FENOC Perry Nuclear Power Plant FENOC10 Center Road
,"I-%
PO Box97 FirstEnergy Nuclear Operating Company Perry, Ohio 44081 September 11, 2002 PY-CEI/NRR-2664L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the August 2002 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Gregory A. Dunn Manager - Regulatory Affairs Attachment cc: NRC Region Im Administrator NRC Project Manager NRC Resident Inspector
OPERATING DATA REPORT UNIT:
Perry DATE:
9/9/02 Docket: 50-440 Unit Name:
Perry Nuclear Power Plant Reporting Period: August 2002 Utility
Contact:
T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
1260 1235 Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)
This Month 744 0 744.0 0.0
.QlR Aq77.0 Yr-to-Date 5,674 0 5,590.5 0.0 6.798.700.0 Cumulative 102,259.2 99,663.5 0.0 113.399.102.0
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
7.
- 8.
- 9.
- 10.
11.
Page 1 17
N 1'
UNIT SHUTDOWNS REPORT MONTH - August 2002 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 09/09/02 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1
Hours 2
3
SUMMARY
- The Perry Plant was on line the entire month of August 2002.
1 TYPE:
F: Forced S: Scheduled
- 2. REASON:
A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &
License Examination F - Administrative G - Operational Error (explain)
H - Other (explain)
- 3. METHOD:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2