V.C. SUMMER NUCLEAR STATION NRC JOB PERFORMANCE MEASURE JPP-180 EVALUATE OVERTIME GUIDELINES (NRC)

Revision No. 0 frH (Z

PAGE 1 EVALUATE OVERTIME GUIDELINES (NRC)

II I' I II II TRAINEE EVALUATOR II EVALUATOR SIGNATURE DATE II II II II EVALUATION METHOD:

PERFORM II EVALUATION LOCATION:

SIMULATOR, CONTROL ROOM, CLASSROOM ESTIMATED TIME:

15.0 MINUTES TIME STARTED:

II li 10CFR55.

I II 10 m s.II TIME CRITICAL:

No FAULTED JPM:

No II T

E Pi JJ TRAINEE PERFORMANCE :

SATISFACTORY

____UNSATISFACTORY

__I_

I' I

READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES.

I WILL DESCRIBE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK.

BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES.

WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.

II IiII II II II It II INITIAL CONDITIONS:

1. The following attachment is the schedule of three operators for a seven day period.

TOOLS AND EQUIPMENT NEEDED:

NONE REFERENCED DOCUMENTS:

REV DATE TS*6.2.1 SAP*200 ORG.

OFFSITE & ONSITE ORG CONDUCT OF OPERATIONS TASK STANDARDS:

i.

Determines Operator #1 exceeded 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in 7

days.

2.

Determines Operator #2 has not violated work hour rules.

3.

Determines Operator #3 exceeded 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in a

48-hour period.

II II II If II

1.

2.

04/17/92 04/24/97 If

)

9 0

JOB PERFORMANCE MEASURE CHECKLIST (S)

DENOTES SEQUENCED ELEMENT

(*)

DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:

SAT.

UNSAT.

STEP

  • i.

Determines if Operator #1 has exceeded overtime guidelines.

STEP

2.

Determines if Operator #2 has exceeded overtime guidelines.

STEP

  • 3.

Determines if Operator #3 has exceeded overtime guidelines.

STANDARD Determines Operator #1 has exceeded working >72 hours in a one-week period.

STANDARD Determines Operator #2 has not exceeded any overtime guidelines.

STANDARD Determines Operator #3 has exceeded working >24 hours in a 48-hour period.

Examiner Stops JPM At This Point TIVS STOPPED.

GENERAL COMMENT

S:

PAGE 3 COMMENTS:

COMHMENTS:

11 EVALUATE OVERTIME GUIDELINES (NRC)

I.

NRC KA

REFERENCES:

KA NUMBER 194001.A1.03 Ability to locate and use procedures and station directives related to shift staffing and activities.

IMPORTANCE FACTOR RO SRO 2.5!

3.4!

PAGE 4 11

0 Operator #1 Operator #2 Operator #3 Monday 0700-1900 1900-0700 OFF Tuesday 0700-1900 2300-0700 1900-0900 (Came in late)

(Holdover)

Wednesday 0700-1900 1900-0700 1900-0700 Thursday 0700-1100 1900-0700 OFF (Callout, day off)

Friday 0700-1600 OFF 1900-0700 (Went home sick)

Saturday 0700-1900 1900-0700 1900-0700 Sunday 0700-1900 1900-0700 1900-0700