V.C. SUMMER NUCLEAR STATION NRC JOB PERFORMANCE MEASURE JPS-006 Pressurizer Level Malfunction (NRC)

Revision No. 3

0 O

PAGE 0 iI Pressurizer Level Malfunction (NRC)

IIi III II I

TRAINEE EVALUATOR li EVALUATOR SIGNATURE DATE il Ii il EVALUATION METHOD:

PERFORM EVALUATION LOCATION:

SIMULATOR.

iI ESTIMATED TIME:

15.0 MINUTES TIME STARTED:

10CFR55.45(a)4 IDENTIFY THE INSTRUMENTATION SYSTEMS AND THE SIGNIFICANCE OF FACILITY INSTRUMENT READINGS ii TIME CRITICAL:

No FAULTED JPM:

No II II II TRAINEE PERFORMANCE:

SATISFACTORY UNSATISFACTORY i_

II II I,

ItI I

READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE II INITIATING CUES.

I WILL DESCRIBE GENERAL CONDITIONS UNDER WHICH THIS TASK Ii IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK.

BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES.

II WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS SJOB PERFORMANCE MEASURE WILL BE SATISFIED.

i INITIAL CONDITIONS:

1. Plant is operating at 100% power with all conditions stable.

TOOLS AND EQUIPMENT NEEDED:

NONE REFERENCED DOCUMENTS:

REV DATE

1.

AOP*401.6 PRESSURIZER LEVEL CONTROL AND 08/22/95 PROTECTION CHANNEL FAILURE

2.

SOP*102 CHEMICAL AND VOLUME CONTROL SYSTEM 10/22/97 TASK STANDARDS:

1.

PZR HTRS and letdown re-established.

2.

Letdown relief is not lifted.

PAGE 1

!i Pressurizer Level Malfunction (NRC)

I' I

INITIATING CUES:

1. Respond to pressurizer annunciators.

TERMINATING CUES:

1. Operable channel selected.
2.

Bistable tripped.

3.

Letdown restored.

SAFETY CONSIDERATIONS:

NONE

JOB PERFORMANCE MEASURE CHECKLIST (S)

DENOTES SEQUENCED ELEMENT

(*)

DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:

SAT.

UNSAT.

iNOTE 1: Steps 1 and 2 are izmediate operator actions.

STEP S 1.

Verify instrument failure by comparing suspect channel level indication and level recorder to other two channels.

STEP S*2. On pressurizer level control switch, select the position which has two operable channels.

STANDARD Compares LI-459 to LI-460 and LI-461 and recognizes that LI-459 has failed to 0%

level.

STANDARD Positions the PZR level control switch to the 460 - 461 position.

COMMENTS:

STEP

3.

Select operable channel on the pressurizer level recorder.

STANDARD Verifies the pressurizer level recorder position switch channel 460.

iNOTE 4:

Critical if FCV-122 not full closed.

STEP

  • 4.

Ensure FCV-122 is in ianual and closed.

(SOP-102.

IV L)

STANDARD Positions FCV-122 in MANUAL and reduces the demand signal to zero.

Observes FI-122 charging flow goes to zero.

COMMENTS:

PAGE 2

0 0

JOB PERFORMANCE MEASURE CHECKLIST (S)

DENOTES SEQUENCED ELEMENT

(*)

DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:

PAGE 3 SAT.

UNSAT.

STEP

5.

Ensure PZR level is greater than 18%.

STANDARD Checks LI-460 & LI-461 to verify PZR level is greater than 18%.

iNOTE 6:

Only critical if valve is not opened enough to prevent letdown relief from lifting.

STEP STANDARD

  • 6 Place PCV-145 in manual and Positions PCV-145, controller to MANUAL open to 70%.

and increases the demand signal to 70%.

COMM=NTS:

STEP STANDARD

7.

Open TCV-144 for maximum CCW Places TCV-144, CC TO LTDN HX, in MAN flow to Letdown HX.

and adjusts to 100% demand.

STEP STANDARD

8.

Align letdown flow to the VCT.

Positions TCV-143, LTDN TO VCT OR DEMIN, to the VCT position.

STEP STANDARD 9

Open PVT-8152 letdown line Verifies PVT-8152, LETDOWN LINE ISOL, isolation indicates red light ON green light OFF.

iNOTE 10:

LCV-460 should already be open.

STEP

  • 10.

Open LCV-459 and LCV-460 letdown line isolation valve STANDARD LCV-459 and LCV-460 indicate red light ON, green light OFF.

JOB PERFORMANCE MEASURE CHECKLIST (S)

DENOTES SEQUENCED ELEMENT

(*)

DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:

PAGE 4 SAT.

UNSAT.

COMMENTS:

STEP

11.

Ensure Charging Line Isolation Valves are open.

iNOTE 12:

Cue examinee to establish 105 STEP S*12. Establishes 60 gpm charging flow STANDARD MVG-8107 and MVG-8108 indicate ON, green light OFF.

gpm letdown flow.

red ligth c d//

STANDARD Slowly opens FCV-122, CHG FLOE establish 60 gpm flow on FI-122 COMETS:

STEP

"-13.

Open PVT-8149A and one of the following PVT-8149B or PVT-8149C.

STANDARD PVT-8149A and PVT-8149B or C indicate red light ON green light OFF.

COMMENTS:

0 0

JOB PERFORMANCE MEASURE CHECKLIST (S)

DENOTES SEQUENCED ELEMENT

(*)

DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:

PAGE 5 SAT.

UNSAT.

STEP

"*14.

Open FCV-122 charging flow, as needed to maintain Regenerative Hx outlet between 250*F and 350*F and maintain Pzr level.

STANDARD Increases or decreases the demand signal on the FCV-122 controller to maintain Regenerative Hx outlet between 2 5 0 *F and 350*F and Pzr level at program without lifting letdown line relief.

COMMENTS:

STEP

"-15. Close PCV-145 to maintain letdown pressure between 300 and 400 psig.

STANDARD Decreases the demand signal on the PCV-145 controller to close PCV-145 and observes pressure indication to maintain letdown pressure between 300 and 400 psig without lifting letdown line relief.

COMMENTS:

STEP 16 Places PCV-145, LO PRESSURE LETDOWN in AUTO.

STEP

17.

Places TCV-144, CC TO LTDN NX, in AUTO.

STANDARD PCV-145, LO PRESS LTDN controller, AUTO pushbutton lit.

STANDARD TCV-144,CC TO LTDN HX controller, AUTO pushbutton lit.

iNOTE 18:

Operator may delay returning FCV-122 to Auto if PZR level is above program to prevent excessive reduction of charging by PZR LCS.

0 0

JOB PERFORMANCE MEASURE CHECKLIST (S)

DENOTES SEQUENCED ELEMENT

(-)

DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:

STEP

18.

Places FCV-122, charging flow in AUTO when pressurizer level matches reference level.

STEP

19.

Places TCV-143, LTDN to VCT or

DEMIN, in DEMIN/AUTO.

STEP

20.

Ensure that pressurizer level master controller is responding correctly.

STEP

"-21.

Align the pressurizer heaters for existing plant conditions.

PAGE 6 SAT. UNSAT.

STANDARD Places FCV-122 controlled in AUTO by depressing AUTO pushbutton when levels matched per Section III.E of SOP-102.

STANDARD Momentarily positions TCV-143 to the DEMIN/AUTO position after letdown temperatures have stabilized.

STANDARD Observes that the Pressurizer Level Master Controller is responding properly.

STANDARD Momentarily places CNTRL GRP heater switch to CLOSE with RED flag indication Clears amber trip light on BU GRP1 heaters.

COMMENTS:

iNOTE 22:

RO ONLY:

Protection bistables are tripped by I&C.

Examiner hands I

operator Attachment 1 of AOP-401.6 and directs him to ensure I

I appropriate bistables are tripped.

Ask him to identify correct I

bistable.

STEP

22.

Ensure bistables tripped per.

STANDARD Verifies proper bistable tripped per.

P'rrAc "D

0 0

JOB PERFORMANCE MEASURE CHECKLIST (S)

DENOTES SEQUENCED ELEMENT

(-) DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:

PAGE 7 SAT.

UNSAT.

jNOTE 23:

SRO ONLY:

Examiner hands operator Attachment II of SOP-401 and asks him to explain how it is filled out.

STEP

23.

Directs I&C to trip appropriate bistables and ensure bistables tripped per.

Examiner Stops JPM At This Point TIME STOPPED:

GENERAL COMMENT

S:

STANDARD Explains how Attachment II of SOP-401 is used and verifies proper bistable tripped per Attachment I of SOP-401.

NRC KA

REFERENCES:

KA NUMBER 011000.AI. 01 011000.A2.03 Ability to stay predict and/or monitor changes in PZR level and pressure when operating PZR LCS controls.

Ability to predict and mitigate the consequences of loss of PZR level.

IMPORTANCE RO 3.5 3.8 FACTOR SRO 3.6 3.9