ML022680031

From kanterella
Jump to navigation Jump to search
August 2002 Monthly Operating Report for Vogtle Units 1 & 2
ML022680031
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/25/2002
From: Gasser J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LCV-1593-H
Download: ML022680031 (7)


Text

.

Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham. Alabama 35201-1295 Tel 205 992 5000 SOUTHERNAN COMPANY Energy to Serve Your World'"

LCV-1593-H Docket Nos 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen.

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - AUGUST 2002 Enclosed are the August 2002 monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.

Sincerely, iffrey T. Gasser JTG/JLL Enclosures El-VEGP Unit 1 Monthly Operating Report - August 2002 E2-VEGP Unit 2 Monthly Operating Report - August 2002 cc:

Southern Nuclear Operating Company Mr. M. Sheibani SNC Document Management U. S Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, Project Manager, NRR q7 Mr. J. Zeiler, Senior Resident Inspector, Vogtle

ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT I MONTHLY OPERATING REPORT FOR AUGUST 2002 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-i UNIT SHUTDOWNS and NARRATIVE REPORT Page E1-2

OPERATING DATA REPORT Docket No, Unit Name Date Completed By Telephone:

50-424 VEGP UNIT 1 September 1, 2002 Andrew R Cato (706) 826-3823 Operating Status

1. Reporting Period
2. Design Electrical Rating (Net MWe)"

3 Maximum Dependable Capacity (Net MWe):

4 Number Of Hours Reactor Was Cntical 5 Hours Generator On Line 6 Unit Reserve Shutdown Hours 7 Net Electrical Energy Generated (MWHe)

August -2002 1169 1148 This Month 744 0 744 0 0.0 860,195 Year-To-Date 4783 0 4721.1 0.0 5,471,886 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No Event Description NIA N/A N/A El-1 Cumulative 119,3925 117,8737 0.0 131,917,952

UNIT SHUTDOWNS Reporting Period:

Docket No.:

Unit Name Date Completed By Telephone, 50-424 VEGP UNIT 1 September 1, 2002 Andrew R Cato (706) 826-3823 August -2002 Type Method of F: Forced Duration Shutting CauselCorrective Actions No Date S Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON (2) METHOD A - Equipment Failure (Explain)

E - Operator TraininglLicense Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative 2 Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain) 3 Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSEICORRECTIVE ACTIONICOMMENTS:

EVENT CAUSE CORRECTIVE ACTION CRITICAL PATH WAS NARRATIVE REPORT August 01, 2002 00 00 Unit 1 at 100% power with no significant operating problems August 06, 2002 21 02 Unit 1 began derate to 80% power to repair condenser tube leak August 08, 2002 13 00 Unit 1 returned to 100% power after condenser waterbox work August 31, 2002 23 59 Unit 1 at 100% power with no significant operating problems El-2

ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR AUGUST 2002 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2

OPERATING DATA REPORT Docket No, Unit Name:

Date Completed By Telephone 50-425 VEGP UNIT 2 September 1, 2002 Andrew R Cato (706)826-3823 Operating Status Reporting Period:

Design Electrical Rating (Net MWe)

Maximum Dependable Capacity (Net MWe)

Number Of Hours Reactor Was Critical Hours Generator On Line.

Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWHe)

August-2002 1169 1149 This Month 744 0 744 0 00 863,597 Year-To-Date 5831 0 5831.0 00 6,837,704 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES E2-1

1.
2.
3.

4 5

6 7.

Cumulative 106,8848 106,071 7 00 119,630,170 Date Tag No Event Description N/A N/A N/A

Docket No.:

Unit Name*

Date Completed By:

Telephone, Reporting Period:

50-425 VEGP UNIT 2 September 1, 2002 Andrew R Cato (706)826-3823 August - 2002 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.

Date S. Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A NIA N/A N/A (1) REASON (2) METHOD A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative 2 Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain) 3 Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/CORRECTIVE ACTIONICOMMENTS:

EVENT CAUSE CORRECTIVE ACTION CRITICAL PATH WAS*

NARRATIVE REPORT August 01, 2002 00 00 Unit 2 at 100% power with no significant operating problems August 31, 2002 23:59 Unit 2 at 100% power with no significant operating problems E2-2