ML022690668

From kanterella
Jump to navigation Jump to search
Re Assessment Follow-up
ML022690668
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/20/2002
From: Pederson C
Division of Reactor Safety III
To: Cayia A
Nuclear Management Co
References
Download: ML022690668 (5)


Text

September 20, 2002 Mr. A. Cayia Site Vice President Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

ASSESSMENT FOLLOW-UP LETTER - POINT BEACH NUCLEAR PLANT

Dear Mr. Cayia:

On September 12, 2002, the NRC staff forwarded a letter concerning the final significance determination of a White inspection finding in the emergency preparedness cornerstone. The finding involved your staffs failure to adequately critique a protective action recommendation during the February 12, 2002, Point Beach emergency preparedness exercise.

As a result of a previous significance determination of another White inspection finding in the mitigating systems cornerstone (February 2002), Point Beach performance has been in the Regulatory Response column of the NRCs Action Matrix. That finding concerned the gas binding of a safety injection pump and was reviewed during an August 2002 supplemental inspection, which was documented in NRC Inspection Report Nos. 50-266/02-12 and 50-306/02-12.

Since the two White inspection findings were in different cornerstones (i.e., emergency preparedness and mitigating systems), we have continued to assess Point Beach performance to be in the Regulatory Response column of the NRCs Action Matrix. Therefore, we plan to conduct supplemental inspection 95001 for the emergency preparedness finding during the week of November 4, 2002. This inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

A. Cayia Please contact Mr. Kenneth Riemer at (630) 829-9757 with any questions you may have regarding this letter.

Sincerely,

/RA/

Cynthia D. Pederson, Director Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc:

R. Grigg, President and Chief Operating Officer, WEPCo R. Anderson, Executive Vice President and Chief Nuclear Officer T. Webb, Licensing Manager D. Weaver, Nuclear Asset Manager T. Taylor, Plant Manager J. ONeill, Jr., Shaw, Pittman, Potts & Trowbridge K. Duveneck, Town Chairman Town of Two Creeks D. Graham, Director Bureau of Field Operations A. Bie, Chairperson, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer

A. Cayia Please contact Mr. Kenneth Riemer at (630) 829-9757 with any questions you may have regarding this letter.

Sincerely,

/RA/

Cynthia D. Pederson, Director Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc:

R. Grigg, President and Chief Operating Officer, WEPCo R. Anderson, Executive Vice President and Chief Nuclear Officer T. Webb, Licensing Manager D. Weaver, Nuclear Asset Manager T. Taylor, Plant Manager J. ONeill, Jr., Shaw, Pittman, Potts & Trowbridge K. Duveneck, Town Chairman Town of Two Creeks D. Graham, Director Bureau of Field Operations A. Bie, Chairperson, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML022690668.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII RIII NAME SOrth:sd RLanksbury KRiemer CPederson DATE 09/18/02 09/19/02 09/19/02 09/20/02 OFFICIAL RECORD COPY

A. Cayia ADAMS Distribution:

WDR DFT DWS BAW RidsNrrDipmIipb GEG HBC PGK1 C. Ariano (hard copy)

DRPIII DRSIII PLB1 JRK1 NRR/DIPM/IIPB