ML022700529

From kanterella
Jump to navigation Jump to search

Technical Specification Pages for Amendment No. 194, Reactor Equipment Cooling Surge Tank Level Surveillance Requirement
ML022700529
Person / Time
Site: Cooper 
Issue date: 09/18/2002
From: Minns J
NRC/NRR/DLPM/LPD4
To: Denise Wilson
Nebraska Public Power District (NPPD)
References
TAC MB4050
Download: ML022700529 (1)


Text

0 REC System 3.7.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Verify the REC surge tank water level is within limits.

24 hoars SR 3.7.3.2 Verify the temperature of the REC supply water is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

'S 100TF.

SR 3.7.3.3 NOTE Isolation of flow to individual components does not render REC System inoperable.

Verify each REC subsystem manual, power 1 days operated, and automatic valve in the flow paths serAcing safety relaled cooling loads, that is not locked, sealed, or otherwise secured in posiUon, is In the correct position.

SR 3.7.3.4 Verify each REC subsystem actuates on an actual or 18 months simulated initiation signal.

I Cooper Amendment No. 193, 194 I

I 3.7-7