ML022600227

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedure (EPIP) Revisions
ML022600227
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/11/2002
From: Abney T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
R08 020911 680 EPIP-11, Rev 9, EPIP-2, Rev 24, EPIP-3, Rev 27, EPIP-4, Rev 26, EPIP-5, Rev 31
Download: ML022600227 (5)


Text

R08 020911 680 September 11, 2002 10 CFR Part 50, App E U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Gentleman:

In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1, 2, and 3 EMERGENCY PLAN IMPLEMENTING PROCEDURE (EPIP) REVISIONS TVA is submitting this notification in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V.

Specifically, several EPIPs were revised: (1) EPIP-2, Revision 24; (2) EPIP-3, Revision 27; (3) EPIP-4, Revision 26; (4) EPIP-5, Revision 31; and (5) EPIP-11, Revision 9. The revisions have an effective date of August 26, 2002.

The enclosed information is being sent by certified mail.

The signed receipt signifies that you have received this information. If you have any questions, please telephone me at (256) 729-2636.

Sincerely, original signed by:

T. E. Abney Manager of Licensing and Industry Affairs cc: See Page 2

U.S. Nuclear Regulatory Commission Page 2 September 11, 2002 Enclosure cc (Enclosure):

NRC Resident Inspector (Enclosure provided by Browns Ferry Nuclear Plant BFN Document Control Unit)

P.O. Box 189 Athens, Alabama 35611 Mr. Paul E. Fredrickson (2 Enclosures)

U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street S.W., Suite 23T85 Atlanta, Georgia 30303-8931 Mr. Kahtan N. Jabbour, Senior Project Manager (w/o Enclosure)

U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)

Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738

U.S. Nuclear Regulatory Commission Page 3 September 11, 2002 DTL:JEW:BAB cc (w/o Enclosure):

T. W. Cornelius, PAB 2K-BFN B. K. Marks, LP 6B-C A. S. Bhatnagar, PAB 1E-BFN EDMS-K S/LIC/SUBMIT/OPERATOR/EPIP092502.doc

ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 EMERGENCY PLAN IMPLEMENTING PROCEDURES (EPIP) REVISIONS EPIP-2, EPIP-3, EPIP-4, EPIP-5, AND EPIP-11 SEE ATTACHED

GENERAL REVISIONS GENERIC FILING INSTRUCTIONS FILE DOCUMENTS AS FOLLOWS:

PAGES TO BE REMOVED PAGES TO BE INSERTED EPIP-2 Revision 23 EPIP-2 Revision 24 EPIP-3 Revision 26 EPIP-3 Revision 27 EPIP-4 Revision 25 EPIP-4 Revision 26 EPIP-5 Revision 30 EPIP-5 Revision 31 EPIP-11 Revision 8A EPIP-11 Revision 9