August 2002 Monthly Operating Report for Calvert Cliffs Units 1 & 2
ML022600044
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/12/2002
From: Nietmann K
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022600044 (7)


Text

Kevin J. Nietmann Plant General Manager Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 410 495-4787 Fax Constellation Energy Group September 12, 2002 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

SUBJECT:

Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 August 2002 Operating Data Reports The subject reports are being sent to you as required by Technical Specification 5.6.4.

Should you have questions, please contact Mr. Bruce B. Mrowca at (410) 495-3989.

Very truly yours, KJN/TWG/bjd Attachments cc:

R. S. Fleishman, Esquire J. E. Silberg, Esquire Director, Project Directorate I-I, NRC D. M. Skay, NRC H. J. Miller, NRC Resident Inspector, NRC R. I. McLean, DNR J. Wright, INPO K. N. Larson, ANI

OPERATING DATA REPORT Docket No.

50-317 Calvert Cliffs Unit 1 September 3, 2002 Prepared by Herman 0. Olsen Telephone:(410)495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)

MAXIMUM DEPENDABLE CAP'Y (NET MWe)

NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED(MWH)

AUGUST 2002 845 825 This month 744.0 744.0 0.0 627,295 Year to-Date 2,801.7 2,763.4 0.0 2,292,324 Cumulative to Date 180,533.8 177,379.1 0.0 144,814,407

1.
2.
3.

4.

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-317 Calvert Cliffs - U1 September 6, 2002 Herman 0. Olsen (410) 495-6734 REPORTING MONTH August 2002 I Reason:

A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2 Method:

I - Manual 2 - Manual Scram.

3 - Automatic Scram.

4 - Continued 5 - Other NO.

DATE TYPE DURATION REASON' METHOD OF CAUSE/CORRECTIVE ACTIONS F:

FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN 2 COMMENTS There were no shutdowns this month.

DOCKET NO. 50-317 CALVERT CLIFFS - UNIT 1 September 6, 2002

SUMMARY

OF OPERATING EXPERIENCE August 2002 The unit operated at 100% power for the entire month.

OPERATING DATA REPORT Docket No.

50-318 Calvert Cliffs Unit 2 September 6, 2002 Prepared by Herman 0. Olsen Telephone:(410)495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)

MAXIMUM DEPENDABLE CAP'Y (NET MWe)

AUGUST 2002 845 835 This month Year-Cumulative to-Date to Date

1. NUMBER OF HOURS REACTOR WAS CRITICAL
2.

HOURS GENERATOR ON LINE

3. UNIT RESERVE SHUTDOWN HOURS
4. NET ELECTRICAL ENERGY GENERATED(MWH) 744.0 744.0 0.0 5,831.0 5,831.0 0.0 174,630.8 172,775.7 0.0 614,925 4,979,579 142,085,457

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-318 Calvert Cliffs-U2 September 6, 2002 Herman 0. Olsen (410) 495-6734 REPORT MONTH August 2002 SReason:

A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2 Method:

I - Manual 2 - Manual Scram.

3 - Automatic Scram.

4 - Continued 5 - Other NO.

DATE TYPE DURATION REASON' METHOD OF CAUSE/CORRECTIVE ACTIONS F:

FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN 2 COMMENTS There were no shutdowns this month.

DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 September 6, 2002

SUMMARY

OF OPERATING EXPERIENCE August 2002 The unit began the month at 100% reactor power.

On 08/10/2002 at 0000 power was reduced to 90% to clean 21A waterbox. Power was returned to 100%

at 0845 after the completion of waterbox cleaning.

On 08/13/2002 at 0001 power was reduced to 90% to clean 21B waterbox. Power was returned to 100%

at 0615 after the completion of waterbox cleaning.

On 08/15/2002 at 2320 power was reduced to 93% to clean 22A waterbox. Power was returned to 100%

on 08/16/02 at 0420 after the completion of waterbox cleaning.

On 08/20/2002 at 0001 power was reduced to 90% to clean 23B waterbox. Power was returned to 100%

at 0845 after the completion of waterbox cleaning.

On 08/23/2002 at 0001 power was reduced to 92% to clean 22B waterbox. Power was returned to 100%

at 0845 after the completion of waterbox cleaning.

The unit operated at 100% power for the remainder of the month.