ML022610201

From kanterella
Jump to navigation Jump to search
August 2002 Monthly Operating Report for Watts Bar
ML022610201
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/13/2002
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022610201 (5)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 10 CFR 50.4 SEP 13 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket Nos.

50-390 Tennessee Valley Authority

)

WATTS BAR NUCLEAR PLANT (WBN) - AUGUST 2002 MONTHLY OPERATING REPORT Enclosed is the August 2002 Monthly Operating Report as required by WBN Technical Specification Section 5.9.4. If you have any questions concerning this matter, please call me at (423) 365-1824.

Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc: See page 2 Pnnted on recycled paper

U.S. Nuclear Regulatory Commission Page 2 SEP 1 3 ?no2 cc (Enclosure):

NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. L. Mark Padovan, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303

ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)

MONTHLY OPERATING REPORT AUGUST 2002 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1

OPERATING DATA REPORT Docket No.

50-390 Unit Name:

WBN Unit 1 Date:

September 5, 2002 Completed By:

D. K. Flournoy Telephone:

(423) 365-3803 Reporting Period:

August 2002

1.

Design Electrical Rating (MWe-Net):

2.

Maximum Dependable Capacity (MWe-Net):

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh) 1155 1125 Month Year-to-Date 744 5137.6 744 5070.6 0.0 0.0 831704 5710415 Cumulative 50236.5 49971.2 0.0 55097131 E-2

DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-390 WBN-1 September 5, 2002 D. K. Flournoy (423) 365-3803 1

1

.1

.5

.5

.5. _______________

.5.

.5.

'F: Forced S: Scheduled 2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5-Other (Explain)

"4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)

(NUREG - 1022)

Summary:

WBN Unit 1 operated at or near 100% power during August 2002. There were no challenges to the pressurizer power operated relief valves or pressurizer safety valves during the month.

E-3 UNIT SHUTDOWNS