ML022700193
| ML022700193 | |
| Person / Time | |
|---|---|
| Site: | Fermi, Hope Creek, Farley, South Texas |
| Issue date: | 12/09/2002 |
| From: | Shelton B NRC/OCIO/IRDMD/RMB |
| To: | Allen B US Executive Office of the President, Office of Mgmt & Budget (OMB) |
| Copeland J (301) 415-6617 | |
| References | |
| OMB-3150-0018 | |
| Download: ML022700193 (3) | |
Text
OMB CLEARANCE 3150-0018 10 CFR PART 55, OPERATORS LICENSES CONSULTATIONS OUTSIDE THE NRC FOR THE 2003 EXTENSION The following individuals were contacted to validate the power reactor burden estimates. Each individual was emailed a copy of the previous Table 12(a) summarizing the burden estimates in advance of a telephone conversation on the dates specified, during which all of the reporting and recordkeeping requirements were briefly reviewed and estimates obtained.
1.
James Calvert; South Texas Project; 361-972-7435; 9/12/2002 2.
Mike Doucet; Fermi; 734-586-4121; 9/16/2002 3.
Gerry Laska; NRC Region II, formerly Farley; 404-564-4626; 9/10/2002 4.
James Reid; Hope Creek; 856-339-3896; 9/13/2002 The non-power examination staff contacted personnel at a small facility (Rolla; representing about 35/40 non-power facilities) and a large facility (Columbia; representing 5/40 facilities) to validate the burden for submitting the reference materials for the initial licensing examinations (the most substantial burden). It was not deemed necessary to validate the other reporting requirements due to their size and frequency; moreover, the non-power staff has never conducted a requalification examination or requested a facility to submit its exams to support an inspection, so licensees would have no better basis to estimate the burden than the staff does.
The results are summarized in the following table.
Table 12(a) Estimated Industry Burden Report Subsection OLD Hours /
Response
Calvert STP Doucet Fermi Laska RII Ried PSEG NEW Average Apply for specific exemptions 55.11 40 40 40 40 40 40 Submit additional information upon request 55.31(b) 2 2 if call 8-16 paper 2
3-4 2 mostly verbal 4
Submit initial licensing exam-ination content information 55.40(a) & (d) 130P 130 130 130 150 130 4NP 2-4 Small (35/40)/Rolla 8-12 Big/Columbia 4
Power reactors prepare and submit written examinations and operating tests 55.40(b)(1) and (3) 500 1600 1000 1000 2000 1200 Request NRC approval to use other than a plant-referenced simulator to administer tests 55.46(b) 120 no basis no basis 120 no basis 120 Certify licensee qualifications and training for reactivation 55.53(f) 1 1
10/yr 1
1-2/yr 1
1 1-2/yr 1
Notification of felony 55.53(g) 0.75 6-8 1
3-4 2
4 Support NRC-conducted requalification examinations 55.59(a)(2)(iii) 100P 100 80 120 100 100 22NP not checked not checked 22 Evidence of retraining 55.59(b) 1 6-8 8
3-4 4-5 6
Submit requalification examinations and tests 55.59(c) 4P 4
4-8 4
4 4
0.5NP not checked not checked 1
REPORT SUBTOTAL
Estimated Industry Burden Record Subsection Hours /
Recordkeeper Calvert Doucet Laska Ried NEW Average Power reactors establish (one-time) examination security and integrity procedures 55.40(b(2)
Single facility 100 100 200 100 100 100 Additional facilities - 50 n/a n/a n/a n/a n/a Power reactors maintain (biennially) examination security and integrity procedures 55.40(b(2) 20 20 10 20 20 20 Power reactors maintain requalification examination question bank 55.59 40 80 40 40 200 100 Maintain simulator performance testing data 55.46(d)(1) 15 40 15 240 to test 25-30 20 25 Maintain records 55.59(c)(5)(i) 12 160 40 80 2000 generate maintain 160 RECORDKEEPING SUBTOTAL TOTAL INDUSTRY BURDEN