August 2002 Monthly Operating Report for Perry Unit 1
ML022610448
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 09/11/2002
From: Dunn G
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PY-CEI/NRR-2664L
Download: ML022610448 (3)


Text

FENOC Perry Nuclear Power Plant FENOC10 Center Road

,"I-%

PO Box97 FirstEnergy Nuclear Operating Company Perry, Ohio 44081 September 11, 2002 PY-CEI/NRR-2664L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the August 2002 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Gregory A. Dunn Manager - Regulatory Affairs Attachment cc: NRC Region Im Administrator NRC Project Manager NRC Resident Inspector

OPERATING DATA REPORT UNIT:

Perry DATE:

9/9/02 Docket: 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period: August 2002 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1260 1235 Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)

This Month 744 0 744.0 0.0

.QlR Aq77.0 Yr-to-Date 5,674 0 5,590.5 0.0 6.798.700.0 Cumulative 102,259.2 99,663.5 0.0 113.399.102.0

1.
2.
3.
4.
5.
6.

7.

8.
9.
10.

11.

Page 1 17

N 1'

UNIT SHUTDOWNS REPORT MONTH - August 2002 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 09/09/02 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1

Hours 2

3

SUMMARY

The Perry Plant was on line the entire month of August 2002.

1 TYPE:

F: Forced S: Scheduled

2. REASON:

A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

License Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

3. METHOD:

I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2