Termination of Review Best Estimate Small Break Loss-of-Coolant Analysis Methodology
ML022670798
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 09/25/2002
From: Milano P
NRC/NRR/DLPM/LPD1
To: Kansler M
Entergy Nuclear Operations
Milano, P , NRR/DLPM, 415-1457
References
TAC MB2987
Download: ML022670798 (6)


Text

September 25, 2002 Mr. Michael R. Kansler Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 - TERMINATION OF REVIEW RE: BEST ESTIMATE SMALL BREAK LOSS-OF-COOLANT ANALYSIS METHODOLOGY (TAC NO. MB2987)

Dear Mr. Kansler:

By letter dated August 29, 2001, Consolidated Edison Company of New York, Inc. (Con Edison) requested that the U.S. Nuclear Regulatory Commission (NRC) review the small break loss-of-coolant accident (LOCA) evaluation methodology for the Indian Point Nuclear Generating Unit No. 2 (IP2). This methodology was detailed in Westinghouse Report, WCAP-14936, Code Qualification Document for Best Estimate Small Break LOCA Analysis (Proprietary). On September 6, 2001, the license for IP2 was transferred from Con Edison to Entergy Nuclear IP2 and Entergy Nuclear Operations, Inc. (Entergy). By letter dated September 20, 2001, Entergy requested that the NRC continue to review and act upon all requests before the Commission which had been submitted by Con Edison.

In September 2001, the NRC staff discussed the scope of the review effort and the typical level of effort required by the staff and its contractor to complete this review. On the basis of the information, Entergy requested that the staff suspend, until further notice, the review of the methodology pending budgetary consideration and the resolution of certain contractual issues between Entergy and Con Edison. Since Entergy has not requested to date that the NRC restart its review of the best estimate small break LOCA evaluation methodology, the staff has decided to close out this action. Entergy will need to inform the staff in writing if it should desire that the review be reinitiated.

Sincerely,

/RA/

Patrick D. Milano, Sr. Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-247 cc: See next page

September 25, 2002 Mr. Michael R. Kansler Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 - TERMINATION OF REVIEW RE: BEST ESTIMATE SMALL BREAK LOSS-OF-COOLANT ANALYSIS METHODOLOGY (TAC NO. MB2987)

Dear Mr. Kansler:

By letter dated August 29, 2001, Consolidated Edison Company of New York, Inc. (Con Edison) requested that the U.S. Nuclear Regulatory Commission (NRC) review the small break loss-of-coolant accident (LOCA) evaluation methodology for the Indian Point Nuclear Generating Unit No. 2 (IP2). This methodology was detailed in Westinghouse Report, WCAP-14936, Code Qualification Document for Best Estimate Small Break LOCA Analysis (Proprietary). On September 6, 2001, the license for IP2 was transferred from Con Edison to Entergy Nuclear IP2 and Entergy Nuclear Operations, Inc. (Entergy). By letter dated September 20, 2001, Entergy requested that the NRC continue to review and act upon all requests before the Commission which had been submitted by Con Edison.

In September 2001, the NRC staff discussed the scope of the review effort and the typical level of effort required by the staff and its contractor to complete this review. On the basis of the information, Entergy requested that the staff suspend, until further notice, the review of the methodology pending budgetary consideration and the resolution of certain contractual issues between Entergy and Con Edison. Since Entergy has not requested to date that the NRC restart its review of the best estimate small break LOCA evaluation methodology, the staff has decided to close out this action. Entergy will need to inform the staff in writing if it should desire that the review be reinitiated.

Sincerely,

/RA/

Patrick D. Milano, Sr. Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-247 cc: See next page DISTRIBUTION:

PUBLIC R. Laufer S. Little OGC PDI-1 R/F R. Caruso, SRXB BPlatchek, RI S. Richards P. Milano ACRS ADAMS ACCESSION NO.: ML022670798 OFFICE PDI-1\PM PDI-1\LA SRXB\SC PDI-1\SC NAME PMilano SLittle RCaruso PTam for RLaufer DATE 09/25/02 09/25/02 09/25/02 09/25/02 Official Record Copy

Indian Point Nuclear Generating Station Unit 2 Mr. Jerry Yelverton Ms. Charlene Fiason Chief Executive Officer Manager, Licensing Entergy Operations Entergy Nuclear Operations, Inc.

1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. Fred Dacimo Mr. John McCann Vice President - Operations Manager, Nuclear Safety and Licensing Entergy Nuclear Operations, Inc. Indian Point Nuclear Generating Unit 2 Indian Point Nuclear Generating Units 1 & 2 295 Broadway, Suite 1 295 Broadway, Suite 1 P. O. Box 249 P.O. Box 249 Buchanan, NY 10511-0249 Buchanan, NY 10511-0249 Mr. Harry P. Salmon, Jr.

Mr. Robert J. Barrett Director of Oversight Vice President - Operations Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. 440 Hamilton Avenue Indian Point Nuclear Generating Units 3 White Plains, NY 10601 295 Broadway, Suite 3 P.O. Box 308 Mr. John M. Fulton Buchanan, NY 10511-0308 Assistant General Counsel Entergy Nuclear Operations, Inc.

Mr. Dan Pace 440 Hamilton Avenue Vice President Engineering White Plains, NY 10601 Entergy Nuclear Operations, Inc.

440 Hamilton Avenue Mr. Thomas Walsh White Plains, NY 10601 Secretary - NFSC Entergy Nuclear Operations, Inc.

Mr. James Knubel Indian Point Nuclear Generating Unit 2 Vice President Operations Support 295 Broadway, Suite 1 Entergy Nuclear Operations, Inc. P. O. Box 249 440 Hamilton Avenue Buchanan, NY 10511-0249 White Plains, NY 10601 Regional Administrator, Region I Mr. Lawrence G. Temple U.S. Nuclear Regulatory Commission General Manager Operations 475 Allendale Road Entergy Nuclear Operations, Inc. King of Prussia, PA 19406 Indian Point Nuclear Generating Unit 2 295 Broadway, Suite 1 Senior Resident Inspector, Indian Point 2 P.O. Box 249 U. S. Nuclear Regulatory Commission Buchanan, NY 10511-0249 295 Broadway, Suite 1 P.O. Box 38 Mr. John Kelly Buchanan, NY 10511-0038 Director of Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

Indian Point Nuclear Generating Station Unit 2 Mr. William M. Flynn, President Alex Matthiessen New York State Energy, Research, and Executive Director Development Authority Riverkeeper, Inc.

17 Columbia Circle 25 Wing & Wing Albany, NY 12203-6399 Garrison, NY 10524 Mr. J. Spath, Program Director Paul Leventhal New York State Energy, Research, and The Nuclear Control Institute Development Authority 1000 Connecticut Avenue NW 17 Columbia Circle Suite 410 Albany, NY 12203-6399 Washington, DC, 20036 Mr. Paul Eddy Karl Copeland Electric Division Pace Environmental Litigation Clinic New York State Department 78 No. Broadway of Public Service White Plains, NY 10603 3 Empire State Plaza, 10th Floor Albany, NY 12223 Jim Riccio Greenpeace Mr. Charles Donaldson, Esquire 702 H Street, NW Assistant Attorney General Suite 300 New York Department of Law Washington, DC 20001 120 Broadway New York, NY 10271 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Ray Albanese Executive Chair Four County Nuclear Safety Committee Westchester County Fire Training Center 4 Dana Road Valhalla, NY 10592 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue Mail Stop: L-ENT-15E New Orleans, LA 70113