Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham. Alabama 35201-1295 Tel 205 992 5000 SOUTHERNAN COMPANY Energy to Serve Your World'"
LCV-1593-H Docket Nos 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen.
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - AUGUST 2002 Enclosed are the August 2002 monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.
Sincerely, iffrey T. Gasser JTG/JLL Enclosures El-VEGP Unit 1 Monthly Operating Report - August 2002 E2-VEGP Unit 2 Monthly Operating Report - August 2002 cc:
Southern Nuclear Operating Company Mr. M. Sheibani SNC Document Management U. S Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, Project Manager, NRR q7 Mr. J. Zeiler, Senior Resident Inspector, Vogtle
ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT I MONTHLY OPERATING REPORT FOR AUGUST 2002 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-i UNIT SHUTDOWNS and NARRATIVE REPORT Page E1-2
OPERATING DATA REPORT Docket No, Unit Name Date Completed By Telephone:
50-424 VEGP UNIT 1 September 1, 2002 Andrew R Cato (706) 826-3823 Operating Status
- 1. Reporting Period
- 2. Design Electrical Rating (Net MWe)"
3 Maximum Dependable Capacity (Net MWe):
4 Number Of Hours Reactor Was Cntical 5 Hours Generator On Line 6 Unit Reserve Shutdown Hours 7 Net Electrical Energy Generated (MWHe)
August -2002 1169 1148 This Month 744 0 744 0 0.0 860,195 Year-To-Date 4783 0 4721.1 0.0 5,471,886 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No Event Description NIA N/A N/A El-1 Cumulative 119,3925 117,8737 0.0 131,917,952
UNIT SHUTDOWNS Reporting Period:
Docket No.:
Unit Name Date Completed By Telephone, 50-424 VEGP UNIT 1 September 1, 2002 Andrew R Cato (706) 826-3823 August -2002 Type Method of F: Forced Duration Shutting CauselCorrective Actions No Date S Scheduled (Hours)
Reason (1)
Down (2)
Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON (2) METHOD A - Equipment Failure (Explain)
E - Operator TraininglLicense Examination
- 1. Manual
- 4. Continuation B - Maintenance or Test F - Administrative 2 Manual Trip/Scram
- 5. Other C - Refueling G - Operational Error (Explain) 3 Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)
CAUSEICORRECTIVE ACTIONICOMMENTS:
EVENT CAUSE CORRECTIVE ACTION CRITICAL PATH WAS NARRATIVE REPORT August 01, 2002 00 00 Unit 1 at 100% power with no significant operating problems August 06, 2002 21 02 Unit 1 began derate to 80% power to repair condenser tube leak August 08, 2002 13 00 Unit 1 returned to 100% power after condenser waterbox work August 31, 2002 23 59 Unit 1 at 100% power with no significant operating problems El-2
ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR AUGUST 2002 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2
OPERATING DATA REPORT Docket No, Unit Name:
Date Completed By Telephone 50-425 VEGP UNIT 2 September 1, 2002 Andrew R Cato (706)826-3823 Operating Status Reporting Period:
Design Electrical Rating (Net MWe)
Maximum Dependable Capacity (Net MWe)
Number Of Hours Reactor Was Critical Hours Generator On Line.
Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWHe)
August-2002 1169 1149 This Month 744 0 744 0 00 863,597 Year-To-Date 5831 0 5831.0 00 6,837,704 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES E2-1
- 1.
- 2.
- 3.
4 5
6 7.
Cumulative 106,8848 106,071 7 00 119,630,170 Date Tag No Event Description N/A N/A N/A
Docket No.:
Unit Name*
Date Completed By:
Telephone, Reporting Period:
50-425 VEGP UNIT 2 September 1, 2002 Andrew R Cato (706)826-3823 August - 2002 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.
Date S. Scheduled (Hours)
Reason (1)
Down (2)
Comments N/A N/A N/A N/A NIA N/A N/A (1) REASON (2) METHOD A - Equipment Failure (Explain)
E - Operator Training/License Examination
- 1. Manual
- 4. Continuation B - Maintenance or Test F - Administrative 2 Manual Trip/Scram
- 5. Other C - Refueling G - Operational Error (Explain) 3 Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)
CAUSE/CORRECTIVE ACTIONICOMMENTS:
EVENT CAUSE CORRECTIVE ACTION CRITICAL PATH WAS*
NARRATIVE REPORT August 01, 2002 00 00 Unit 2 at 100% power with no significant operating problems August 31, 2002 23:59 Unit 2 at 100% power with no significant operating problems E2-2