Request for Additional Information (RAI) Section 3.7.8, Service Water System Beyond Scope Issue 6
ML022730614
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 10/10/2002
From: Vissing G
NRC/NRR/DLPM/LPD1
To: Kansler M
Entergy Nuclear Operations
References
TAC MB5067
Download: ML022730614 (5)


Text

October 10, 2002 Mr. Michael R. Kansler Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 - REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING SECTION 3.7.8 - SERVICE WATER SYSTEM - BEYOND SCOPE ISSUE NO. 6 (TAC NO. MB5067)

Dear Mr. Kansler:

The Nuclear Regulatory Commission staff is reviewing your application for a license amendment dated March 27, 2002, to change the format and content of the current Technical Specifications (TSs) for the Indian Point Nuclear Generating Unit No. 2 to be generally consistent with NUREG-1431, Standard Technical Specifications Westinghouse Plants Technical Specifications, Revision 2, dated April 2001.

On the basis of our review of the changes proposed for improved TS Section 3.7.8, Service Water System, we find that additional information identified in the enclosure is needed.

We have discussed this with your staff and it was agreeable to your staff to respond to this RAI and provide comments within 60 days from receipt of this letter.

If you have questions regarding this letter or are unable to meet this response schedule, please contact me by phone on (301) 415-1441 or by electronic mail at gsv@nrc.gov.

Sincerely,

/RA/

Guy S. Vissing, Senior Project Manager, Section 1 Project Directorate 1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-247

Enclosure:

As stated cc w/encl: See next page

October 10, 2002 Mr. Michael R. Kansler Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 - REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING SECTION 3.7.8 -

SERVICE WATER SYSTEM - BEYOND SCOPE ISSUE NO. 6 (TAC NO. MB5067)

Dear Mr. Kansler:

The Nuclear Regulatory Commission staff is reviewing your application for a license amendment dated March 27, 2002, to change the format and content of the current Technical Specifications (TSs) for the Indian Point Nuclear Generating Unit No. 2 to be generally consistent with NUREG-1431, Standard Technical Specifications Westinghouse Plants Technical Specifications, Revision 2, dated April 2001.

On the basis of our review of the changes proposed for improved TS Section 3.7.8, Service Water System, we find that additional information identified in the enclosure is needed.

We have discussed this with your staff and it was agreeable to your staff to respond to this RAI and provide comments within 60 days from receipt of this letter.

If you have questions regarding this letter or are unable to meet this response schedule, please contact me by phone on (301) 415-1441 or by electronic mail at gsv@nrc.gov.

Sincerely,

/RA/

Guy S. Vissing, Senior Project Manager, Section 1 Project Directorate 1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-247

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION:

PUBLIC SLittleRGN-1 PD1-1 Reading OGC RLaufer ACRS Gvissing ACCESSION NO.: ML022730614 OFFICE PDI-1/PM PDI-2/LA SC:PD1-1 NAME GVissing SLittle RLaufer DATE 10/7/02 10/7/02 10/7/02 OFFICIAL RECORD COPY

Indian Point Nuclear Generating Station Unit 2 Mr. Jerry Yelverton Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Mr. Fred Dacimo Vice President - Operations Entergy Nuclear Operations, Inc.

Indian Point Nuclear Generating Units 1 & 2 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Robert J. Barrett Vice President - Operations Entergy Nuclear Operations, Inc.

Indian Point Nuclear Generating Units 3 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308 Mr. Dan Pace Vice President Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. James Knubel Vice President Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Lawrence G. Temple General Manager Operations Entergy Nuclear Operations, Inc.

Indian Point Nuclear Generating Unit 2 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Mr. John Kelly Director of Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene Fiason Manager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John McCann Manager, Nuclear Safety and Licensing Indian Point Nuclear Generating Unit 2 295 Broadway, Suite 1 P. O. Box 249 Buchanan, NY 10511-0249 Mr. Harry P. Salmon, Jr.

Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John M. Fulton Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Thomas Walsh Secretary - NFSC Entergy Nuclear Operations, Inc.

Indian Point Nuclear Generating Unit 2 295 Broadway, Suite 1 P. O. Box 249 Buchanan, NY 10511-0249 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector, Indian Point 2 U. S. Nuclear Regulatory Commission 295 Broadway, Suite 1 P.O. Box 38 Buchanan, NY 10511-0038

Indian Point Nuclear Generating Station Unit 2 Mr. William M. Flynn, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. J. Spath, Program Director New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy Electric Division New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Ray Albanese Executive Chair Four County Nuclear Safety Committee Westchester County Fire Training Center 4 Dana Road Valhalla, NY 10592 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue Mail Stop: L-ENT-15E New Orleans, LA 70113 Alex Matthiessen Executive Director Riverkeeper, Inc.

25 Wing & Wing Garrison, NY 10524 Paul Leventhal The Nuclear Control Institute 1000 Connecticut Avenue NW Suite 410 Washington, DC, 20036 Karl Copeland Pace Environmental Litigation Clinic 78 No. Broadway White Plains, NY 10603 Jim Riccio Greenpeace 702 H Street, NW Suite 300 Washington, DC 20001

Enclosure INDIAN POINT 2 IMPROVED TECHNICAL SPECIFICATIONS SECTION 3.7.8 - SERVICE WATER SYSTEM BEYOND SCOPE ISSUE NO. 6 3.7.8 L.1 - The proposed justification of maintaining functional capability, although losing redundency, does not provide acceptable justifcation for the less restrictive allowed outage time (AOT). However, two minor points were also provided as justification that may justify the reduction if more information is provided. Please provide the evaluation or anaylsis for the conclusion that there is a "low probability of an event during the AOT for the pump on the essential and/or non-essential header." Also, provide more explanation on the statement that the time limit for improved technical specification limiting condition for operation 3.8.1 supports the less restrictive AOT.