ML022700529
| ML022700529 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 09/18/2002 |
| From: | Minns J NRC/NRR/DLPM/LPD4 |
| To: | Denise Wilson Nebraska Public Power District (NPPD) |
| References | |
| TAC MB4050 | |
| Download: ML022700529 (1) | |
Text
0 REC System 3.7.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Verify the REC surge tank water level is within limits.
24 hoars SR 3.7.3.2 Verify the temperature of the REC supply water is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
'S 100TF.
SR 3.7.3.3 NOTE Isolation of flow to individual components does not render REC System inoperable.
Verify each REC subsystem manual, power 1 days operated, and automatic valve in the flow paths serAcing safety relaled cooling loads, that is not locked, sealed, or otherwise secured in posiUon, is In the correct position.
SR 3.7.3.4 Verify each REC subsystem actuates on an actual or 18 months simulated initiation signal.
I Cooper Amendment No. 193, 194 I
I 3.7-7