ML022680171

From kanterella
Jump to navigation Jump to search
Revision 10 to Updated Final Hazards Summary Report (Ufhsr)
ML022680171
Person / Time
Site: Big Rock Point  File:Consumers Energy icon.png
Issue date: 09/18/2002
From: Haas K
Consumers Energy
To:
Document Control Desk, NRC/FSME
References
+sispmjr200503, -RFPFR
Download: ML022680171 (3)


Text

CiWmsnmers EnmerWgy A CMS Energy Company Big Rock Point Nuclear Plant Kurt AI Haas 10269 US-31 North General Manager Charlevoix, MI 49720 September 18, 2002 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 DOCKETS 50-155 AND 72-043 - LICENSE DPR BIG ROCK POINT PLANT REVISION 10 TO THE UPDATED FINAL HAZARDS

SUMMARY

REPORT (UFHSR)

In accordance with 10 CFR 50.71 and 10 CFR 50.4, one (1) original and ten (10) copies of this submittal are enclosed This revision to our Updated Final Hazards Summary Report (UFHSR) is submitted on a replacement page basis with vertical lines in the right hand margin indicating the area changes and "Revision 10" in the upper right hand comer. For clarity and to avoid re-pagination and blank pages, entire sections have been issued.

Attached is a List of Effective Pages (Attachment 1), an Index of Chapters (Attachment II), Page Replacements (Attachment III), and a Detailed Listing of Revision 10 Changes, addressed section by section (Attachment IV).

The Environmental Report for Decommissioning was submitted to the NRC on February 27, 1995. This UFHSR revision incorporated the Environmental Report for Decommissioning (BRP Volume 32) in UFHSR Chapter 2, SITE CHARACTERISTICS, by reference. Attachment V provides an Informational Copy of Volume 32, Environmental Report for Decommissioning Also incorporated by reference in our UFHSR, is the Quality Program Description for Big Rock Point Plant. 10 CFR 50.54(a)(3) requires ..."changes to the quality assurance program description that do not reduce commitments must be submitted to the NRC in accordance with the requirements of section 50.71(e)." This letter provides Revision 20 of the Quality Program Description for Nuclear Power Plants, Part 1 - Big Rock Point (CPC-2A)," (Attachment VI). Attachment VII is a matrix describing each change from Revision 19 to Revision 20, the reason for the change, and the basis for concluding that none of the changes reduce previous commitments. The quality program, as revised, continues to meet 10 CFR 50, Appendix B requirements The Revision 20 changes were made to address the transfer of the Palisades Plant operating license to the Nuclear Management Company. At that time, the Quality Program Description applied to both

Big Rock and Palisades. As a result, the Quality Program Description has been split into plant-specific Parts 1 (Big Rock) and 2 (Palisades).

If you have any questions, please contact Gregory C. Withrow, Engineering, Operations, and Licensing Manager at 231-547-8176.

Kurt M. Haas Site General Manager CC: Administrator, Region 1II, USNRC NRC Decommissioning Inspector - Big Rock Point NRC NRR Project Manager - John L. Minns NRC NMSS Project Manager - James C. Shepherd Attachment(s)