1 to Emergency Plan Implementing Procedure EP-PS-118, Radiation Protection Clerk: Emergency-Plan-Position-Specific Instruction.
ML022620376
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/04/2002
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EP-PS-118 Rev. 11
Download: ML022620376 (8)


Text

Sep. 04, 2002 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2002-41 74 USER INFORMATION:

F-L L B EMPL#:23244 CA#: 0363 Phone#: 254-3658 TRANSMITTAL INFORMATION:

JO: .LAIJYILAUREL-D 09/04/2002 LOCATION: 'DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER "NUCSA-2)

"\,.fHE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

118 - 118 - RADIATION PROTECTION CLERK: EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 12/11/2000 ADD MANUAL TABLE OF CONTENTS DATE: 09/03/2002 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-118 REMOVE: REV:10 ADD: REV: 11 REMOVE: PCAF 2000-5954 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

\..j.A

PROCEDURE COVER SHEET PPL SUSQUEHANNA, LLC I NUCLEAR DEPARTMENT PROCEDURE RADIATION PROTECTION CLERK: EP-PS-1 18 Emergency-Plan-Position-Specific Instruction Revision 11 Page 1 of 7 QUALITY CLASSIFICATION: APPROVAL CLASSIFICATION:

( ) QA Program (X) Non-QA Program ( ) PIani " ) Non-Plant (X ) ,eInstruction,:.

EFFECTIVE DATE _________

PERIODIC REVIEW FREQUENCY. Two Years PERIODIC REVIEW DUE DATE:

RECOMMENDED REVIEWS:.. .

All , F..

Proceirdure Owner Nuclear Emergency Planning Responsible Supervisor. Supervisor-Administrative Responsible FUM: Supv.-Nuclear Emergency Planning Responsible Approver: General Manager-Plant Support FORM NDAP-QA-0002-1, Rev. 3, Page 1 of 1

EP-PS-1 18 Revision 11 Page 2 of 7 RADIATION PROTECTION COORDINATOR'S CLERK WHEN: TSC Activation HOW NOTIFIED: Telephone (Telenotifications System)

REPORT TO: Technical Support Center WHERE TO REPORT: Administrative Support Coordinator, then to the Radiation Protection Coordinator OVERALL DUTY:

Keep an accurate and detailed Ioq of the Radiation Protection Coordinator's activities, distribute the Protective Action Recommendation Form and MIDAS Dose Summary Report, and update the Big Picture Board with current dose information.

MAJOR TASKS:

A. Maintain a log of the Radiation Protection Coordinator's activities and decisions.

NOTE:

Military time shall be used for all log entries.

1. Log all telephone calls to and from the RPC.
2. - Log all information presented by the RPC at the Emergency Director's briefings (usually held every thirty minutes).

NOTE:

Ifthe RPC has already begun activities prior to your arrival, ask for an update for entry into the log.

B. Distribute the Protective Action Recommendation Form

1. Obtain the Protective Action Recommendation Form from the Radiation Protection Coordinator.
2. Make two copies.
3. Distribute to:
a. Radiation Protection Coordinator
b. TSC Communicator C. Telecopy Clerk (original)

EP-PS-1 18 Revision 11 Page 3 of 7

4. Remind the Telecopy Clerk to transmit the Protective Action Recommendation Form to:
a. Media Operations Center
b. Emergency Operations Facility
5. Continue distribution until the EOF assumes control of the emergency.

C. Distribute the MIDAS Dose Summary Report.

NOTE:

The MIDAS Dose Summary Report is a printout taken from the computer located near the TSC Dose Calculator and prints out approximately every fifteen minutes.

1. Obtain MIDAS Dose Summary Report from the TSC Dose Calculator.

NOTE:

The report must contain signatures in the "Calculated By" and "Revised By" spaces. If it does not, return the form to the Dose Calculator.

2. Transmit the "MIDAS Dose Summary Report" to the EOF Dose AssessmentArea using the telecopy machine located in the TSC Rad Area.
3. Xerox two copies.
4. Distributeto:
a. Radiation Protection Coordinator
b. Dose Calculator
c. Telecopy Clerk (original)
5. Remind the Telecopy Clerk to transmit the MIDAS Dose Summary Report to the Public Information Manager located in the Media Operations Center.

D. Update the Big Picture Board.

NOTE:

The Big Picture Board is located on the wall near the TSC Communicators.

1. Record data from the "Protective Action Recommendation"section of the Protective Action Recommendation Form onto the Big Picture Board in the block marked "RECOMMENDED PROTECTIVE ACTION."
2. Continue to update the board whenever the status changes.

EP-PS-1 18 Revision 11 Page 4 of 7 E. If you are relieved at shift turnover, brief your replacement by reviewing log entries.

F. Upon termination of the emergency condition:

1. When dismissed by the Radiation Protection Coordinator
a. Turn in the Radiation Protection Coordinator's logbookto the TSC Administrative Coordinator.
b. Collect one copy of each form you have distributed (preferably the original):

(1) Protective Action Recommendation Form (2) MIDAS Dose Summary Report

c. Collate each form by type, time/number.
d. Turn over the forms to the Administrative Support Coordinator.
e. Attend a debriefing by the Administrative Support Coordinator before leaving the TSC.

SUPPORTING INFORMATION:

S* Protective Action Recommendation Form Typical MIDAS Dose Summary Report

Attachment A EP-PS-1 18 Revision 11 Page 5 of 7 Affected Unit Control No.

PROTECTIVE ACTION RECOMMENDATION FORM SUSQUEHANNA STEAM ELECTRIC STATION El This is a Drill [] This is NOT a Drill Preparer The EMERGENCY CLASSIFICATION is:

E- Unusual Event -- Alert -- Site Area Emergency E] General Emergency Basis: EAL #

This represents:

El Initial Classification E] Escalation E] Reduction El No Change in the Classification Status Emergency Action(s) implemented onsite:

El None E-l Evacuation of non-essential personnel El Local Area Evacuation El KI to onsite personnel El Site Accountability El Other El Bases:

The PROTECTIVE ACTION RECOMMENDATION is:

El No Protective Action Recommendation Required El Evacuate 0-2 miles and Shelter 2-10 miles El Relocation El Evacuate 0-10 milesE Control of Access El Contamination Controls/Decon Danville Drinking Water* 1Divert Other

  • Expected arrival of release at Danville:

This represents: El Initial E] Change [] No Change in the Protective Action Recommendation EP-AD-000-1 10, Revision 7, Page 1 of 2 (Duplex)

Attachment A EP-PS-1 18 Revision 11 Page 6 of 7 The BASIS for the Protective Action Recommendation is:

Plant Status Radioactive Release: E] Monitored r- Unmonitored Status Airborne Liquid

< Tech Requirements Limit (Routine) QI El

>_Tech Requirements Limit (Event Related) Li 0 Note: TRM Limits (g*Ci/min): Noble Gas 8.51E+5; Iodine 1.04E+2; Particulate 7.72 E+2 (Airborne releases)

Data measured in the field confirm release rate estimations: R Yes F] No Weather Conditions: Wind Speed _ _Wind Direction Dose Projections: L-JTEDE > 1 rem or thyroid CDE > 5 rem at 2 miles E TEDE > 1 rem or thyroid CDE > 5 rem at EPB L- TEDE _*1 rem and thyroid CDE _5 rem at EPB Other:

Approval: Date/Time:

Emergency Director or Recovery Manager approval required if change in Classification or Protective Action Recommendation.

RPC or DASU approval if no change in the Classification or Protective Action Recommendation:

Transmittal: r- Verbal [- Electronic E-i Both Communicated To:

NAME AGENCY DATE/TIME EP-AD-000-1 10, Revision 7, Page 2 of 2 (Duplex)

Attachment B EP-PS-1 18 Revision 11 Page 7 of 7 PRINT DATE/TIME: 8/19/97 I1:11 CURRENT TIME PERIOD: 8/19/97 11:15 MIDAS DOSE

SUMMARY

REPORT REACTOR SHUTDOWN: 8/19.97 19:53 START OF RELEASE: WIND SPEED (MPH): S 8/19.97 18:53 WIND FROM (DEC): 128 (ESE)

MENU SELECTION: FORWARD CALCULATIONS SOURCE TERM: LOCA (RX DP-NO STABILITY CLASS: D FD) PRECIPITATION: NO CURRENT (SITE TOTAL) RELEASE RATE (UCi/in.)

NOBLE GAS 1-131 PARTICULATES 6,g98E÷9 9.96E+e+/- 9.96E+'8 I OSCAR UNITS.~L DOSE EA DOSE EAX SECTOR I CTOR DOSE PEAX (mz~em) ISECTOR 414W , 11Z.S1IUN

4. 82E-94 3.48E-94 1 9.821 WNW COMMENTS : 'DATE:________

DATE:________

cCO  : NU E EP-AD-000-1 13, Revision 2, Page 1 of 1