Tennessee Valley Authonty, Post Office Box 2000, Decatur, Aiabama 35609-2000 September 11, 2002 10 CFR Part 50, App E U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Gentleman:

In the Matter of Tennessee Valley Authority Docket Nos.

50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1, 2,

and 3 EMERGENCY PLAN IMPLEMENTING PROCEDURE (EPIP) REVISIONS TVA is submitting this notification in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V.

Specifically, several EPIPs were revised:

(1)

EPIP-2, Revision 24; (2)

EPIP-3, Revision 27; (3)

EPIP-4, Revision 26; (4) EPIP-5, Revision 31; and (5)

EPIP-II, Revision 9.

The revisions have an effective date of August 26, 2002.

The enclosed information is being sent by certified mail.

The signed receipt signifies that you have received this information.

If you have any questions, please telephone me at (256) 729-2636.

-P, Lý5 Pnnted on recycled paper t

) )

U.S. Nuclear Regulatory Commission Page 2 September 11, 2002 Enclosure cc (Enclosure):

NRC Resident Inspector (Enclosure provided by Browns Ferry Nuclear Plant BFN Document Control Unit)

P.O.

Box 189 Athens, Alabama 35611 Mr. Paul E.

Fredrickson (2 Enclosures)

U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street S.W.,

Suite 23T85 Atlanta, Georgia 30303-8931 Mr. Kahtan N.

Jabbour, Senior Project Manager (w/o Enclosure)

U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)

Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738

ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 EMERGENCY PLAN IMPLEMENTING PROCEDURES (EPIP) REVISIONS EPIP-2, EPIP-3, EPIP-4, EPIP-5, AND EPIP-1I SEE ATTACHED

f I

GENERAL REVISIONS GENERIC FILING INSTRUCTIONS FILE DOCUMENTS AS FOLLOWS:

PAGES TO BE REMOVED EPIP-2 Revision 23 EPIP-3 Revision 26 EPIP-4 Revision 25 EPIP-5 Revision 30 EPIP-1I Revision 8A PAGES TO BE INSERTED EPIP-2 EPIP-3 EPIP-4 EPIP-5 EPIP-II Revision 24 Revision 27 Revision 26 Revision 31 Revision 9

TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-2 NOTIFICATION OF UNUSUAL EVENT REVISION 24 PREPARED BY: T. W. CORNELIUS RESPONSIBLE ORGANIZATION: EMERGENCY PREPAREDNESS APPROVED BY: GILBERT V. LITTLE PHONE: 2038 DATE: 08/22/2002 EFFECTIVE DATE: 08/26/2002 LEVEL OF USE: REFERENCE USE QUALITY-REIATED

REVISION LOG Procedure Number:

EPIP-2 Revision Number:

24 Pages Affected: 2,3,4,7,11 Description of Change:

IC-27 This change is being conducted to incorporate tile management of NRC Counmitlnent changes as prescribed in the correspondence from site licensing RIMS R08000217713. to rcmuo e the Public Infornation Officer from the notification forn and to hunman factor the notification and follow -up notification forms.

Page 2 - change to step 3.1.1 involhes human factoring the Notification Form Title.

Page 7 - changes involhes removing the -NRC Comnntnient Brackets to step requinng the re% mew of PORC and the humnan factonng of applicable steps Page 7 - change lna oN es hulnan factoring attachment title Page 8 - change inN ohves hunman factoring attachmnent title and inodif ing information to ensure consistency wiith NRC guidance.

Page 9 - change inN olh es renioN ing the Public Information Officer froml the Attachment B notifications along wilth the NRC Comnnitment Brackets Page 10 - change inoIved adding a clarify statement concerning the appropriate use of the Follow%

up Notification Form IC-28 EPIP-2. revision 23 is being issued to incorporate changes resulting from the letter. NEI to NRC (to Mr. Bruce A. Boger) dated December 18. 2001 requesting confimnation for EAL basis change to include response to a Site-Specific Security Credible Threat. This letter wxas deN eloped in response to the NRC's October 6. 2001 Safeguards Advisory. The change to this EPIP is a consequence to the EAL change. Under specific conditions this change wN ill activate the ERO along NA ith asseinbly/accountability.

The revision also incorporates standardization of telephone numnbers and actions taken by the Unit 1. Unit Operator dunng ERO staffing.

Page 2 - pro% Wde the action to staff the ERO ii hen a credible site security threat notification exists.

Page 3 - provide the action to assembly/account site personnel for the purpose of establishing the

"-Twio Person (Line of Sight) Rule*"

Page 4 - standardize the reN mew' of PORC for actual events.

Page 7 - add attachment D.

Page t I - add attachment D. actions taken by the Unit 1 Unit operator to staff the ERO IC-29 EPIP-2. revision 24. page 3 is being conducted to add clarification to the caution note regarding on site secuntv conditions for assembli/accountablity. Additionally page 2 and 5 was re ised to update telephone infonnation regarding the Office of Radiation Control

NOTIFICATION OF UNUSUAL EVENT EPIP-2 BROWNS FERRY NUCLEAR PLANT 1.0 PURPOSE 1.1 Provide for timely notification of appropriate individuals or organizations when the Shift Manager has determined by EPIP-1 that an incident has occurred which is classified as a NOTIFICATION OF UNUSUAL EVENT.

1.2 Provide for periodic analysis of the current situation by the Shift Manger/Site Emergency Director (SED) to deterrffineywhether the NOTIFICATION OF UNUSUAL EVENT should be terminated, continued, or upgraded to a more serious classification.

2.0 SCOPE This procedure applies to emergency events that are classified as a Notification of Unusual Event by EPIP-1, Emergency Classification Procedure...'

.3 I.

1,

1 3.3

.3 3',3 I

3 A;

.3 4

4 44, 4.'

34 2'



3 4*

.4 43



PAGE 1 OF 12 REVISION 24

NOTIFICATION OF UNUSUAL EVENT EPIP-2 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS 3.1 Notification of the Operations Duty Specialist (ODS)

Note: The ODS should be notified within 5 minutes after the emergency event is declared.

Date: _

/

3.1 1 Complete Attachment A (Initial Notification Form) 3.1.2 If the NOUE has been declared due to the Security Emergency Action Level (EAL) 6 7-U, "A credible site specific security threat notification", Then direct the Unit 1, Unit Operator to implement Attachment D, "Activation of the Emergency Paging System/Staffing of Emergency Responders" 3.1.3 Notify the ODS and Provide the information from Attachment A Note: Utilize the direct ring--down ODS phone when making this notification or as applicable dial direct.

ODS Telephone Numbers 5-751-1700 5-751-2495 If the ODS cannot be reached within 10 minutes, Then contact the State of Alabama directly by requesting the Office of Radiation Control at Day Shift 8 a m - 5 p.m. (Central Time)

Primary:

9-1-334-206-5391 Backup 9-1-800-582-1866 Holidays-Weekends-Offshifls Montgomery State Trooper Post 9-1-334-242-4378 3.1.4 Fax a copy of Attachment A to the ODS for confirmation of information or state if contacted directly ODS Fax 5-751-8620 Office of Radiation Control 9-1-334-206-5387 REVISION 24 INITIALS TMIE IN]1 L ILS TL\\LE INITIALS TIE IiTIL*S Tm PAGE 2 OF 12

NOTIFICATION OF UNUSUAL EVENT EPIP-2 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.1.5 Receive confirmation call from the ODS (to verify notification of the State of Alabama) (NA this step if the State was contacted directly).

3.2 NOTIFICATION OF SITE PERSONNEL 3.2.1 Provide the Unit 1, Unit Operator with a completed copy of Attachment A 3.2.2 Direct the Unit 1, Unit Operator-to make notifications from Attachment B ( Unit 1,,Unit Operator Notifications), utilizing information from Attachment A.

3.2.3 Make the following plant P.A. announcement:

INITIALS TIE INITLXLS TnEE INITLAS INIILUS' TIME TL\\IE THIS IS (NAME), SHIFT MANAGER. A NOTIFICATION OF UNUSUAL EVENT HAS BEEN DECLARED ON UNIT `-ý.

I HAVE ASSUMED THE DUTIES OF SITE EMERGENCY DIRECTOR.

3.2.4 Notify the Plant Manager, or alternate.,

1NITIALS CAUTION:

Do not initiate Assembly and Accountability if.

1.

A severe weather condition exist or projected on-sie, suh 2

An on-site security risk condition exists that may present a danger to site personnel during the assembly/accountability process (Consult with Nuclear Security).

3.3 ACCOUNTABILITY 3.3.1 If the NOUE has been declared due to Security EAL, 6.7-U, and Nuclear Security recommends Accountability to establish the "Two Person (Line of Sight) Rule",

Then implement EPIP-8, Appendix C, for Assembly and Accountability only.

INITILS TE*IE REVISION 24 I

TWIE PAGE 3 OF 12

NOTIFICATION OF UNUSUAL EVENT EPIP-2 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.4 OFFSITE DOSE ASSESSMENT 3.4.1 Evaluate the need for offsite dose assessment (N/A STEP IF NOT APPLICABLE) 3.4.1.1 When offsite dose assessment is required obtain the information from the CECC when operational 3.4.1.2 If the CECC is not operational, contact the TSC, when staffed or the RADCON Shift Supervisor and request the implementation of EPIP 14, for dose assessment 3.5 NOTIFICATION OF THE NRC 3.5.1 Notify the NRC immediately or within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and if requested by the NRC maintain an open and continuous communications channel Note: Utilize the Emergency Notification System (ENS) when making this notification Dial the first number listed on the sticker affixed to the ENS telephone, by dialing 9-1 "The Ten Digit Number Listed on the ENS Telephones".

If the number is busy, Then select in order, the alternate numbers until a connection is achieved No access codes are required IMTLLS FrIME IMN1TL\\L%

IIME PAGE 4 OF 12 REVISION 24

NOTIFICATION OF BROWNS FERRY UNUSUAL EVENT nrIr-z NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.6 PERIODIC EVALUATION OF THE EVENT 3.6.1 Continue to Evaluate the event by using EPIP-1 as conditions warrant.

3.6.2 If other EAL conditions exist indicating the current emergency classification or significant changes in plant conditions have occurred since the last update to the ODS, and the CECC is not staffed, jýM Complete the "Follow-Up" Notification Form (Attachment C), notify the ODS and provide the new information Utilize the direct ring-down ODS phone when making this notification or as applicable dial direct.

.ODS 751-1700 5-751-2495 Note If the ODS cannot be reached, Then contact the State of Alabama directly by requesting the'Office of Radiation Contr6l at:

n.

")

I Day Shift 8 a m. - 5 p.m (Central Time)

Primary: 9-1-334-206-5391 Backup: 9-1-800-582-1866 Holidays-Weekends-Offshifts

'Montgomery State'Trooper Post 9-1-334-242-4378 3.6.3 If the conditions warrants upgrading to a higher classifications, Then initiate the appropriate EPIP 3.6.4 If the conditions warrant termination of the classification, Then enter the Termination section of this procedure at step 3.7.

3.6.5 Re-enter this procedural section as conditions warrant at step 3.6.1 or until directed to exit this procedure by steps 3.6 3 or 3.6 4.

- PAGE 5 OF 12 REVISION 24

NOTIFICATION OF UNUSUAL EVENT EPIP-2 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.7 TERMINATION OF THE EVENT If the situation no longer exists terminate the event and notify the following:

Date:

/

/

3.7.1 Notify the ODS of the termination of the emergency or the state directly if the ODS cannot be contacted.

3.7.2 Notify the NRC of the termination of the emergency 3.7.3 Notify the Plant Manager or Alternate of the termination of the emergency 3.7.4 Complete Attachment A by providing the time and date of termination 3.7.4 Notify the Unit 1, Unit Operator Provide the Unit 1, Unit Operator with the termination time and date and direct the Unit 1, Unit Operator to notify the individuals contacted on Attachment B of the termination of the emergency INITL%,LS TIMtE IN1TLLS TLE L\\ITLI\\LS IME IN11 LAL'%

TLME LN1TLXL%

TIME PAGE 6 OF 12 REVISION 24

NOTIFICATION OF UNUSUAL EVENT EPIP-2 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.8 CLOSURE OF THE NOTIFICATION OF UNUSUAL EVENT 3.8.1 Upon teimination of the Notification of Unusual Event, the Shift Manager shall send the completed EPIP-2 and all attachments to Emergency Preparedness (EP).

3.8.2 Upon receipt of completed EPIP-2 and all attachments, Emergency Preparedness shall forward dociiinents for' the purpose of documentation storage.

INITILS TmE INITALS TIME 4.0 ATTACHMENTS Attachment A - Initial Notification Form Notification of Unusual Event Attachment B - Unit 1, Unit Operator Notifications Attachment C - Follow Up Information Form Notification of Unusual Event Attachment D - Activation of the Emergency Paging System (EPS)/Staffing of Emergency Responders

'I

,i a-

PAGE 7 OF 12 I

REVISION 24

NOTIFICATION OF P

BROWNS FERRY UNUSUAL EVENT Ir

-z NUCLEAR PLANT ATTACHMENT A (Page 1 of 1)

INITIAL NOTIFICATION FORMI NOTIFICATION OF UNUSUAL EVENT L] THIS IS AN ACTUAL EVENT

[-- THIS IS AN EXERCISE This is NA\\ME A NOTIFICATION OF UNUSUAL EVENT has been declared at Browns Ferry affecting:

F] Unit I Unit 2 L-Unit 3 L-Common Event Declared Time Date EAL Designator.

Brief Description of the Event Radiological Conditions:

L--

No Abnormal Releases Offsite L-- Airborne Release Offsite

-- Liquid Release Offsite Release Information Not Known at this time

-- There is no Protective Action Recommendation at this time.

L-Ask, "Please repeat the information you have received to ensure accuracy."

REVISION 24 PAGE 8 OF 12

  • NOTIFICATION OF UNUSUAL EVENT EPIP-2 BROWNS FERRY NUCLEAR PLANT ATTACHMENT B (Page 1 of 1)

UNIT 1, UNIT OPERATOR NOTIFICATIONS Date:

/

/

Note. All notifications should be made utilizing the information located on EPIP 2, Attachment A Received a completed copy of EPIP 2, Attachment A from the Site Emergency Director.

1.NITLUd TnIE Pprcnnnpl Nntifl-tionc

Notify the Operations Manager (from the weekly duty list)

Notify the Vice President (from the weekly duty list)

Notify the REP manager (from the weekly duty list)

Notify the Nuclear Security Shift Supervisor.

Ext 3150or2219 Notify the NRC Resident Ext.

2573, or 2572 or from the weekly duty list.

Initial Notifications Initials

Initials, Initials Time Time Initials Time Initials Time Termination Notifications Initial Initials Time Timed Initials Tine Initials Time Initials Time PAGE 9 OF 12

'P'-rC!rnnA1 Initial Notifications REVISION 24

NOTIFICATION OF

'BROWNS FERRY UNUSUAL EVENT EP IP-2 NUCLEAR PLANT ATTACHMENT C (Page 1 of 1)

FOLLOW-UP INFORMATION FORM NOTIFICATION OF UNUSUAL EVENT E-THIS IS A REAL EVENT

[:1 THIS IS A DRILL Note: This form is for conducting Follow-up Information only This is Name at Browns Ferry Name There has been a NOTIFICATION OF UNUSUAL EVENT declared at Browns Ferry affecting L-- Unit I F-- Unit 2 El Unit 3 )I--

Common The Reactor is -] Shutdown L-At Power Plant Conditions are El Stable El-Deteriorating "Follow-Up" Information (e g, Key Events, Status Changes)

Current Radiological Conditions are.

El No Abnormal Releases Offsite F] Airborne Release Offsite

[:1 Liquid Release Offsite F1 Release Information Not Known Additional Rad information: (e.g, release duration)

FI-There is no Protective Action Recommendation at this time.

Please repeat the information you have received to ensure accuracy.

The time for this follow up is Time:

Date:

SIGNATURE:

REVISION 24 1

PAGE 10 OF 12

NOTIFICATION OF E

BROWNS FERRY UNUSUAL EVENT nrIR-2 NUCLEAR PLANT

'ATTACHMENT D (Page 1 of 2)

ACTIVATION OF THE EMERGENCY PAGING SYSTEM,(EPS)-/ STAFFING OF

- EMERGENCY RESPONDERS NOTES: (1) The Emergency Paging' System consists of a dedicated touch-screen'CRT. ýActivation of any screen feature requires the user place their fingertip within the boundary of the select button and ldavv'itfthere for at least '1 second. T he CRT Screen will normally display a large rectangle that indicates that the paging sys-trm is" avafiilable but currently inactive (2) If the EPS fails to*o'prte, 6onacat the SMISED immediately. Request that the ODS be contacted to initiate the systeiim from' his l5dcatioh. If the systein rfails to operate from the ODS area, then utilize the Weekly Duty List and Call-Ou't List to manually staff the Emergency Responders, implementing this attachment at step 5.

PRESS the EPS CRT Screen once to activate the paging options.

INITIALS TIME

2.

PRESS the appropriate option INITIALS TIME

  • PAGER TEST
  • DRILL
  • EMERGENCY
  • ABORT
3.

PRESS the START Button to initiate the option or ABORT to deny the option request.

INITIALS TIME

4.

Monitor the Paging System Terminal Display A.

IF... A "NO" response is observed INITIALS TIME OR The position being paged has not responded within approximately 20 minutes THEN.. *Utilize the Weekly Duty List and attempt to contact the position representative with available information. (No Fitness for Duty Question Required)

B.

IF... The individual cannot be reached utilizing the Weekly Duty List THEN...Utilize the Call-Out List and attempt to contact an alternate position representative. (Fitness for Duty Question Reqcui-ed)' '

REVISION 24 I

PAGE I11 OF 12

NOTIFICATION OF UNUSUAL EVENT EPIP-2 BROWNS FERRY NUCLEAR PLANT ATTACHMENT D (Page 2 of 2)

ACTIVATION OF THE EMERGENCY PAGING SYSTEM (EPS) / STAFFING OF EMERGENCY RESPONDERS 5

Manual Call-Out (N/A step if EPS operates normally)

A.

Utilize the current Weekly Duty List and contact positions as listed.

B.

If a position can not be reached from the current Weekly Duty List, then refer to the Call-Out List as applicable to fill all vacant positions

6.

CONTINUE until all positions have been filled.

LAST PAGE INITIALS TIME INITIALS TIME PAGE 12 OF 12 REVISION 24

TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE SEPIP-3-:

ALERT REVISION 27 PREPARED BY: T. W. CORNELIUS RESPONSIBLE ORGANIZATION: EMERGENCY PREPAREDNESS APPROVED BY: GILBERT V. LITTI.E EFFECTIVE DATE. 08/26/2002 LEVEL OF USE: REFERENCE USE

  • PHONE: 2038 DATE: 08/22/2002 QUALITY-RELATED

REVISION LOG Procedure Number:

EPIP-3 Revision Number: 27 Pages Affected: 2,A,8 Description of Change:

IC-30 This change is being conducted to incorporate thie management of NRC Commitment changes as prescribed in the correspondence from site licensing RIMS R08000217713. and to human factor the notification and followx-up notification forms Page 2 - change to step 3 2 1 in,,olxes human factoring the Notification Form Title.

Page 6 - changes inm olves removing the "NRC Commitmnent Brackets to step requiring the rex iew of PORC and the human factoring of applicable steps.

Page 7 - change inA o1h es human factoring attachment title and modl% ing infornation to ensure consistency wiith NRC guidance.

Page 8 - change mnvohes adding information regarding the support of the Unit 1 Operator in staffing the ERO Page 9 - Updated information for the Unit Operator to use during the ERO staffing process.

Page 10 - change mn olved adding a clarifx statement concerning the appropriate use of the Follow up Notification Forn IC-31 EPIP-3. rex ision 26 is being issued to incorporate changes regarding assembly and accountability actions All actions to initiate the accountability and ex acuation processes are now located in EPIP-8. The revision additionally standardizes telephone numbers. and PORC reviews This rex ision also adds clarification for the actions taken bN the Unit I Unit Operator during their staffing of the ERO process Page 3 - added a statement to the caution information regarding securiti threat Clarified steps 3 4 1 and 3.4 2 to implement EPIP-8 regarding actions to be taken for assembl,/accountability and exacuation Page 6 - standardize Alert procedure closure information Page 8.9 - Clarify actions taken by the Unit I Unit Operator during the notification attachment IC-32 EPIP-3. revision 27 is being conducted to incorporate changes regarding actions to be taken when dangerous conditions exist on site that would require the assemnbly of the ERO at the staging area Additionally page 3 and 5 were rex ised to update telephone information regarding the Office of Radiation Control Page 2 - change instnrct the SED wlhen to direct the Unit I Unit Operator to assembly the ERO at the staging area Page 4 - rev'ision adds clarification to the caution note regarding on-site security conditions for assembly/accountability.

Page 8 - revision adds option for staging area

ALERT 3T'

-BROWNS FERRY EPIP7-1 NJCLEARPLANT 1.0 PURPOSE 1.1' Provide for timely notification of appropriate individuals or organizations when the Shift Manager/Site Emergency Director (SED) has determined by EPIP-1 that an "incident has-occurred which is classified as an ALERT.

1.2 Provide for periodic evaluation of the current situation by the Shift Manager/SED to determine whether the ALERT should be terminated, iontinued, or upgraded to a more serious classification:

2.0 SCOPE This procedure applies to emergency events that are classified as Alert by EPIP-1, Emergency Classification Procedure.

PAGE 1 OF,10 REVISION 27

ALERT EPIP-3 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS Date:

/

/

3.1 If all Emergency Centers ARE STAFFED, Then notify the following that an ALERT Emergency Classification has been issued and EPIP 3 is being implemented, and continue in this procedure at Step 3 4. If all Emergency Centers ARE NOT STAFFED, Then N/A this step and continue in this procedure.

Control Rooms Plant PA Announcement This is NAME. Site Emergency Director. an Alert hlis been declared at BFN. xe are cunenlt implementing EPIP-3 Standby for further updates IN-ITLI, TLME 3.2 Notification of the Operations Duty Specialist (ODS) & Emergency Responders Note The ODS should be notified within 5 minutes after the emergency event is declared.

3.2.1 Complete Attachment A (Initial Notification Form) 3.2.2 Activating Emergency Response Organization (ERO) 3.2.2.1 If ongoing/anticipated on-site security events may present a danger to the emergency responders, Then consult with Nuclear Security 3.2.2.2 If ongoing/anticipated events present a danger to emergency responders, Then. direct the Unit I Unit Operator to make notifications per Attachment B and select "Staging Area" as the option for the Emergency Paging System 3.2.2.3 If there are no ongoing/anticipated danger to emergency responders, Then direct the Unit I Unit Operator to make notifications per Attachment B and select as applicable, "Drill" or "Emergency" as the option for the Emergency Paging System I ITL LBL INITLL%,

TLME~

TLmE PAGE 2 OF 10 CECC TSC OSC M

D1 D--

I ItNI11LS TIMtE IN.ITLL%,

r1IE REVISION 27

ALERTEPIP3 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.2.3 -Notify the ODS and Provide the information from Attachment A.

INITLALS TLME Note: Utilize the direct ring-down ODS phone when making this notification or as applicable dial direct.

ODS Telephone Numbers 751-1700,or 2495 If the ODS cannot be reached within 10 minutes, Then,,

contact the State of Alabama directlyby requesting the, Office of Radiation Control at:

Day Shift 8 a m - 5 p m (Central)

Primary: 9-1-334-206-5391 Backup 9-1-800-582-1866 Holidays-Weekends-Off-Shifts Montgomery State Trooper Post 9-1-334-242-4378' 3.2.4 Fax a copy of Attachment A to the ODS for confirmation of information or state if the state was contacted directly.

ODS Fax 5-751-8620 INITLuLS TIME Office of Radiation Control Fax 9-1-334-206-5387 3.2.5 Receive confirmation'call from the ODS (to verify notification of the State of Alabama)(NA this step, if the state was contacted directly) 3.3 NOTIFICATION OF SITE PERSONNEL 3.3.1 Make the following plant P.A. announcement:

THIS IS (NAME), SHIFT MANAGER A ALERT HAS BEEN DECLARED ON UNIT

. I HAVE ASSUMED THE DUTIES OF SITE EMERGENCY DIRECTOR. REPORT TO YOUR ASSIGNED EMERGENCY RESPONSE FACILITY AT THIS TIME.

,PAGE 3 OF 10 INWALS TIME INITrLS TLME REVISION 27

ALERT EPIP-3 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED)

CAUTION:

Do not initiate Assembly and Accountability if:

I A severe weather condition exist/projected on-site, such as a Tornado 2

An on-site security risk condition exists that may present a danger to site personnel during the assembly/accountability process (Consult with Nuclear Security).

3.4 ACCOUNTABILITY 3.4.1 If the emergency situation warrants an Assembly, Accountability, Then implement EPIP-8, Appendix C, concurrently with this procedure (N/A STEP IF NOT APPLICABLE) 3.4.2 If the emergency situation does not warrant an Assembly, Accountability at this time, Continue to assess the situation, implementing EPIP-8 when necessary 3.5 OFFSITE DOSE ASSESSMENT 3.5.1 Evaluate the need for offsite dose assessment (N/A STEP IF NOT APPLICABLE) 3.5.1.1 When offsite dose assessment is required obtain the information from the CECC when operational 3.5.1.2 If the CECC is not operational, contact the TSC, when staffed or the RADCON Shift Supervisor and request the implementation of EPIP 14, for dose assessment.

INITLIA TLwE INITL.L, TmIE REVISION 27 1

PAGE 4 OF 10

ALERT EPIP-3 BROWNS FERRY, NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED)

S*

  • T~t*T'ttt IIrTfM*Tf*lr*

T T

nlw"*

~

.3.0 YNUI rIrl.AI1 NUt Or II-I., E 3.6.1 Notify the NRC immediately or within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and if requested by the NRCmaintain an open and continuous IL.S communications channel TIME Note: Utilize the Emergency Notification System (ENS) when making this notification. Dial the first number listed on the sticker affixed to the ENS telephone, by dialing 9 "The Ten Digit Number Listed on the ENS Telephones".

If the number is busy, Then select in order, the alternate.

numbers until a connection is achieved. No access codes are required.

3.7 PERIODIC EVALUATION OF THE EVENT 3.7.1 Continue to Evaluate the event usifig EPIP-1 ;as conditions warrant.JJ.'-,

3.7.2 If plant conditions warrant the need for follow up information, Complete the Follow Up Notification Form, Attachment C.

Note: Conditions that warrant this'evaluati6n are as'a minimum when other EAL conditions exist indicating the current emergency classification or significant changes in plant conditions have occurred 3.7.3 If the CECC is not staffed, Then notify the ODS and provide follow up.

information from the completed Attachment C form Utilize the direct ring-down ODS phone when making this notification'or-as applicable dial direct.

ODS-5-751-2495,1700 ',, '

I - !:,,

Note: If the ODS cannot'be reached,'Then contact the State of Alabamna directly by requesting the Office of Radiation Control at:

Day Shift 8 a m - 5 p m (Central Time)

Primary.

9-1-334-206-5391 Backup 9-1-800-582-1866 Holidays-Weekends-Off-shifts Montgomery State Trooper Post 9-1-334-242-4378 3.7.4 If the conditions warrant upgrading to a higher classification, Then initiate the appropriate EPIP.

PAGE 5 OF 10 I

REVISION 27

ALERT EPIP-3 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.7.5 If the conditions warrants termination of the classifications, Then enter EPIP-16, Termination and Recovery Procedure 3.7.6 After the evaluation has been completed, if staffed, Notify the following of the status

"* CECC

"* NRC (ENS)

"* TSC

"* OSC

"* CONTROL RooMis

"* PLANT PA ANNOUNCEMENT 3.7.7 Re-enter this procedural section as conditions warrant at step 3.7 1 or until directed to exit this procedure by steps 3 7.4 or 3.7.5.

3.8 CLOSURE OF THE ALERT 3.8.1 Upon termination of the Notification of Alert, the Shift Manager shall send the completed EPIP-3 and all attachments to Emergency Preparedness (EP).

3.8.2 Upon receipt of completed EPIP-3 and all attachments, Emergency Preparedness shall forward documents for the purpose of documentation storage 4.0 ATTACHMENTS Attachment A - Initial Notification Form Alert Attachment B - Unit 1, Unit Operator Notifications Attachment C - Follow Up Information Form Alert INITL%.l, 1 IME INII LXL'.

TIME PAGE 6 OF 10 REVISION 27

ALERT BROWNS FERRY NUCLEAR PLANT ATTACHMENT A (Page 1 :of 1)

INITIAL NOTIFICATION FORM ALERT L-THIS IS A REAL EVENT THIS IS A DRILL This is N*NAME An ALERT, has been declared at Browns Ferry affecting:

Unit I

[I Unit 2 El[ Unit 3

[] Common Event Declared:

Time --

Date:

EAL Designator.

Brief Description of the Event:

Radiological Conditions:

El-No Abnormal Releases Offsite

-- Airborne Release Offsite

[" Liquid Release'Offsite

[] Release Information Not Known at this time

-- There is no Protective Action Recommendationat this time.

-- Ask "Please repeat the inforination you have recewied to ensure accuracy" PAGE 7 OF 10 REVISION 27

ALERT EPIP-3 BROWNS FERRY NUCLEAR PLANT ATTACHMENT B (Page 1 of 2)

UNIT 1, UNIT OPERATOR NOTIFICATIONS Date:

/

/

NOTES: (1) The Emergency Paging System (EPS) consists of a dedicated touch screen CRT Activation of any screen feature requires the user place their fingertip within the boundary of the select button and leave it there for at least 1 second The CRT Screen will normally display a large rectangle that indicates that the paging system is available but currently inactive (2) If the EPS fails to operate, contact the SM/SED immediately Request that the ODS be contacted to initiate the system from his location If the system fails to operate from the ODS area, then utilize the Weekly Duty List and Call-Out List to manually staff the Emergency Responders, implementing this attachment at step E

1. Activation of the Emergency Paging System (EPS)

A PRESS the EPS CRT Screen once to activate the paging options B

PRESS the appropriate option as instructed by the SED

"* PAGER TEST

"* DRILL

"* EMERGENCY

"* STAGING AREA

"* ABORT C.

PRESS the START Button to initiate the option or ABORT to deny the option request D

MONITOR the Paging System Terminal Display

1.

IF. A "NO" response is observed OR The position being paged has not responded within approximately 20 minutes THEN.. Utilize the Weekly Duty List and attempt to contact the position representative with available information (No Fitness for Duty Question Required) 2 IF. The individual cannot be reached utilizing the Weekly Duty List THEN.

Utilize the Call-Out List and attempt to contact an alternate position representative (Fitness for Duty Question Required)

PAGE 8 OF 10 INITIALS TIME INITIALS TIME INITIALS TIME INITIALS TIME REVISION 27

1.,.'

EPIP-3 BROWNS FERRY NUCLEAR PLANT ATTACHMENT B (Page 2 of 2)

UNIT 1, UNIT OPERATOR NOTIFICATIONS Date:

E Manual Call-Out (N/A step if EPS operates normally) 1 Utilize the current Weelky Duty List and contact positions as listed 2.,

If a position can not be reached from the current Weekly Duty list, then refer to the Call-out List as applicable to fill all vacant positions F.

CONTINUE until all positions have been filled

2. Notify the Unit Supervisors on shift.
3. Notify Nuclear Security Shift Supervisor and state "AN ALERT HAS BEEN DECLARED" and direct to activate EPIP-1 1, Security and Access Control.

INITIALS TIME INITIALS TIME INITIALS TIME INITIALS TIME Plant Extension 3150 or 2219

4.

Notify the Chemistry Lab Supervisor and state "AN ALERT HAS BEEN DECLARED" and direct to implement 2/3-TI-331, Post Accident Sampling Procedure and CI-900 series, Analysis Procedures INITIALS Plant Extension 2367 or 2368

5. Notify the RADCON Shift Supervisor and state "AN ALERT HAS -- -

BEEN DECLARED" and direct to activate EPIP-14, INITIALS Radiological Control Procedure I

Plant Extension 7865 or 3104

6. Notify the "On-Call" NRC Resident and state "AN ALERT HAS BEEN DECLARED," per BFN-EPIP-03 Plant Extension 2572 [Secretary] or from weekly duty list INITIALS PAGE 9 OF 10 ALERT TIME TIME TIME REVISION 27

EPIP-3 BROWNS FERRY NUCLEAR PLANT ATTACHMENT C (Page 1 of 1)

FOLLOW-UP INFORMATION FORM ALERT

[7 THIS IS A REAL EVENT

-] THIS IS A DRILL Note: This form is for conducting Follow-up Information only.

This is at Browns Ferry Name There has been a Alert declared at Browns Ferry affecting, F--

Unit I

[- Unit 2

[U Unit 3 M-Common The Reactor is [7 Shutdown F-At Power Plant Conditions are [E Stable

[F Deteriorating "Follow-Up" Information (e.g, Key Events, Status Changes)

Current Radiological Conditions are:

El-No Abnormal Releases Offsite E-Airborne Release Offsite F-Liquid Release Offsiie E7 Release Information Not Known Additional Rad information. (e g., release duration)

R-There is no Protective Action Recommendation at this time Please repeat the information you have received to ensure accuracy.

The time for this follow up is:

Time:

Date:

SIGNATURE:_

LAST PAGE PAGE 10 OF 10 REVISION 27 ALERT I

TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-4 SITE AREA EMERGENCY REVISION 26 PREPARED BY: T. W. CORNELIUS RESPONSIBLE ORGANIZATION: EMERGENCY PREPAREDNESS APPROVED BY: GILBERT V. LITTLE EFFECTIVE DATE: 08/26/2002 LEVEL OF USE: REFERENCE USE PHONE: 2038 DATE: 08/22/2002 QUALITY-RELATED I I

REVISION LOG Procedure Number:

EPIP-4 Revision Number: 26 Pages Affected: 2,4,8 Description of Change:

IC-31 This change is being conducted to incorporate a manual netlhod of eN acuating on-site, non emergency response personnel during emergency situations. In addition changes to the procedure are being conducted to incorporate the management of NRC Conmnitment changes as prescribed in the correspondence from site licensing RIMS R08000217713. and to human factor the notification and follow-up notification forns.

Page 2 - change to step 3.2 1 in, ohves human factonng the Notification Forn Title.

Page 3- -changes to steps 3.4.1 - 3.4 5 involves information regarding steps for the SED to take wi hen conducting an Accountably/Assembly and EN acuation Page 6 - changes mi oh es removing the "NRC Conimitment Brackets to step requling the review of PORC and the human factoring of applicable steps.

Page 7 - change involves human factoring attachment title.

Page 8 - change involh es human factoring attachment title and modifying inforlnation to ensure consistency with NRC guidance Page 9 - change lnA olves adding information for Unit I Operator regarding ERO staffing support.

Page 10 - updated information for the Unit Operator to use during the ERO staffing process.

Page 11 - change inN olhed adding a clarif* statement concerning the appropriate use of the Follow up Notification Forn IC-32 EPIP-4. re,, ision 25 is being issued to incorporate changes regarding assembly and accountability actions. All actions to initiate the accountability and evacuation processes are now located in EPIP 8 The re ision additionally standardizes telephone numbers, and PORC reviewus. This reision also adds clarification for the actions taken by the Unit 1 Unit Operator during their staffing of the ERO process.

Page 3 - added a statement to the caution infornation regarding security threat. Clarified steps 3.4.1 and 3.4.2 to implelnent EPIP-8 regarding actions to be taken for assembly/accountability and evacuation Page 6 - standardize Site Area Emergency procedure closure infornation Page 8.9 - Clarify actions taken by the Unit I Unit Operator during the notification attachment.

IC-33 EPIP-4. reN ision 26 is being conducted to incorporate changes regarding actions to be taken ilhen dangerous conditions exist on site that mould require the assembly of the ERO at the staging area Additionally page 3 and 5 xwere revised to update telephone information regarding the Office of Radiation Control Page 2 - change instruct the SED wh lien to direct the Unit 1 Unit Operator to assembly the ERO at the staging area.

Page 4 - revision adds clarification to the caution note regarding on-site security conditions for assemnbly/accountability.

Page 8 - revision adds option for staging area I

SITE AREA

'EPIP-4 BROWNS FERRY EMERGENCY h

"4NUCLEAR PLANT 1.0 PURPOSE,,

Y1.1 1 Provide for timely notification of appropriate individuals or organizationswhen the Shift Manager/Site Emergency Director (SED) has determined by EPIP-1 that an incident has occurred which is classified as a SITE AREA EMERGENCY (SAE).

' 4 1.2 Provide for periodic evaluation of the current situation by the Shift Manager/SED

- to dfetermine whether the SAE shoblld'be t~r'minated, c6ntinued, 'or upgraded to a more serious classification.

2.0 SCOPE This procedure applies to emergency events that are classified as Site Area Emergency by "EPIP-1, Ernergendy Classification Procedure-'

4 4'

REVISION 26 1

PAGE I OF 10

SITE AREA EMERGENCY EPIP-4 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS Date:

/

/

3.1 If all Emergency Centers ARE STAFFED, Then :notify the following that a SITE AREA EMERGENCY Ernirgency Classification has been issued and EPIP 4 is being implemented, and 6rntinude in this procedure at Step 3.4. If all Emergency Centers ARE NOT STAFFED, Then N/A this step and continue in this procedure CECC

--]

Control Rooms D

INI1,LS TLMtE TSC E-Plant PA Announcement F-OSC El This is N ALE...

Site Emergency Director, an SAE has, been declared at BFN. we are currently mplementing EPIP-4. Standby for firther updates 3.2 Notification of the Operations Duty Specialist (ODS) & Emergency Responders Note: The ODS should be notified within 5 minutes after the emergency event is declared.

3.2.1 Complete Attachment A (Initial Notification Form).

3.2.2 Activating Emergency Response Organization (ERO) 3.2.2.1 If ongoing/anticipated on-site security events ma present a danger to the emergency responders, Then consult with Nuclear Security.

3.2.2.2 if ongoing/anticipated events present a danger to emergency responders, Then direct the Unit 1 Unit Operator to make notifications per Attachment B and select "Staging Area" as the option for the Emergency Paging System.

3.2.2.3 If there are no ongoing/anticipated danger to emergency responders, Then direct the Unit 1 Unit Operator to make notifications per Attachment B and select as applicable, "Drill" or "Emergency" as the option for the Emergency Paging System.

INITLUS TLmE 1INTtALS TmIE IN-ITLXLS rIME INITLULS TIME PAGE 2 OF 10

"<.2 9-REVISION 26

SITE AREA EMERGENCY EPIP-4 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.2.3 Notify the ODS and Provide the information from Attachment A.

Note:, Utilize the direct ring-downý ODS phone when making this notification or as applicable dial direct ODS Telephdrie Numbers' 5-751-1700, 2495 Tf the ODS cannot be reached within 10 minutes, Then "contact the State of Alabama directly by requesting the Rad Health Duty Officer at:

Day Shift 8 a.m - 5 p m (Central) Holidays-Weekends-Off-Shifts Primary: 9-1-334-206-5391 Montgomery State Trooper Post Backup: 9-1-800-582-1866 9-1-334-242-4378,,

3.2.4 Fax a copy of Attachment A'o i'he *DS for confirmation of information or if the state is contacted directly'.

ODS Fax 5-751-8620 Office of Radiation Control Fax 9-1-334-206-5387 3.2.5 Receive confirmation call from the ODS (to verify notification of the State of Alabama)(NA this step, if the state was contacted directly).,

3.3 NOTIFICATION OF SITE PERSONNEL 3.3.1 Make the following plant P.'A announcement:

THIS IS (NAME), SHIFT MANAGER. A SITE AREA EMERGENCY HAS BEEN DECLARED ON UNIT,..

I HAVE ASSUME D THE DUTIES OF SITE EMERGENCY DIRECTOR., REPORT TOYOUR ASSIGNED EMERGENCY RESPONSE FAC-ILITY' AT THIS TIME.

INITIALS PAGE 3 OF 10 I NITILXS TIME INITrLXL",

t1ME TritE TIME REVISION 26

SITE AREA EMERGENCY EPIP-4 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED)

CAUTION: Do not initiate Assembly and Accountability if.

I A severe weather condition exist or projected on-site, such as a Tornado.

2 An on-site security risk condition exists that may present a danger to site personnel during the assembly/accountability process (Consult with Nuclear Security) 3.4 ACCOUNTABILITY AND EVACUATION OF NON-EMERGENCY RESPONDERS 3.4.1 If Assembly and Accountability has not been conducted, Then, implement EPIP-8, Appendix C concurrently with this procedure. If Accountability has been conducted, Then N/A this step and continue in this procedure at step 342.

3.4.2 If an order to evacuate non-emergency responders has not be issued, Then upon completion of Assembly and Accountability,' initiate the order to evacuate non emergency responders, through the implementation of EPIP-8, Appendix F, concurrently with this procedure. If the order to evacuate non-emergency responders has been conducted, Then continue in this procedure at step 3.5.1.

INITIALS TIME INITIALS TIME 3.5 DOSE ASSESSMENT 3.5.1 Evaluate the need for offsite dose assessment.

(N/A STEP IF NOT APPLICABLE) 3.5.1.1 When offsite dose assessment is required, obtain the information from the CECC when operational 3.5.1.2 If the CECC is not operational, contact the TSC, when staffed, or the RADCON Shift Supervisor and request the implementation of EPIP 14, for dose assessment INITIALS TIME REVISION 26 I___________

PAGE 4 OF 10

SITE AREA',

BROWNS FERRY EMERGENCY EPIPA NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.6 NOTIFICATION OF THE NRC 3.6.1 'Notify the NRC immediately or within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and if requested by the NRC maintain an open and continuous

'INITIALS TIME communications channel.

Note. Utilize the Emergency Notification System (ENS) when making this notification. !Dial the first number listed on the sticker affixed to the ENS telephone, by dialing 9-1 "The Ten DiUjg Number Listed on the ENS Telephones".

If the number is busy, Then select in order, the alternate' numbers until a connection is achieved No access codes are required 3.7 PERIODIC EVALUATION OF THE EVENT 3.7.1 Continue to Evaluate the event using EPIP-1 as conditions warrant 3.7.2 If plant conditions warrant the need for follow up information, Complete the Follow Up Notification Form, Attachment C.

Note: Conditions that warrant this evaluation are 'a's a minimum" when other EAL onditio0hs exist'indi&htin'g the currient emergency classification or significant changes in plant conditions have occurred.

3.7.3 If the CECC is not siaffed, Then notify the ODS and provide follow up' information from the' c6m'pleted Attachment C f&nir Utilize the direct ring-down ODS phone when making this notificatiofih or'as applicable dial direct.

ODS 751-2495, 1700 Note: If the ODS cannot be reached, Then contact the State of Alabama directly by requesting the Rad Health Duty Officer at:

Day Shift 8 a.m - 5 p m (Ceniral Time)

Holidays-Weeken-ds-Off-shifts Primary:

9-1-334-206-5391 Montgomery, State Trooper Post Backup:*

9-1-800-582-1866 9-1-334-242-4378 PAGE 5 OF 10 REVISION 26

SITE AREA EMERGENCY EPIP-4 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.7 PERIODIC EVALUATION OF THE EVENT (CONTINUED) 3.7.4 If the conditions warrants upgrading to a higher classification, Then initiate EPIP-5, General Emergency.

3.7.5 If the conditions warrant termination of the classification, Then enter EPIP-16, Termination and Recovery Procedure.

3.7.6 After the evaluation has been completed, if staffed, Notify the following of the status

"* CECC

"* NRC (ENS)

"* TSC

"* oSC

"* CONTROL Rooxis

"* PLANT PA ANNOUNCEMENT 3.7.7 Re-enter this procedural section as conditions warrant at step 3.7.1 or until directed to exit this procedure by steps 3.7.4 or 3.7.5.

3.8 CLOSURE OF THE SITE AREA EMERGENCY 3.8.1 Upon termination of the Notification of Site Area Emergency, the Shift Manager shall send the completed EPIP-4 and all attachments to Emergency Preparedness (EP).

3.8.2 Upon receipt of completed EPIP-4 and all attachments, Emergency Preparedness shall forward documents for the purpose of documentation storage 4.0 ATTACHMENTS Attachment A - Initial Notification Form Site Area Emergency Attachment B - Unit 1, Unit Operator Notifications Attachment C - Follow Up Information Form Site Area Emergency INITIALS TIME INITIALS TIME REVISION 26 I

PAGE 6 OF 10

SITE AREA EMERGENCY

EPIP-4 BROWNS FERRY NUCLEAR PLANT ATTACHMENT A (Page 1 of 1) k INITIAL NOTIFICATION FORM SITE AREA EMERGENCY

-- THIS IS A REAL EVENT D THIS IS A DRILL T h is is

-,.xf NAME-A SITE AREA EMERGENCY has been declared at BrownsF7rry affecting.

-] Unit 1 r] Unit 2..

Unit 3

] Common Event Declared:'

Time:

Date:

EAL Designator:

Brief Description of the Event:

Radiological Conditions:

F-No Abnormal Releases Offsite F-Airborne Release Offsite F-Liquid Release Offsite.

FI Release Information Not Known at this time FI There is no Protective Action Recommendation at this time..

FI Meteorological conditions are:

Wind Speed:

_____m p.h Wind Direction From:

degre Fl Ask "Please repeat the information you have received to ensure accuracy"

, PAGE 7 OF 10 I

REVISION 26

SITE AREA EMERGENCY EPIP-4 BROWNS FERRY NUCLEAR PLANT ATTACHMENT B (Page 1 of 2)

UNIT 1, UNIT OPERATOR NOTIFICATIONS Date: _

/

NOTES: (1) The Emergency Paging System consists of a dedicated touch screen CRT.

Activation of any screen feature requires the user place their fingertip within the boundary of the select button and leave it there for at least I second The CRT Screen will normally display a large rectangle that indicates that the paging system is available but currently inactive.

(2) If the EPS fails to operate, contact the SM/SED immediately. Request that the ODS be contacted to initiate the system from his location. If the system fails to operate from the ODS area, then utilize the Weekly Duty List and Call-Out List to manually staff the Emergency Responders, implementing this attachment at step E of the Emergency Paging System (EPS).

PRESS the EPS CRT Screen once to activate the paging options.

B.

PRESS the appropriate option

"* PAGER TEST

"* DRILL

"* EMERGENCY

"* STAGING AREA

"* ABORT C.

PRESS the START Button to initiate the option or ABORT to deny the option request.

D MONITOR the Paging System Terminal Display 1

IF.. A "NO" response is observed OR The position being paged has not responded within approximately 20 minutes THEN.. Utilize the Weekly Duty List and attempt to contact the position representative with available information. (No Fitness for Duty Question Required)

2.

IF.. The individual cannot be reached utilizing the Weekly Duty List THEN.. Utilize the Call-Out List and attempt to contact an alternate position representative. (Fitness for Duty Question Required)

PAGE 8 OF 10 INITIALS TIME INITIALS TIME INITIALS TIME INITIALS TIME REVISION 26

1. Activation A.

SITE AREA EMERGENCY SEPIP-4 BROWNS FERRY NUCLEAR PLANT ATTACHMENT B (Page 2 of 2)

UNIT 1, UNIT OPERATOR NOTIFICATIONS Date:

/

/

E:.

Manual Call-Out (N/A step if EPS operates normally)

1.

Utilize the current Weelky Duty List and contact positions as listed.

2 If a position can not be reached from the current Weekly Duty list, then refer to the Call-out List as applicable to fill all vacant positions F.

CONTINUE until all positions have been filled.

2. Notify the Unit Supervisors on shift.
3. Notify Nuclear Security-Shift Supervisor and state "AN SITE AREA EMERGENCY HAS BEEN DECLARED" and di rect to activate EPIP-I1, Security and Access Control.

INITIALS TIME

-INITIALS TIME INITIALS TIME INITIALS TIME Plant Extension 3150 or 2219

4. Notify the Chemistry Lab Supervisor and state "AN SITE AREA EMERGENCY HAS BEEN DECLARED" and direct to INITIALS TIME implement 2/3-TI-331, Post Accident Sampling Procedure and CI-900 series, Analysis Procedures Plant Extension 2367 or 2368
5. Notify the RADCON Shift Supervisor and state "AN SITE AREA INITIALS TIME EMERGENCY HAS BEEN DECLARED" and direct to activate EPIP-14, Radiological Control Procedure.

Plant Extension 7865 or 3104

6.

Notify the "On-Call" NRC Resident and state "AN SITE AREA EMERGENCY HAS BEEN DECLARED".

r -,,

INITIALS TIME 0

Plant Extension 2572 [Secretary] or from weekly duty list REVISION 26 I

PAGE 9 OF 10

SITE AREA EMERGENCY EPIP-4 BROWNS FERRY NUCLEAR PLANT IF-THIS IS A REAL EVI ATTACHMENT C (Page 1 of 1)

FOLLOW-UP INFORIMATION FORIM SITE AREA EMERGENCY ENT Fl THIS IS A DRILL Note: This form is for conducting Follow-up Information only.

This is at Browns Ferry Name There has been a Site Area Emergency declared at Browns Ferry affecting:

E-Unit I F-Unit 2 M-Unit 3

[l Common The Reactor is F-- Shutdown

-] At Power Plant Conditions are F-- Stable

-] Deteriorating "Follow-Up" Information (e g, Key Events, Status Changes)

Current Radiological Conditions are

[-- No Abnormal Releases Offsite F1 Airborne Release Offsite El Liquid Release Offsite F-- Release Information Not Known Additional Rad information- (e g, release duration)

-- There is no Protective Action Recommendation at this time Please repeat the information you have received to ensure accuracy The time for this follow up is.

Time Date.

SIGNATURE:

LAST PAGE PAGE 10 OF 10 L_

REVISION 26

TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-5' GENERAL EMERGENCY REVISION 31 S

I I

PREPARED BY: T. W. CORNELIUS RESPONSIBLE ORGANIZATION EMERGENCY PREPAREDNESS APPROVED BY' GILBERT V LITTLE EFFECTIVE DATE: 08/26/2002 LEV7EL OF USE:, REFERENCE USE QUALITY-RELATED PHONE: 2038 DATE: 08/22/2002

REVISION LOG Procedure Number:

EPIP-5 Revision Number:

31 Pages Affected:

2,4,9 Description of Change:

IC-37 This change is being conducted to incorporate a manual Inethod of evacuating on-site, non emergency response personnel during emergency situations In addition changes to the procedure are being conducted to incorporate the management of NRC Commitment changes as prescribed in the correspondence from site licensing RIMS R08000217713. and to human factor the notification and folloiý-up notification forms.

Page 2 - change to step 3 2.1 involves human factoring the Notification Form Title and revised telephone for Morgan County.

Page 3/4 - changes to steps 3.4.1 - 3.4.5 involves information regarding steps for the SED to take NN hen conducting an Accountably/Assembly and Evacuation.

Page 6 - changes involves removing the "NRC Commitment Brackets to step requiring the review of PORC and the human factonng of applicable steps Page 7 - change involves human factoring attaclmuent title Page 8 - change involves human factoring attachment title.

Page 9 - change involves adding information for Unit I Operator regarding ERO staffing support.

Page 10 - revised to update information supporting Unit I Operator actions regarding ERO staffing support.

Page 11 - revised Protective Action Reconmmendation FloN*chart Page 12 - change involved adding a clarif, statement concerning the appropriate use of the Follow-up Notification Form IC-38 EPIP-4. reN ision 25 is being issued to incorporate changes regarding assembl and accountability actions All actions to initiate the accountability and evacuation processes are now located in EPIP 8 The revision additionally standardizes telephone numbers, and PORC reviewis Tins revision also adds clarification for the actions taken by the Unit 1 Unit Operator dunng their staffing of the ERO process.

Page 3 - added a statement to the caution information regarding security threat Clarified steps 3 4.1 and 3.4.2 to implement EPIP-8 regarding actions to be taken for assemibl./accountabilhtv and evacuation.

Page 6 - standardize Site Area Emergency procedure closure infornation.

Page 8.9 - Clarify actions taken by the Unit 1 Unit Operator during the notification attaclhnent IC-39 EPIP-5. revision 31 is being conducted to incorporate changes regarding actions to be taken hlien dangerous conditions exist on site that would require the assembly of the ERO at the staging area Additionally page 3 and 6 ANere reN ised to update telephone information regarding the Office of Radiation Control.

Page 2 - change instruct the SED when to direct the Unit I Unit Operator to assembly the ERO at the staging area.

Page 4 - revision adds clarification to the caution note regarding on-site security conditions for assemnbly/accountability.

Page 9 - revision adds option for staging area

GENERAL EMERGENCY-

EPIP-5 BROWNS FERRY NUCLEAR PLANT 1.0

PURPOSE,

..1.1

, Provide for timely notification of appropriate individuals or organizations when the

"..Shift Manager/Site Emergency Director (SED) has determined by EPIP-1 that an incident has occurred which is classified as a GENERAL EMERGENCY'(GE) 1.2 Provide for periodic evaluation of the current situation by the Shift Manager/SED

'to determine whether the GE should be terminated, or continued.'

2.0 SCOPE This procedure applies to emergency events that are classified as General Emergency by EPIP-1, Emergency Classification Procedure I'

3' 1

I 1'

2

1'

'.2 PAGE 1 OF 12 I I REVISION 31

GENERAL EMERGENCY EPIP-5 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS Date:

/

/

3.1 If all Emergency Centers ARE STAFFED, Then notify the following that a GENERAL EMERGENCY Emergency Classification has been issued and EPIP 5 is being implemented, and continue in this procedure at Step 3 4 If all Emergency Centers ARE NOT STAFFED, Then N/A this step and continue in this procedure.

Control Rooms D-Plant PA Announcement E-Tliis is NAME. Site Emergency Director. an GE has been declared at BFN. Ai e are currtentlh' implementing EPIP-5 Standby for firther updates

INITLL, TIME 3.2 Notification of the Operations Duty Specialist (ODS) & Erneregency Responders Note The ODS should be notified within 5 minutes after the emergency event is declared 3.2.1 Complete Attachment A (Initial Notification Form).

3.2.2 Activating Emergency Response Organization (ERO) 3.2.2.1 If ongoing/anticipated on-site security events m present a danger to the emergency responders, Then consult with Nuclear Security.

3.2.2.2 If ongoing/anticipated events present a danger to emergency responders, Then direct the Unit I Unit Operator to make notifications per Attachment B and select "Staging Area" as the option for the Emergency Paging System 3.2.2.3 If there are no ongoing/anticipated danger to emergency responders, Then direct the Unit I Unit Operator to make notifications per Attachment B and select as applicable, "Drill" or "Emergency" as the option for the Emergency Paging System I'ITLILLS TLME INITLULS TRIE

INIMTLL, TLnE IN-l L L%,

TIME REVISION 31 CECC TSC OSC D-D-

D-PAGE 2 OF 12

GENERAL EMERGENCY EPIP-5 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.2.3 Notifv the ODS and Provide the information from.

Attachment A IITLXLS TL,.E Note: Utilize the direct ring-down,ODS phone when making this notification or as applicable dial direct.

ODS Telephone Numbers 5-751-1700, 2495 If the ODS cannot be reached within 10 minutes,Then contact the following and Provide the informatioh from Attachment A*

1. Limestone County:

9-232-0111

2. Morgan County:

3.' Lawrence County:

9-1-256-432-2143 9-1-256-974-7641

4. Lauderdale County:

9-1-256-760-9117

5. State of Alabama Rad Health Duty Officer:

a m - 5 p m (Central) 9-1-334-206-5391 9-1-800-582-1866 Holidays-Weekends-Off-Shifts Montgomery State Trooper Post 9-1-334-242-4378 I

3.2.4 Fax a copy of Attachment-A to the ODS for confirmation of information or the state if contacted directly.

  • ...ODS Fax 5-751-8620 Office of Radiation Controf Fax

-: 9-1~3 20 " 3 871 3.2.5 Receive confirmation call from the ODS'(to ýverify notification of the State of Alabama), (N/AI this step if the State Was contacted directly).

PAGE 3 OFI2 INTrI.NAS TIME Day Shift 8 Primary Backup:

INITLALS INITLALS INTrMALS NITIAs TDIE TWIE TIME TIME INITIALS TIME INITIALS TIME REVISION 31

GENERAL EMERGENCY EPIP-5 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.3 NOTIFICATION OF SITE PERSONNEL 3.3.1 Make the following plant P.A announcement:

THIS IS (NAME), SHIFT MANAGER. A GENERAL EMERGENCY HAS BEEN DECLARED ON UNIT

. I HAVE ASSUMED THE DUTIES OF SITE EMERGENCY DIRECTOR. REPORT TO YOUR ASSIGNED EMERGENCY RESPONSE FACILITY AT THIS TIME INITIALS TIME CAUTION: Do not initiate Assembly and Accountability if

1. A severe weather condition exist or projected on-site, such as a Tornado
2. An on-site security risk condition exists that may present a danger to site personnel during the assembly/accountability process (Consult with Nuclear Security).

3.4 ACCOUNTABILITY AND EVACUATION OF NON-EMERGENCY RESPONDERS 3.4.1 If Assembly and Accountability has not been conducted, Then, implement EPIP-8, Appendix C concurrently with this procedure. If Accountability has been conducted, Te continue in this procedure at step 3.4 2 3.4.2 If an order to evacuate non-emergency responders has not be issued, Then upon completion of Assembly and Accountability, Initiate the order to evacuate non emergency responders, through the implementation of EPIP-8, Appendix F, concurrently with this procedure If the order to evacuate non-emergency responders has been conducted, Then continue in this procedure at step 3 5 1 INITIALS TIME INITIALS TIME PAGE 4 OF 12 REVISION 31

GENERAL,

EMERGENCY EPIP-5 BROWNS FERRY, NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.5 DOSE ASSESSMENT 3.5.1 Evaluate the need for offsite dose assessment.

(N/A STEP IF NOT APPLICABLE) 3.5.1.1 When offsite dose assessment is required Obtain the information from the CECC when operational 3.5.1.2, If the CECC is not operational, Contact the TSC, when staffed or the RADCON Shift Supervisor and Request the implementation of EPIP 14, for dose assessment.:

3.6 NOTIFICATION OF THE NRC INITIALS TIME 3.6.1 Notify the NRC immediately or within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and if requested by the NRC maintain an open and continuous, communications channel.

I Note. "'Utilize the Emergency Notification System (ENS) when

,making this notification. Dial the first number listed on the sticker affixed to the ENS telephone, by dialing 9-1 "The Ten Digit Number Listed on the ENS Telephones".

If the number is busy, Then select in order, the alternate numbers until a connection is achieved. No access codes are required 3.7 PROTECTIVE ACTION RECOMMENDATION 3.7.1 If the CECC is not staffed, Then make a Protective Action Recommendation (PAR) using Attachment C.

(This PAR shall be made only by the SED.)

(N/A STEP IF NOT APPLICABLE)

INITIALS TIME SINITIALS TIME I PAGE 5 OF 12 I

REVISION 31

GENERAL EMERGENCY EPIP-5 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.8 PERIODIC EVALUATION OF THE EVENT 3.8.1 Continue to Evaluate the event using EPIP-1 as conditions warrant 3.8.2 If plant conditions warrant the need for follow-up information, Complete the Follow-Up Notification Form, Attachment D.

Note: Conditions that warrant this evaluation are as a minimum when other EAL conditions exist indicating the current emergency classification or significant changes in plant conditions have occurred 3.8.3 If the CECC is not staffed, Then notify the ODS and provide follow up information from the completed Attachment D form. Utilize the direct ring-down ODS phone when making this notification or as applicable dial direct ODS 751-2495, 1700 Note: If the ODS cannot be reached, Then contact the State of Alabama directly by requesting the Rad Health Duty Officer at:

Day Shift 8 a.m - 5 p m (Central Time)

Primary.

9-1-334-206-5391 Backup 9-1-800-582-1866 Holidays-Weekends-Off-shifts Montgomery State Trooper Post 9-1-334-242-4378 3.8.4 If the conditions warrant termination of the classification, Then enter EPIP-16, Termination and Recovery Procedure.

3.8.5 After the evaluation has been completed, if staffed, Notify the following of the status:

"* CECC

"* NRC (ENS)

"* TSC

"* OSC

"* CONTROL Roois

"* PLANT PA ANNOLUNCEMENT 3.8.6 Re-enter this procedural section as conditions warrant at step 3 8 1 or until directed to exit this procedure by steps 3 8 4.

REVISION 31 PAGE 6 OF 12

GENERAL' EMERGENCY EPIP-5 BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.9 CLOSURE OF THE GENERAL EMERGENCY 3.9.1 Upon termination of the Notification of General Emergency, the Shift Manager shall send the completed EPIP-5 and all attachments to Emergency Preparedness (EP).

3.9.2 Upon receipt of completed EPIP-5 and all attachments, Emergency Preparedness shall forward documents for the purpose of documentation storage.

INITIALS TIME INITIALS TIME 4.0 ATTACHMENTS Attachment A - Initial Notification Form General Emergency Attachment B - Unit 1, Unit Operator Notifications Attachment C - Protective Action Recommendations Attachment D - Follow Up Information Form General Emergency

,(

'V

'1 REVISION 31 PAGE 7 OF 12

GENERAL EMERGENCY EPIP-5 BROWNS FERRY NUCLEAR PLANT ATTACHMENT A (Page 1 of 1)

INITIAL NOTIFICATION FORM GENERAL EMERGENCY R-THIS IS A REAL EVENT

[-- THIS IS A DRILL This is There has been a GENERAL EMERGENCY declared at Browns Ferry affecting FI Unit 1

[-- Unit 2 Event Declared

[:- Unit 3 Time-F1-Common Date:

EAL Designator:

Brief Description of the Event Radiological Conditions:

E-No Abnormal Releases Offsite L-Airborne Release Offsite El[ Liquid Release Offsite

[-

Release Information Not Known at this time The following Protective Action Recommendation is provided F-1 Recommendation I - Evacuate 2 mile radius and 10 miles downwind and shelter remainder of 10 mile EPZ.

El Recommendation 2 - Evacuate 2 mile radius and 5 miles downwind and shelter remainder of 10 mile EPZ Meteorological Conditions are:

Wind Speed m.p h.

Wind Direction From-degrees I1 Ask, "Please repeat the information you have received to ensure accuracy" REVISION 31 I

PAGE 8 OF 12

GENERAL EMERGENCY EPIP:-5 BROWNS FERRY NUCLEAR PLANT ATTACHMENT B (Page 1 of 2)

UNIT 1, UNIT OPERATOR NOTIFICATIONS Date:

/

NOTES: (1) The Emergency Paging System consists of a dedicated touch screen CRT.

Activation of any screen feature requires the user place their fingertip within the boundary of the select button and leave it there'for at least I second. The CRT Sdreen will normally display a large rectangle that indicates that the paging system is available but'currently inactive (2) If the EPS fails to operate, contact the SM!SED immediately. Request that the ODS be contacted to initiate the system from his location. If the system fails to operate from the ODS area, then utilize the Weekly Duty List and Call-Out List to manually staff the Emergency Responders,,implementing this attachment at step E.

1. Activation of the Emergency Paging System (EPS).

ý,,1 A

PRESS the EPS CRT Screen once to activate the paging options.

B PRESS the appropriate option

  • PAGER TEST 0 DRILL 0 EMERGENCY STAGING AREA ABORT INITIALS TIME INITIALS TIME C.

PRESS the START Button to initiate the option or ABORT to deny the option request INITIALS TIME D.

MONITOR the Paging System Terminal Display

1.

IF.. A"NO" response is observed

. INITIALS TIME OR The position being paged has not'resporided within approximately 20 minutes THEN...' Utilize'the Weekly Duty List and attempt to contact the position representative with, available information. (No Fitness for Duty Question Required),

2 IF... The individual cannot be reached utilizing the Weekly Duty List THEN.. Utilize the Call-Out List and attempt to contact an alternate position representative (Fitness for Duty Question.

Required)

PAGE 9 OF 12 REVISION 31

GENERAL EMERGENCY EPIP-5 BROWNS FERRY NUCLEAR PLANT ATTACHMENT B (Page 2 of 2)

UNIT 1, UNIT OPERATOR NOTIFICATIONS Date:

/

/

E.

Manual Call-Out (N/A step if EPS operates normally)

I Utilize the current Weelky Duty List and contact positions as listed.

2 If a position can not be reached from the current Weekly Duty list, then refer to the Call-out List as applicable to fill all vacant positions F.

CONTINUE until all positions have been filled.

2. Notify the Unit Supervisors on shift
3. Notify Nuclear Security Shift Supervisor and state "A GENERAL EMERGENCY HAS BEEN DECLARED" and direct to activate EPIP-11, Security and Access Control 0

Plant Extension 3150 or 2219

4. Notify the Chemistry Lab Supervisor and state "A GENERAL EMERGENCY HAS BEEN DECLARED" and direct to implement 2/3-TI-33 1, Post Accident Sampling Procedure and CI-900 series, Analysis Procedures.

Plant Extension 2367 or 2368

5. Notify the RADCON Shift Supervisor and state "A GENERAL EMERGENCY HAS BEEN DECLARED" and direct to activate EPIP-14, Radiological Control Procedure Plant Extension 7865 or 3104
6. Notify the "On-Call" NRC Resident and state "A GENERAL EMERGENCY HAS BEEN DECLARED".

Plant Extension 2572 [Secretary] or from weekly duty list INITIALS TIME INITIALS TIME INITIALS TIME PAGE 10 OF 12 INITIALS TIME INITIALS TIME INITIALS TIME INITIALS TIME REVISION 31

GENERAL' EMERGENCY.'

'-EPIR-75 BROWNS FERRY,

NUCLEAR PLANT

ý ATTACHMENT C (Page 1 'of 1)

PROTECTIVE ACTION RECOMMENDATIONS Note 1: If conditions are unknowxn utilizing the floichart, then answer NO I4, I

(e'n'er afl Ene r g e n c y Declared '

S~Greater than PAG Tal 1 Limis 4'

1 i-'.

¶ I 1','

1 A

L PAGE 11 OF 12 R

S 31 REVISION 31 CONTINUE-ASSESSMENT

  • 'Modifyp'rotective' actiofis based on available plant and field monitoring information.
  • Locate and evaluate localized hot spots. "

I I'

RECOMMENDATION 1 EVACUATE 2 milis radius' and 10 miles downwind AND SHELTER remainder-of

---10 mile EPZ RECOMMENDATION 2-.

SEVACUATE-2' mile radiu's and 5 miles downwind AND SHELTER remainder of

.10 mile EPZ Protective Action Guides TYPE LIMIT I

Measured 3.9E-6 micro Ci/cc of Iodine 131 or 1,REM/hr External Dose Projected 1 REM TEDE or 1 5 REM Thyroid CDE I

1.

- I o,

I

GENERAL EMERGENCY EPIP-5 BROWNS FERRY NUCLEAR PLANT ATTACHMENT D (Page 1 of 1)

FOLLOW-UP INFORNIATION FORM GENERAL EMERGENCY

[] THIS IS A REAL EVENT D-THIS IS A DRILL Note: This form is for conducting Follow-up Information only This is at Browns Ferry.

Name There has been a General Emergency declared at Browns Ferry affecting:

-- Unit I EI Unit 2

[-- Unit 3 r-Common The Reactor is I] Shutdown Plant Conditions are -- Stable FI-At Power I-Deteriorating "Follow-Up" Information (e g., Key Events, Status Changes, Status of any Plant Evacuations)

Current Radiological Conditions are:

[-] No Abnoimal Releases Offsite

[-] Airborne Release Offsite Liquid Release Offsite

-- Release Information Not Known Additional Rad information: (e g., release duration)

The current meteorological conditions from the site are.

Wind Speed _

, Wind Direction from The following Protective Action Recommendation is provided

-I Recommendation 1

-- Recommendation 2 Please repeat the information you have received to ensure accuracy The time for this follow up is Time Date SIGNATURE:_________

LAST PAGE PAGE 12 OF 12 REVISION 3) 1

/

TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-11 SECURITY AND ACCESS CONTROL REVISION 9 PREPARED BY: TIM CORNELIUS RESPONSIBLE ORGANIZATION: EMERGENCY PREPAREDNESS APPROVED BY-GILBERT V. LITTLE EFFECTIVE DATE. 08/26/2002 LEVEL OF USE: REFERENCE USE PHONE-2038 DATE. 08/22/2002 QUALITY-RELATED

REVISION LOG Procedure Number:

EPIP-II Revision Number:

9 Pages Affected:

All Pagination Pages:

NONE Description of Change:

EC-11 This change is being conducted to human factor the Rev'ision Log. Description of Change and added clarification to revision log effecting rev 8 EPIP II was revised re-format procedure and remove Security Checklist items, placing them into EPIP-6.

EPIP 11 (rev log) was changed to reflect the current revision level.

Pages 1-2. revised Shift Operations Supervisor title to Shift Manager and Shift Operations Supervisor Clerk to Unit 1 Unit Operator Additionally incorporated checklist items from procedure to EPIP-6. Activation and Operation of the Technical Support Center. This is a general revision to EPIP-1 I IC-12 EPIP-1 I is being revised update and clarif. information. The procedure is be conduct primarilb due to EPIP-8 revision 15 The is a general revision to EPIP-l 1.

/

SECURITY AND ACCESS BROWNS FERRY CONTROL rEPIP-1 I NUCLEAR PLANT SECURITY AND ACCESS CONTROL 1.0 PURPOSE To provide access control for the Browns Ferry Site during a Radiological Emergency.

2.0 SCOPE Provide for implementation of a predetermined security and access control plan for an NOTIFICATION OF UNUSUAL EVENT, ALERT, SITE AREA EMERGENCY, or GENERAL EMERGENCY 3.0 INSTRUCTIONS 3.1 General 3.1.1 -,The Nuclear Security (NS) Shift Supervisor,,when notified by the Shift Manager or Unit 1 Unit Operator that an emergency has been declared will report immediately to the Technical Support Center (TSC) and fill the position of Nuclear Security Manager until relieved by the on-call manager, unless the emergency involves a security event. If the emergency involves a security event the Nuclear Security Manager position will be filled through the staffing of the emergency response organization.

3.2 Access Control 3.2.1 Access control is primarily describe in EPIP-8 "Personnel Accountability and Evacuation". During the implementation of EPIP-8 or as directed by the Site Emergency Director, Nuclear Security will provide the following functions

"* Control and Restrict access to the Owner Controlled Area (OCA) and Protected Area (PA) as applicable, except for those individuals designated for emergency response, per the Emergency Access List or as authorized for emergency response by the Site Emergency Director.

"* Establish OCA road blocks and on-site traffic control

"* Dispatch officers as applicable to search the OCA and PA for the implementation of EPIP-8.

"* Conduct periodic radio or telephone checks with Nuclear Security Shift Supervisor or his designee, by all officers assigned to a post.

"* Report as applicable results of Assembly/Accountability and Evacuation to the Site Emergency Director.

"* Provide instructions to personnel on-site regarding assembly locations and evacuation information PAGE 1 OF 2 REVISION 9

SECURITY AND ACCESS CONTROL EPIP-1I BROWNS FERRY NUCLEAR PLANT 3.0 INSTRUCTIONS (CONTINUED) 3.2.2 All emergency vehicles and corresponding personnel including the RADCON monitoring van will be permitted immediate or expedited access The Site Emergency Director or TSC Nuclear Security Manager will be made knowledgeable of any emergency vehicle entering the OCA during a emergency 3.2.3 Following the termination of the emergency, Nuclear Security will be relieved from emergency duties by the Site Emergency Director or the Nuclear Security Shift Supervisor at which time, officers will resume their normal duties 3.3 Accountability and Evacuation If Accountability or Evacuation is conducted, security shall monitor the processes and report information in accordance with EPIP-8, "Personnel Accountability and Evacuation Procedure."

4.0 ATTACHMENTS None LAST PAGE PAGE 2 OF 2 REVISION 9