ML022610521
ML022610521 | |
Person / Time | |
---|---|
Site: | Perry |
Issue date: | 09/11/2002 |
From: | Hayes J FirstEnergy Nuclear Operating Co |
To: | Shelby R Lake County, OH, Dept of Utilities, Office of Nuclear Reactor Regulation |
References | |
PY-CEI/LCDU-0067L | |
Download: ML022610521 (2) | |
Similar Documents at Perry | |
---|---|
Category:Letter
MONTHYEARIR 05000440/20230042024-01-30030 January 2024
[Table view]Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report 2024-01-30 Category:Report MONTHYEARL-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023
[Table view]CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-21-045, 10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension2021-02-0808 February 2021 10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension L-18-186, Proposed Alternative to Use ASME Code Case N-8312018-09-0707 September 2018 Proposed Alternative to Use ASME Code Case N-831 L-17-234, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(0 Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the ...2017-08-11011 August 2017 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(0 Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the ... L-17-229, Mitigating Strategies Assessment (MSA) for Flooding2017-07-24024 July 2017 Mitigating Strategies Assessment (MSA) for Flooding L-17-039, 2016 Annual Report of Emergency Core Cooling System Errors and Model Changes2017-04-0505 April 2017 2016 Annual Report of Emergency Core Cooling System Errors and Model Changes L-17-088, Independent Spent Fuel Storage Installation Changes, Tests and Experiments2017-03-27027 March 2017 Independent Spent Fuel Storage Installation Changes, Tests and Experiments ML21106A0222016-05-31031 May 2016 Enclosure a - Evaluation Attachment 5 - FLO-2D Verification Report (Report Attachment 2) L-16-091, Revision of Flood Hazard Reevaluation Report in Response to NRC Request for Additional Information, Per 10CFR50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukush2016-03-24024 March 2016 Revision of Flood Hazard Reevaluation Report in Response to NRC Request for Additional Information, Per 10CFR50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukush L-15-281, Submittal of Report of Facility Changes, Tests and Experiments2015-10-23023 October 2015 Submittal of Report of Facility Changes, Tests and Experiments ML15208A0342015-08-0303 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force L-15-193, Submittal of the 2015 Silicone Sealant Report Pursuant to License Commitment 172015-06-12012 June 2015 Submittal of the 2015 Silicone Sealant Report Pursuant to License Commitment 17 L-15-108, ISFSI - Summary Report of Changes, Tests and Experiments for the Period of January 1, 2013 Through December 31, 20142015-04-0303 April 2015 ISFSI - Summary Report of Changes, Tests and Experiments for the Period of January 1, 2013 Through December 31, 2014 L-14-401, First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In2014-12-19019 December 2014 First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In L-14-259, Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-08-28028 August 2014 Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) L-14-254, 10 CFR 71.95 Report on the TN-RAM Package2014-08-15015 August 2014 10 CFR 71.95 Report on the TN-RAM Package ML14141A4602014-06-30030 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 L-14-198, Report of Changes and Errors Pursuant to 10 CFR 50.462014-06-18018 June 2014 Report of Changes and Errors Pursuant to 10 CFR 50.46 ML14115A2342014-05-30030 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML13338A4602014-01-22022 January 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML14014A2092014-01-14014 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Perry Nuclear Power Plant, Unit 1, TAC No.: MF0962 (Revision 1) ML13340A1472013-11-26026 November 2013 Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant - Response to RAI Associated with Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (TAC Nos. MF0116 & MF0 L-13-358, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (2 of 2)2013-10-0909 October 2013 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (2 of 2) ML13340A1572013-10-0909 October 2013 Perry Nuclear Power Plant Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (1 of 2) ML13340A1562013-10-0909 October 2013 Perry Nuclear Power Plant Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix a ML13340A1552013-10-0909 October 2013 Perry Nuclear Power Plant Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1 L-13-300, Submittal of 10 CFR 71.95 Report on the 8-120B Cask2013-10-0101 October 2013 Submittal of 10 CFR 71.95 Report on the 8-120B Cask L-13-164, Addendum to Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report2013-06-18018 June 2013 Addendum to Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report L-12-347, FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2012-11-27027 November 2012 FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML13008A0542012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B: Seismic Walkdown Checklists, Page B-1, Sheet 482 of 513 Through Appendix C: Area Walk-by Checklists, Sheet 85 of 212 ML13135A2512012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B - Seismic Walk-Down Checklists (Swcs), Sheet 204 of 461 Through Sheet 461 of 461 ML13135A2492012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B - Seismic Walk-Down Checklists (Swcs), Sheet 1 of 461 Through Sheet 203 of 461 ML13135A2482012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix a - Resumes and Qualifications ML13135A2472012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Cover Through Page 153 ML13135A2292012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendices C Through End ML13008A0502012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B: Seismic Walkdown Checklists, Page B-1, Sheet 1 of 513 Through Sheet 122 of 513 ML13008A0512012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B: Seismic Walkdown Checklists, Page B-1, Sheet 123 of 513 Through Sheet 247 of 513 ML13008A0492012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Cover Through Appendix a, Resumes and Qualifications, Page A-36 ML13008A0552012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C: Area Walk-by Checklists, Sheet 86 of 212 Through End ML13008A0522012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B: Seismic Walkdown Checklists, Page B-1, Sheet 248 of 513 Through Sheet 367 of 513 ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants L-11-017, State of Ohio Water Withdrawal Report2011-01-24024 January 2011 State of Ohio Water Withdrawal Report ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants ML0919400712009-06-29029 June 2009 Semi-Annual Sewage Isotopic Report ML0904007952009-02-0404 February 2009 GSI-189 Action Plan, Feb. 09 Update, Publicly Available Version ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0705902852007-02-20020 February 2007 Semiannual Fitness-For-Duty Report for Period of July 1, 2006 Through December 31, 2006 ML0700902662007-01-0808 January 2007 Final Transition Letter and Attachment, Revision 1 (1-8-07) 2023-08-07 Category:Miscellaneous MONTHYEARL-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023
[Table view]CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-18-186, Proposed Alternative to Use ASME Code Case N-8312018-09-0707 September 2018 Proposed Alternative to Use ASME Code Case N-831 L-17-229, Mitigating Strategies Assessment (MSA) for Flooding2017-07-24024 July 2017 Mitigating Strategies Assessment (MSA) for Flooding L-17-039, 2016 Annual Report of Emergency Core Cooling System Errors and Model Changes2017-04-0505 April 2017 2016 Annual Report of Emergency Core Cooling System Errors and Model Changes L-17-088, Independent Spent Fuel Storage Installation Changes, Tests and Experiments2017-03-27027 March 2017 Independent Spent Fuel Storage Installation Changes, Tests and Experiments L-16-091, Revision of Flood Hazard Reevaluation Report in Response to NRC Request for Additional Information, Per 10CFR50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukush2016-03-24024 March 2016 Revision of Flood Hazard Reevaluation Report in Response to NRC Request for Additional Information, Per 10CFR50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukush L-15-281, Submittal of Report of Facility Changes, Tests and Experiments2015-10-23023 October 2015 Submittal of Report of Facility Changes, Tests and Experiments ML15208A0342015-08-0303 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force L-15-193, Submittal of the 2015 Silicone Sealant Report Pursuant to License Commitment 172015-06-12012 June 2015 Submittal of the 2015 Silicone Sealant Report Pursuant to License Commitment 17 L-15-108, ISFSI - Summary Report of Changes, Tests and Experiments for the Period of January 1, 2013 Through December 31, 20142015-04-0303 April 2015 ISFSI - Summary Report of Changes, Tests and Experiments for the Period of January 1, 2013 Through December 31, 2014 L-14-401, First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In2014-12-19019 December 2014 First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In L-14-259, Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-08-28028 August 2014 Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) L-14-254, 10 CFR 71.95 Report on the TN-RAM Package2014-08-15015 August 2014 10 CFR 71.95 Report on the TN-RAM Package ML14141A4602014-06-30030 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident L-14-198, Report of Changes and Errors Pursuant to 10 CFR 50.462014-06-18018 June 2014 Report of Changes and Errors Pursuant to 10 CFR 50.46 ML14115A2342014-05-30030 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML13340A1472013-11-26026 November 2013 Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant - Response to RAI Associated with Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (TAC Nos. MF0116 & MF0 ML13340A1562013-10-0909 October 2013 Perry Nuclear Power Plant Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix a L-13-358, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (2 of 2)2013-10-0909 October 2013 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (2 of 2) ML13340A1572013-10-0909 October 2013 Perry Nuclear Power Plant Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (1 of 2) ML13340A1552013-10-0909 October 2013 Perry Nuclear Power Plant Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1 L-13-300, Submittal of 10 CFR 71.95 Report on the 8-120B Cask2013-10-0101 October 2013 Submittal of 10 CFR 71.95 Report on the 8-120B Cask L-13-164, Addendum to Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report2013-06-18018 June 2013 Addendum to Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report L-12-347, FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2012-11-27027 November 2012 FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML13135A2512012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B - Seismic Walk-Down Checklists (Swcs), Sheet 204 of 461 Through Sheet 461 of 461 ML13008A0492012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Cover Through Appendix a, Resumes and Qualifications, Page A-36 ML13008A0502012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B: Seismic Walkdown Checklists, Page B-1, Sheet 1 of 513 Through Sheet 122 of 513 ML13008A0512012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B: Seismic Walkdown Checklists, Page B-1, Sheet 123 of 513 Through Sheet 247 of 513 ML13008A0542012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B: Seismic Walkdown Checklists, Page B-1, Sheet 482 of 513 Through Appendix C: Area Walk-by Checklists, Sheet 85 of 212 ML13135A2492012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B - Seismic Walk-Down Checklists (Swcs), Sheet 1 of 461 Through Sheet 203 of 461 ML13135A2482012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix a - Resumes and Qualifications ML13135A2472012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Cover Through Page 153 ML13008A0522012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B: Seismic Walkdown Checklists, Page B-1, Sheet 248 of 513 Through Sheet 367 of 513 ML13008A0552012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C: Area Walk-by Checklists, Sheet 86 of 212 Through End ML13135A2292012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendices C Through End ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants L-11-017, State of Ohio Water Withdrawal Report2011-01-24024 January 2011 State of Ohio Water Withdrawal Report ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants ML0919400712009-06-29029 June 2009 Semi-Annual Sewage Isotopic Report ML0705902852007-02-20020 February 2007 Semiannual Fitness-For-Duty Report for Period of July 1, 2006 Through December 31, 2006 ML0700902662007-01-0808 January 2007 Final Transition Letter and Attachment, Revision 1 (1-8-07) ML0700902622007-01-0303 January 2007 Transition Letter and Attachment (1/3/07) L-06-071, Revised Financial Information Associated with an Order Approving Transfer of Licenses to Firstenergy Nuclear Generation Corp2006-05-30030 May 2006 Revised Financial Information Associated with an Order Approving Transfer of Licenses to Firstenergy Nuclear Generation Corp ML0608804422006-03-24024 March 2006 GE Evaluation of OPRM Performance During Instability Events at Nine Mile Point, Unit 2 and Perry Nuclear Power Plant ML0606105272006-02-21021 February 2006 Semiannual Fitness-for-Duty Report for the Period July 1, 2005 Through December 31, 2005 ML0526304912005-09-0909 September 2005 Report of 10 CFR 50.59 Evaluations for 2003-2005 ML0523604432005-08-18018 August 2005 Semiannual Fitness-For-Duty Report Covering Time Period January 1, 2005 Through June 30, 2005 ML0522802442005-08-0808 August 2005 Response to NRC Inspection Procedure 95003 Supplemental Inspection, Inspection Report 05000440/2005003 ML0522803542005-08-0808 August 2005 Report of Changes Pursuant to 10 CFR 50.46 2023-08-07 |
Text
FENOC Fs &*-V N Cp-brg0-Wny Perry Nuclear Power 10 Center Perry, Ohio 4 James P. Hayes 440-280-7519 Manager - Radwaste, Environmental, Chemistry Fax: 440-280-5681 September 11, 2002 PY-CEI/LCDU-0067L Attention: Robert Shelby, Mentor Waste Facility Lake County Department of Utilities P.O. Box 490 Painesville, Ohio 44077-0490 Ladies and Gentlemen:
Enclosed are the results of an isotopic analysis performed for industrial wastewater from the Perry Nuclear Power Plant. No radioactive material was detected.
If you have questions or require additional information, please contact Mr. Leo Harte at (440) 280-5514.
Very truly yours, Enclosures cc: NRC Region III NRC Resident Inspector Office NRC Project Manager NRC Document Control Desk (Docket No. 50-440)