October 11, 2002 Mr. Thomas Coutu Site Vice President and Interim Plant Manager Kewaunee Nuclear Power Plant Nuclear Management Company, LLC N490 State Highway 42 Kewaunee, WI 54216
SUBJECT:
KEWAUNEE NUCLEAR POWER PLANT - CORRECTION TO ISSUANCE OF AMENDMENT 163 (TAC NO. MB5185)
Dear Mr. Coutu:
On September 24, 2002, the U.S. Nuclear Regulatory Commission issued Amendment No. 163 to Facility Operating License No. DPR-43 for the Kewaunee Nuclear Power Plant. The amendment approved revisions to Technical Specification (TS) requirements for meeting surveillances in TS 4.0.a, TS requirements for missed surveillances in TS 4.0.c, and TS requirements for a Bases control program consistent with the TS Bases Control Program described in Section 5.5 of NUREG-1431, Standard TSs for Westinghouse Plants, Revision 2.
Due to an administrative error, TS pages TS iv, TS 4.0-1, TS B4.0-1, TS B4.0-2, and TS B4.0-3 do not have an Amendment number in the lower right hand corner of the page, and TS page TS 6.21-1 has the incorrect Amendment number. Amendment Number 163 should appear in the lower right hand corner on each of the following pages: TS iv, TS 4.0-1, TS B4.0-1, TS B4.0-2, TS B4.0-3, and TS 6.21-1. In addition, due to an administrative error, TS page TS iv had the following sections inadvertently omitted: 6.0, Administrative Controls, 6.1, Responsibility, 6.2, Organization, 6.2.a, Off-Site Staff, 6.2.b, Facility Staff, and 6.2.c, Organizational Changes. TS page TS iv should have the following sections: 6.0, Administrative Controls, 6.1, Responsibility, 6.2, Organization, 6.2.a, Off-Site Staff, 6.2.b, Facility Staff, and 6.2.c, Organizational Changes. Enclosed are the corrected pages.
Sincerely,
/RA/
John G. Lamb, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-305
Enclosure:
As stated cc w/encl: See next page
October 11, 2002 Mr. Thomas Coutu Site Vice President and Interim Plant Manager Kewaunee Nuclear Power Plant Nuclear Management Company, LLC N490 State Highway 42 Kewaunee, WI 54216
SUBJECT:
KEWAUNEE NUCLEAR POWER PLANT - CORRECTION TO ISSUANCE OF AMENDMENT 163 (TAC NO. MB5185)
Dear Mr. Coutu:
On September 24, 2002, the U.S. Nuclear Regulatory Commission issued Amendment No. 163 to Facility Operating License No. DPR-43 for the Kewaunee Nuclear Power Plant. The amendment approved revisions to Technical Specification (TS) requirements for meeting surveillances in TS 4.0.a, TS requirements for missed surveillances in TS 4.0.c, and TS requirements for a Bases control program consistent with the TS Bases Control Program described in Section 5.5 of NUREG-1431, Standard TSs for Westinghouse Plants, Revision 2.
Due to an administrative error, TS pages TS iv, TS 4.0-1, TS B4.0-1, TS B4.0-2, and TS B4.0-3 do not have an Amendment number in the lower right hand corner of the page, and TS page TS 6.21-1 has the incorrect Amendment number. Amendment Number 163 should appear in the lower right hand corner on each of the following pages: TS iv, TS 4.0-1, TS B4.0-1, TS B4.0-2, TS B4.0-3, and TS 6.21-1. In addition, due to an administrative error, TS page TS iv had the following sections inadvertently omitted: 6.0, Administrative Controls, 6.1, Responsibility, 6.2, Organization, 6.2.a, Off-Site Staff, 6.2.b, Facility Staff, and 6.2.c, Organizational Changes. TS page TS iv should have the following sections: 6.0, Administrative Controls, 6.1, Responsibility, 6.2, Organization, 6.2.a, Off-Site Staff, 6.2.b, Facility Staff, and 6.2.c, Organizational Changes. Enclosed are the corrected pages.
Sincerely,
/RA/
John G. Lamb, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-305
Enclosure:
As stated cc w/encl: See next page Distribution:
GHill (2)
PUBLIC WBeckner, TSB PD 3-1 r/f ACRS OGC RLanksbury, RIII OFFICE PDIII-1/PM PDIII-1/LA PDIII-1/SC NAME JLamb THarris LRaghavan DATE 10/11/02 10/11/02 10/11/02 ACCESSION NO.: ML022740159 OFFICIAL RECORD COPY
Kewaunee Nuclear Power Plant cc:
John H. ONeill, Jr.
Shaw Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 David Zellner Town Chairman - Town of Carlton N2164 County B Kewaunee, WI 54216 Larry L. Weyers Chairman, President, and CEO Wisconsin Public Service Corporation 600 North Adams Street Green Bay, WI 54307-9002 Resident Inspectors Office U.S. Nuclear Regulatory Commission N490 Hwy 42 Kewaunee, WI 54216-9510 Regional Administrator Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Ave M. Bie, Chairperson Public Service Commission of Wisconsin PO Box 7854 Madison, WI 53707-7854 Roy Anderson Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 David Molzahn Nuclear Asset Manager 600 North Adams Street Green Bay, WI 54307-9002 Sarah Jenkins Electric Division Public Service Commission of Wisconsin PO Box 7854 Madison, WI 53707-7854 NRC NRR Project Manager Mail Stop O-8-H-4A U. S. Nuclear Regulatory Commission Washington, DC 20555