Re Requalification Program Inspection for Week of November 11, 2002
ML022610060
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/12/2002
From: David Pelton
Division of Reactor Safety III
To:
FirstEnergy Nuclear Operating Co
References
Download: ML022610060 (3)


Text

September 12, 2002 Mr. Lew W. Myers Chief Operating Officer FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION

Dear Mr. Myers:

In a telephone conversation on September 9, 2002, Mr. D. Bondy, Requal Lead, and Mr. Mike Bielby, Lead Inspector, made arrangements for the NRC to inspect the licensed operator requalification program at the Davis-Besse Nuclear Power Plant. The inspection is planned for the week of November 11, 2002, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRCs inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by November 4, 2002. Mr. D. Bondy has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on April 30, 2003.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

L. Myers 2

In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mike Bielby at 630-829-9762, or me at 630-829-9732.

Sincerely,

/RA/

David L. Pelton, Acting Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc:

B. Saunders, President - FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, FirstEnergy Ohio State Liaison Officer R. Owen, Ohio Department of Health Public Utilities Commission of Ohio President, Board of County Commissioners Of Lucas County President, Ottawa County Board of Commissioners D. Bondy, Training Department

L. Myers 2

In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mike Bielby at 630-829-9762, or me at 630-829-9732.

Sincerely,

/RA/

David L. Pelton, Acting Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc:

B. Saunders, President - FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, FirstEnergy Ohio State Liaison Officer R. Owen, Ohio Department of Health Public Utilities Commission of Ohio President, Board of County Commissioners Of Lucas County President, Ottawa County Board of Commissioners D. Bondy, Training Department DOCUMENT NAME: G:\\DRS\\DAI 09_02DRS.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME MBielby:aa DPelton DATE 09/12/02 09/12/02 OFFICIAL RECORD COPY

L. Myers 3

ADAMS Distribution:

AJM DCT DFT SPS1 RidsNrrDipmIipb GEG HBC CST1 C. Ariano (hard copy)

DRPIII DRSIII PLB1 JRK1 M. A. Bies, DRS