITEMS CHECKED YES NO C.
Radiological concerns D.
Route of travel E.
Off-Site assembly area
- 6.
NOTIFY ACCESS CONTROL OFFICER(S) TO PREPARE FOR SITE EVACUATION A.
Direct the ACO's to secure the front entrance doors B.
Ensure the doors to the protected area are "IINACTIVATED" to include the entrance turnstiles C.
Ensure 2 Security Force members are at the Egress Portals for collection of keycards and TLD's D.
Notify the Security Controller when Accountability Area Leaders report the evacuation is completed for their accountability area
- 7.
PLACE EGRESS HANDICAP DOOR IN THE EMERGENCY ACCESS MODE AFTER MANNED BY A SECURITY FORCE MEMBER.
- 8.
CONTACT LLEA FOR TRAFFIC CONTROL ASSISTANCE AND NOTIFY LLSA OF:
A.
Radiological concerns B.
Traffic control points.
- 9.
DISPATCH SECURITY FORCE MEMBER(S) FOR TRAFFIC CONTROL ON PPL PROPERTY (if available)
- 10.
NOTIFY THE FOLLOWING PPL FACILITIES DURING NORMAL WORK DAY HOURS (MONDAY - FRIDAY) OF EVACUATION. CONTACT AND INFORM OF A SITE EVACUATION AND PROVIDE THE GROUPS OF THE FOLLOWING INFORMATION:
A.
Evacuation B.
Radiological concerns C.
Route of travel D.
Off-Site assembly area
- 1.
SSES Learning Center 3353 and 3350
- 2.
SSES Access Processing Facility 3347
- 3.
Warehouse #2 (ISFSI Warehouse) 3131
- 4.
500 KV Switchyard 3300
- 5.
Main Warehouse 3349 EP-AD-000-384, Revision 9, Page 2 of 3
TAB 11 EP-PS-1 13-11 CHECK-OFF LIST SITE EVACUATION DATE:
ISSUE:
ITEMS CHECKED West Building Environmental Lab Information Center Peach Stand Sewage Treatment Plant Hazardous Waste Yard Site Garage Riverlands River Intake Structure Firing Range (if operational) 3627 1925 or 542-2191 3376 or 542-2131 1797 3931 3962 1785 542-3206 3379 3367
- 11.
WHEN DIRECTED BY THE TSC SECURITY COORDINATOR DURING WEEKENDS, AND BACK SHIFT HOURS, DETERMINE IF PPL FACILITIES WITHIN THE EXCLUSION ZONE ARE OCCUPIED.
A.
Contact Corporate Security and request if facilities listed below are occupied (Account "OPEN" - Security System DEACTIVATED).
SSES Learning Center - Account #1 a0712 SSES Access Processing Facility - Account #1 a0708 Warehouse #2 (ISFSI Warehouse)- Account #1a0704 500 KV Switchyard - Account #1 a0450 SSES Garage - No Alarm System call 254-1785 Hazardous Waste Yard - No Alarm System call 254-3962 B.
Notify TSC Security Coordinator which PPL Facilities are occupied.
- 12.
VERIFY WITH ACO'S ENSURING ALL PERSONNEL HAVE EVACUATED AND ACCOUNTED FOR A.
Inventory all keycards at both the NGH & SGH
- 13.
UPDATE OSC OR TSC SECURITY COORDINATOR (IF TSC ACTIVATED) ON SITE EVACUATION STATUS 14 ADVISE OSC/SECURITY COORDINATOR WHEN ALL NON ESSENTIAL PERSONNEL HAVE BEEN EVACUATED A.
Time:
B.
Who was notified:
- 15.
UPGRADE SECURITY CONDITION (if necessary)
EP-AD-O00-384, Revision 9, Page 3 of 3 TITLE:
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
15.
YES NO
- 1.
- 2.
- 3.
- 4.
- 5.
6.
I I
YES 0