W~LFCREEK
'NUCLEAR OPERATING CORPORATION Donna Jacobs
-Plant Manager SEP 12 2002 WO 02-0050 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
Docket No. 50-482: August, 2002, Monthly Operating Report Gentlemen:
-Attached to this letter is the August, 2002, Monthly Operating Report for the Wolf Creek Generating Station. This submittal is being made in accordance with the requirements of Wolf Creek Generating Station Technical Specification 5.6.4, "Monthly Operating Reports." This submittal also follows the guidance of Generic Letter 97-02, "Revised Contents of the Monthly Operating Report." If you have questions regarding this-report, please contact me at (620) 364-4246, or Mr. Tony Harris at (620) 364-4038.
Very truly yours, S_
- ~~D],,o a Jacobs DJ/rlr Attachment cc:
J. N.- Donohew (NRC),l w/a D. N. Graves (NRC), w/a E. W. Merschoff (NRC), w/a Senior Resident Inspector (NRC), w/a RO Box 411 -/Burlington, KS 66839 Phone: (620) 364-8831
- An Equal Opportunity Employer M/F/H-CNET
'C Attachment to WO 02-0050 Page 1 of 2 OPERATING DATA REPORT Report Number: 210 DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-482 Wolf Creek Generating Station September 6, 2002 J. L. Yunk (620) 364-4272 REPORT MONTH: August, 2002 I1. I Design Electrical Rating (MWe - Net):
1170
- 2.
Maximum Dependable Capacity (MWe - Net):
1170 This Month Year to Date Cumulative
- 3.
Number of Hours Reactor Critical:
744.0 4842.1 127,206.8
- 4.
Number of Hours Generator On-Line:
744.0 4,766.6 126,016.8
- 5.
Unit Reserve Shutdown Hours:
0.0 0.0 339.8
- 6.
Net Electrical Energy Generated (MWH) 873,897 5,558,222 142,595,224 Wolf Creek Generating Station Monthly Operating Report August, 2002 Page 1 of 2
Attachment to WO 02-0050 Page 2 of 2 i.
UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-482 Wolf Creek Generating Station September 6, 2002 J. L. Yunk (620) 364-4272
SUMMARY
The unit operated in Mode 1, 100% power, from August 1, 2002, through August 31, 2002.
A: EQUIPMENT FAILURE (EXPLAIN)
B: MAINTENANCE OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER (EXPLAIN)
(2) METHOD: 1. MANUAL
- 2. MANUAL SCRAM
- 3. AUTOMATIC SCRAM
- 4. CONTINUATION
- 5. OTHER Wolf Creek Generating Station Monthly Operating Report August, 2002 Page 2 of 2 Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS/COMMENTS No.
Date 5: SCHEDULED (Hours)
(1)
(2)
(1) REASON: