ML022750102
| ML022750102 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 09/23/2002 |
| From: | Greenlee S Indiana Michigan Power Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| AEP:NRC:2073-03 | |
| Download: ML022750102 (3) | |
Text
Indiana Michigan Power Company Cook Nd "t
500 Cirde Dre Bu[anan Mi 49107 61&465.5,01 Safeguards Information Withhold From Public Disclosure September 23, 2002 Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 INDIANA MICHIGAN POWER AEP:NRC:2073-03 10 CFR 50.54(p)(2)
ATTACHMENT CONTAINS ýý I SAFEGUARDS INFORMATION' WITH-HOLD FROM PUBLIC DISCLOSURE Upon separation from Safeguards pages this document is decontrolled.
Donald C. Cook Nuclear Plant Units 1 and 2 LIST OF CHANGES AFFECTING THE DONALD C. COOK NUCLEAR PLANT PHYSICAL SECURITY PLAN, REVISION 4 Pursuant to the provisions of 10 CFR 50.54(p)(2), Indiana Michigan Power Company is submitting Revision 4 to the "Donald C. Cook Nuclear Plant Physical Security Plan." provides a list of changes affecting Donald C. Cook Nuclear Plant (CNP) Physical Security Plan, Revision 4. contains the Physical Security Plan.
The changes made in this revision do not eliminate plan commitments to specific security measures stated in 10 CFR 73.55(b) through (h), 10 CFR 73 Appendix B, nor do the changes decrease the ability of the CNP physical protection system and security organization to protect with high assurance against a design basis threat as stated in 10 CFR 73.1(a). The changes do not decrease the overall effectiveness of the plan or the security program and, therefore, do not require Nuclear Regulatory Commission approval prior to implementation.
NOTICE: WHEN SEPARATED FROM ATTACHMENTS, THIS DOCUMENT IS DECONTROLLED Safeguards Information Withhold From Public Disclosure AEt Aerin-ica's Ene'gy Partner
- o.
p
'V Safeguards Information Withhold From Public Disclosure AEP:NRC:2073-03 U. S. Nuclear Regulatory Commission Page 2 This letter contains no new commitments.
Should you have any questions, please contact Mr. Brian A. McIntyre, Manager of Regulatory Affairs, at (269) 697-5806.
Sincerely, Scot A. Greenlee Director of Nuclear Technical Services DB/bjb Attachments c:
K. D. Curry, Ft. Wayne AEP, w/o attachments J. E. Dyer, NRC Region III MDEQ - DW & RPD, w/o attachments NRC Resident Inspector, w/o attachments J. F. Stang, Jr., NRC Washington, DC, w/o attachments R. Whale, MPSC, w/o attachments NOTICE: WHEN SEPARATED FROM ATTACHMENTS, THIS DOCUMENT IS DECONTROLLED Safeguards Information Withhold From Public Disclosure
Safeguards Information Withhold From Public Disclosure U. S. Nuclear Regulatory Commission Page 3 AEP:NRC:2073-03 be:
A. C. Bakken III, w/o attachments D. M. Burgoyne, w/o attachments S. A. Greenlee, w/o attachments D. W. Jenkins, w/o attachments J. A. Kobyra, w/o attachments B. A. McIntyre, w/o attachments J. E. Pollock, w/o attachments M. K. Scarpello, w/o attachments T. R. Stephens, w/o attachments T. K. Woods, w/o attachments NOTICE: WHEN SEPARATED FROM ATTACHMENTS, THIS DOCUMENT IS DECONTROLLED Safeguards Information Withhold From Public Disclosure