ML022600475

From kanterella
Jump to navigation Jump to search
Senior Reactor and Reactor Operator Initial Examinations
ML022600475
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/05/2002
From: Price J
Dominion Nuclear Connecticut
To: Conte R
NRC Region 1
References
B18737, NUREG-1021
Download: ML022600475 (2)


Text

Dominion Nuclear Connecticut, Inc.

~Dominion Millstone Power Station Rope Ferry Road Waterford, CT 06385 SEP 524W Docket No. 50-336 B18737 RE: 10 CFR 55.40(b)(3)

Mr. Richard J. Conte' Chief Operational Safety Branch, Region I.

U.S. Nuclear Regdlatory Commission 475 Allendale Road King of Prussia, PA 19406 Millstone Power Station, Unit No. 2 Senior Reactor and Reactor Operator Initial Ekaminations This letter is provided in ' response.,to the request from your office, dated June 27, 2002,0') to furnish the written ex-amin tions, operating tests, and supporting reference materials for the Millstone Unit No. 2"-Senior Reactor and Reactor Operator Initial Examinations. As stated in the June 27, 2002, letter, the written examination will be administered during the week of October 21, 2002, and the operating tests will be administered by your staff during the week of December 16, 2002.

The examination material included within Attachment 1 was developed in accordance with the guidelines contained in Examination Standard ES-401, "Preparing Initial Site Specific Written Examinations," and ES-301, "Preparing Initial Operating Tests," of NUREG-1021, Revision 8, Supplement 1.

Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility has approved the examination material contained in Attachment 1 prior to submittal to the U.S. Nuclear Regulatory Commission.

It is our belief that the enclosed materials are complete and ready for use.

Consistent with the guidance contained in NUREG-1021, ES-201, Attachment 1, "Examination Security and Integrity Guidelines," the examination materials transmitted via Attachment 1 should be withheld from public disclosure until after the examination has been completed. No redacted versions are being supplied.

There are no regulatory commitments contained within this letter.

(1) R. J. Conte letter from U.S. Nuclear Regulatory Commission to J Alan Price, "Senior Reactor and Reactor Operator Initial Examinations - Millstone Nuclear Power Station, NX Unit 2," dated June 27, 2002.

U.S. Nuclear Regulatory Commission B18737/Page 2 Should you have any questions regarding this submittal, please contact Mr. Michael J. Wilson at (860) 437-2916.

Very truly yours, DOMINION NUCLEAR CONNECTICUT, INC.

Site President - Millstone Attachment (1) cc:

w/o attachment H. J. Miller, Region I Administrator R. B. Ennis, NRC Senior Project Manager, Millstone Unit No. 2 NRC Senior Resident Inspector, Millstone Unit No. 2 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555